Job Recruitment Website - Recruitment portal - Is shanghai hongqiao railway station high-speed railway station?

Is shanghai hongqiao railway station high-speed railway station?

shanghai hongqiao railway station is high-speed railway station. Shanghai hongqiao railway station, located in Minhang District, Shanghai, China, is a railway station under the jurisdiction of China Railway Shanghai Bureau Group Co., Ltd., which started construction on July 2, 28 and was put into use on July 1, 21. The northern end of shanghai hongqiao railway station is connected with Beijing-Shanghai high-speed railway and Shanghai-Hanrong express passenger transport corridor, and the southern end is connected with Shanghai-Kunming high-speed railway and Shanghai-Hangzhou-Ningbo passenger dedicated line. It is a part of Shanghai Hongqiao comprehensive transportation hub and one of the important railway passenger transport hubs in East China.

shanghai hongqiao railway station:

shanghai hongqiao railway station and related projects were designed by the Third Railway Survey and Design Institute Group Co., Ltd., China Railway Fourth Survey and Design Institute Group Co., Ltd. and Shanghai Modern Architectural Design (Group) Co., Ltd., with the design concept of straightness, squareness and massiness, which embodies the Shanghai-style culture and the functional, systematic, advanced, cultural and economical construction concept of modern railway passenger stations. The total construction area of shanghai hongqiao railway station is about 44, square meters, of which the station building area is about 24, square meters, the canopy area without platform columns is 69, square meters, and only the railway passenger facilities such as waiting hall and ticketing hall are 145, square meters. The east-west length is 412 meters, the north-south width is 162 meters, and the building height is 42 meters. The main structure of shanghai hongqiao railway station is a steel-concrete composite structure, and the roof steel structure adopts the form of elasticity, ball casting and multi-limb support. The total steel consumption is nearly 8, tons.