Job Recruitment Website - Recruitment portal - What is the responsibility and scope of work of decoration supervision?
What is the responsibility and scope of work of decoration supervision?
Decoration supervision service process
1. Pre-supervision: Supervisors need to check and accept the new house, and supervise and manage the renovation drawings and expenses of the new house.
2. Obtain the owner's authorization to supervise the construction site: Decoration supervisors are professionals, and they need to be approved by the government and obtain relevant qualifications before they can take up their posts. They can be said to be third-party personnel independent of the owners and decoration companies. They are independent and impartial, and need to be entrusted and authorized by the owner to supervise the construction site.
3. On-site construction supervision: Supervisors need to supervise the construction of decoration materials, waterway reconstruction, circuit reconstruction, bricklayer, carpenter, paint and latex paint. , generally after the construction of the relevant acceptance.
4. Post-business services: After the renovation is completed, the supervisor needs to provide some business services such as quality inspection.
Key points of supervision work
1, self-check the starting conditions of each single project, and provide self-check data to the resident office;
2. Conduct on-site quality self-inspection for each working procedure or process to ensure that the materials, equipment and construction quality meet the requirements in the whole construction process and are recognized by the supervision engineer;
3. If defects are found in the construction process, take timely measures to record safety accidents and report to the supervision engineer in time;
4, according to the provisions of the sampling frequency, time and method for sampling and testing;
5. Timely detect the position, elevation and geometric dimensions of various parts of the project, and provide information for the supervision engineer to check for approval;
6, for each working procedure (process) or single (single) project after the completion of self-inspection and determination, cooperate with the supervision engineer for acceptance;
7. Analyze and sort out the quality of each project, establish quality files, and provide detailed construction materials when the project is completed and accepted;
8. Review the contractor's project progress plan (including construction organization design) and submit a written construction report to the Director's Office for approval;
9. Check the contractor's mobilization materials;
10. Review the contractor's construction machinery and equipment: (1) quantity, model, specification, origin, power, delivery date, intact rate and whether the machinery and equipment (including those planned to enter the site) have entered the site. (2) the mobilization of various construction machinery and equipment and the adaptability between the turnover plan and the project progress plan. (3) The matching and adaptability of various construction machinery and equipment meet the construction technical requirements. (4) If the construction machinery and equipment is insufficient or inappropriate, the contractor shall be required to make up the unqualified construction machinery and equipment within a time limit, and the contractor shall evacuate the site within a time limit to replace or replace the machinery and equipment, and shall obtain the consent of the supervision engineer in advance.
- Previous article:How about Zhuozhou Branch of Aerospace Information Co., Ltd.?
- Next article:How do I receive an order for standard parts?
- Related articles
- Is Jiangsu Liyang Guoqiang Factory tired?
- Yanhua Intelligent 201May 13 Should I suspend trading?
- How much is the lawyer's fee for Xinxiang lawsuit?
- What's the telephone number of Shanghai Le Tong Pipeline Engineering Co., Ltd.?
- How about the third phase property of Fengmeitang for the first time?
- Tianjin chengyu jewelry co., ltd. recruitment information, what about Tianjin chengyu jewelry co., ltd.
- How about xinzheng city Beibei Tiger Kindergarten?
- How about Beijing Yu Zi Clothing Co., Ltd.?
- How to take a bus from Fushan Road to No.2888 Lianhua Road in Hefei Economic Development Zone?
- Address of Gong Hao Hotel in Wanqing Town, Beiliu City