Job Recruitment Website - Recruitment portal - What are the safety precautions for casing running?
What are the safety precautions for casing running?
1. Check and prepare before running casing (1). Before running casing, the platform manager shall organize a mobilization meeting and a pre-shift meeting to clarify tasks, explain safety measures, and clarify the person in charge of each process. (2) When running casing, prepare the sling for hanging casing. (3) The derrick man is responsible for checking whether the special elevator valve is flexible and easy to use, whether the steps are intact or seriously worn, and whether the elevator pin meets the specified standards. (4) Technicians are responsible for organizing the diameter of casing into the well one by one. (5) The technician is responsible for checking whether the casing thread is damaged. Minor damage should be repaired before entering the well, and those exceeding the specified value and bent casing are not allowed to enter the well. (6) On-site casing shall be measured, numbered and marked by technicians. In particular, the serial position of the magnetic locating joint should be clearly defined. (7) The foreman is responsible for the system inspection and maintenance of the winch. Check whether the hook pin is open. (8) The safety officer and foreman are responsible for checking the wear degree of the rope, and checking whether the dead rope head screw and the fixed clamp of the dead rope fixer are loose. (9) The technician is responsible for checking whether the instruments used on the equipment are sensitive and accurate. (10) The back-up and lead tong men are responsible for preparing the casing tong and fixing the tail rope of the tong. (1 1) The derrick man is responsible for checking the fixation of the pneumatic winch, the suspension pulley and whether the wire rope is knotted or broken. (12) When lifting casing, the platform manager shall designate a special person to command, and others shall not command indiscriminately. (13) The derrick man is responsible for checking whether the drill pipe on the racking platform is stuck and fixed, and whether all kinds of ropes are coiled and fixed. (14) The safety officer is responsible for checking whether the crown block cover is fixed properly and whether the derrick pin is in the limit position. (15) The safety officer is responsible for checking whether the lighting of the derrick and the well site meets the requirements of casing running. (16) The drilling crew technicians are responsible for receiving casing running tools and checking whether the delivered tools are qualified and the certificates are complete.
2. Run casing (1), and pull the first casing onto the ramp with a pneumatic winch. (2) Hoist the casing into the rat hole with the traveling block. (3) When lifting the casing from the site, tie the casing firmly according to the casing number and sequence before lifting it. (4) When the elevator is pulled by pulley and rotating rope, the brake handle, cat head and wellhead operators should cooperate well. (5) Each operating procedure must be checked by a designated person. Every time 20 casings are run, the cadres on duty check all ropes. (6) When lifting the casing from the site to the drill floor, the operators of the site and the drill floor must retreat to a safe position, and shall not bump the casing into the drill floor. (7) When the casing is put on the drill floor, rope should be added in front of the gate, and the male and female buttons should wear hats and thread protectors. After the casing stops, remove the thread protector. There is a special person who is responsible for the thread protector on the drill floor, and it is not allowed to throw it around. (8) Technicians of drilling crew shall confirm the use of qualified casing sealing grease. (9) In the process of stabbing, straighten your body and put it down slowly. After cross-threading, slowly rotate the casing to lead out 2-3 threads to prevent cross-threading, or use the cross-threading device. (10) Make up with hydraulic casing tongs, and the torque value must meet the specified requirements. (1 1) After the casing is connected, the lowering speed should be controlled above 30s/ piece, and the casing should be lowered evenly. (12) When lowering is blocked, when lifting is blocked, the movable casing shall ensure that the tensile safety factor is not lower than 1.8, and personnel shall leave the wellhead. (13) When running casing, fill mud as required, and assign special personnel to observe the return of mud. (14) Run the large-diameter casing, and try to use chain tongs or crowbars to grind and thread it, so as to prevent the casing from being seriously damaged by cross-threading. (15) After casing running, the technician of the drilling team directs to connect the top joint, fill it with mud, and start the pump for circulation. (16) In case of personal injury accident during casing running, you should leave the site immediately, give first aid and send it to hospital for treatment.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:Recruit children overseas
- Next article:How to pay for Yancheng Xinao gas online?
- Related articles
- What are the top ten bad airlines in China?
- Top Ten Hotels in Wuhan Ranked Top Ten Hotels in Wuhan
- Who is now the director of the Heyuan City Reinsurance Bureau?
- Weiqiao Beihai New Area Power Plant
- What about Japanese chefs?
- Wages in china agricultural museum
- Summary of talent work in the first half of 2022 1500 words, 3 articles.
- Registration and registration conditions for Shantou Licensed Pharmacist Examination!
- What are the sub-district offices under the jurisdiction of Longchuan County, Heyuan City, Guangdong Province?
- How to punish Los Angeles without a massage license?