Job Recruitment Website - Recruitment portal - How does the shoe factory adjust the glue quantity of the glue passing machine?

How does the shoe factory adjust the glue quantity of the glue passing machine?

The steps for the shoe factory to adjust the glue size of the glue passing machine are as follows:

1. Turn on the main air supply of the equipment and start the equipment according to the menu prompts.

2. First, switch the equipment to manual mode and open the gas source and material pipeline valves of the equipment feeding system.

3. Return to the setting menu, press the setting key, and check and confirm whether the automatic glue discharging is in the closed state.

4. Manually discharge the glue, and install the mixing hose after confirming the state and normal flow of the glue.

5. Shutdown process: turn off the automatic glue discharging, switch to manual mode, open the equipment door and remove the mixing hose.

6. Drain the glue manually until it becomes smooth and the glue flowing from the three gas phases will not mix. Wipe the pipe head with a cleaning cloth and plug the drain hose at the blocked head.

7, press the emergency stop button, turn off the power supply, clean up the internal health. Close the main air source of the equipment, the air source of the glue supply system and the valve of the material pipe.