Job Recruitment Website - Recruitment portal - The supervisor of Qingdao Laoshan Quality Supervision Station asked rebar machinery to connect each floor of each building for testing. Are there any requirements in the specification? The great god t
The supervisor of Qingdao Laoshan Quality Supervision Station asked rebar machinery to connect each floor of each building for testing. Are there any requirements in the specification? The great god t
People's Republic of China (PRC) industry standard "Technical Specification for Mechanical Connection of Reinforcement" JJ107-2010.
7. Inspection and acceptance of joints on the construction site
7.0.l When mechanical joints of steel bars are used in the project, the technical provider shall submit an effective type inspection report. 7.02, before the start of the steel bar connection project, to deal with different manufacturers of steel joint process inspection; In the process of construction, the process inspection shall be allowed when the steel bar manufacturer is changed. Process inspection shall meet the following requirements:
1, there should be no less than 3 steel joint specimens of each specification;
2. The average tensile strength of each sample and the residual deformation of three joint samples shall comply with the provisions of Tables 3.05 and 3.07 of this Code;
3 After measuring the residual deformation, the tensile strength of the joint specimen can be tested, and the test should be carried out according to the uniaxial tensile loading system in Table A 1.3 in Appendix A of this regulation;
4. In the first process inspection, if the tensile strength of 1 specimen or the average residual deformation of three specimens is unqualified, it is allowed to take three more specimens for reinspection. If the reinspection is still unqualified, it is determined that the process inspection is unqualified.
7.03. Before installing the joint, check the product certificate of the joint and the batch number identification on the surface of the sleeve; The product certificate shall include the applicable steel bar diameter and joint performance grade, sleeve type, production unit, production date and production batch number, which can trace the mechanical properties and processing quality of the raw materials of the product.
7.04, on-site inspection must be carried out in accordance with the procedures of joint tensile strength test, processing and installation quality inspection; For structures with special requirements for joints, the corresponding inspection items shall be separately indicated in the design drawings;
7.05. On-site inspection of joints shall be carried out according to the acceptance batch. Under the same construction conditions, the joints of the same grade, type and specification of the same batch of materials shall be inspected and accepted as an acceptance batch, and less than 500 joints shall be counted as an acceptance batch.
7.0.6 After the threaded joints are installed, 65,438+00% joints shall be selected for tightening torque inspection according to the acceptance batch in Article 7.0.5 of this regulation. When the unqualified tightening torque exceeds 5% of the number of joints to be inspected, all joints shall be tightened again until they are qualified.
7.07 For each acceptance batch of joints, three joint specimens must be randomly intercepted in the engineering structure for tensile strength test and rated according to the design requirements. When the tensile strength of three joint specimens meets the strength requirements of corresponding grades in Table 3.0.5 of this discipline, the acceptance batch shall be assessed as qualified. If the tensile strength of 1 specimen does not meet the requirements, 6 specimens shall be re-inspected. During the reinspection, if the tensile strength of 1 specimen still does not meet the requirements, the acceptance batch shall be assessed as unqualified. 7.0.8 When the first pass rate of tensile strength test of continuous 10 samples in the acceptance batch is 100%, the number of joints in the acceptance batch can be increased by 1 times.
7.0.9 After the sampling specimen is intercepted on site, the rebar at the original joint position can be connected with the rebar of the same specification by lap joint, or repaired by welding and mechanical connection.
7.0. 10 For unqualified joint acceptance batches, the construction unit shall propose a treatment plan together with relevant parties such as designers.
- Previous article:How about the front desk work at Nanjing Panzi Women's Square?
- Next article:How long does coco work part-time a day?
- Related articles
- How to deal with the structured interview of teacher recruitment and qualification examination
- Pokemon Emerald Dream Gold Finger
- Manicure and eyelash copying short sentences?
- The best university in pathology.
- What about Tibet Xinxin Surveying and Mapping Engineering Co., Ltd.?
- Why do people pay headhunters to find jobs or find people when they apply?
- Liaoning Police College Registration Requirements
- Words and deeds that should be paid attention to in the interview
- What is the name of the sound controller for the Asian Games?
- Who lives in Beijing Hongkun Huayu Villa?