What's the difference between a building number and a builder?
For a construction project, if there are not many unit projects, the organizational structure of the project will set up a builder's post and implement on-site entity construction management. If it is a group unit project, for example, there are dozens of villas, the builder is generally responsible for setting up the building number long post, and everyone is responsible for the construction of several buildings. As for rights and obligations, each enterprise system is different and cannot be generalized.
Builders: Builders only need to do their own professional work in their assigned fields, cooperate with other builders and do a good job in coordination. Building number: the building number is generally responsible for the construction of the whole building. Strictly speaking, the length of the building is also a builder. It's just a wider range of responsibilities.
Builders: The requirements for builders are that they have certain working experience, qualification certificate and excellent professional skills, and there is no excellent requirement for working years. Building number length: Building number length is generally an old master or special talent who has worked for a certain number of years and is experienced in all aspects.
operating duty
First, assist the project manager to prepare for the commencement of the project, preliminarily examine and approve the drawings and construction scheme, and put forward technical measures and on-site construction scheme.
Second, the preparation of the total project schedule and monthly schedule and the monthly schedule of each construction team.
Three, carefully review the materials needed for the project, and strictly control the quality of the materials in the field.
Four, supervision and management of the construction site, in conjunction with the relevant departments to solve major quality and safety problems in a timely manner.
Five, to the jurisdiction of the professional team issued a construction task book, material requisition and construction technical disclosure.
Six, supervise and urge the construction materials, equipment comes into play on time, and in a qualified state, to ensure the smooth progress of the project.
Seven, participate in the project construction survey and pay-off.
Eight, assist the technical director for the blue prints.the design and technical disclosure.
Nine, participate in the project coordination meeting and supervision meeting, put forward and understand the problems in the process of project construction, and think, formulate solutions and implement improvements according to the problems.
Ten, to participate in the project completion center, responsible for the intact protection of the project.
Eleven, responsible for coordinating the work between the various subdivisional work of this project and between the construction teams.
Twelve. Participate in on-site economic and technical visa, cost control and cost accounting.
Thirteen, responsible for the preparation of construction logs, construction records and other related construction materials.
- Previous article:Where is the address of Impression Building in Handan Park?
- Next article:Reeward usually makes an offer in a few days.
- Related articles
- How about Ningde Tobacco Logistics Co., Ltd.?
- Warm heart bedtime story
- Measures of Wuxi Municipality on the Administration of Civil Unmanned Aerial Vehicles
- How about Jinzhou Classic Love Kindergarten?
- How about Hangzhou Weiquan Food Co., Ltd.?
- How to write nanny recruitment inspiration
- Brief introduction of Shenzhen grand theatre
- How to recruit for yangtze river international18th floor?
- Which hospital in Xi 'an is good for treating cardiovascular diseases?
- Which garage in Liuzhou is the best?