Project security door contract(2)

(6) Party B is responsible for promptly submitting to Party A the relevant engineering technical data and other relevant data that Party A (or the quality supervision department) has determined to be complete, complete and valid in accordance with relevant requirements, in triplicate.

(7) Fully cooperate with relevant departments in various inspections, supervision and management of the construction site.

(8) Party B entrusts Comrade to fully represent Party B to exercise all rights and obligations stipulated in the contract, and is responsible for on-site safety management during construction. Contact number: .

VII. Safe production and civilized construction

1. Party B shall strictly manage the construction in accordance with the requirements of Party A, abide by the safety production operating procedures, set up full-time safety officers, and take necessary measures safety protection measures to ensure construction safety. If a safety accident or other accident occurs, Party B shall bear full responsibility and bear all economic losses and expenses. Party A does not assume any responsibility.

2. Party B must abide by Party A’s safe and civilized construction requirements. The garbage during construction must be removed from the site by itself. Party B must not cause damage to Party A’s existing equipment and facilities during the installation process. Otherwise, Party B will be responsible for Party B is responsible for compensation or repair, and must bear a fine of double the repair fee to Party A.

3. If Party B’s own equipment (including various cables) fails to pass the inspection and is ordered to stop using and withdraw from the site, Party B must comply with it. If Party A does not withdraw from the site and continues to use it, Party A will be ordered to do so upon discovery. Party B will be fined 2,000 yuan per time.

8. Project payment

1. Party A shall pay a deposit of 20,000 yuan to Party B within 3 days after signing the contract (hereinafter referred to as: "first payment"). That is, RMB: 20,000 yuan (¥20,000 yuan)

2. After the installation is completed, Party A pays Party B 100,000 yuan (hereinafter referred to as the "second payment") within days, that is, RMB : One Hundred Thousand Yuan (¥100,000 Yuan)

3. After completing the settlement review and submitting all qualified completion materials, 95% will be paid, and the 5% warranty will expire in two years from the date of acceptance. All must be paid within three days.

9. Design changes and settlement:

1. During the construction, due to Party A’s reasons, the original project design needs to be changed, or the amount of work agreed in the contract needs to be increased or decreased, and other matters related to If the additional work related to the project needs to be changed, the contract price shall be changed according to the following methods:

(1) The contract price has been applied to change the project price, and the contract price shall be changed according to the method stipulated in the contract.

(2) If there is a similar change in the project price in the contract, the contract price shall be changed according to the prescribed method.

(3) If there is no applicable or similar price change for the project in the contract, Party B shall propose an appropriate change price, which will be implemented after confirmation by Party A.

Except for the above factors, Party B shall not charge any other fees. The project quantity to be certified shall be approved by the on-site engineer, budget officer, cost control department manager and engineering department manager of the contractor, and shall take effect after being signed by the project supervisor.

2. The settlement method of this project: According to the actual number of installed steel fireproof and anti-theft doors of different sizes, the corresponding comprehensive unit price = settlement cost.

X. Other Matters

1. Party B must have independent legal person qualifications, be an independent economic entity, and have a fire protection grade certificate, product type approval certificate, and product inspection report.

2. Party B must submit a standard model door that meets the requirements and related information. The actual product shall be subject to the sample. 11. Methods for resolving contract disputes: If any dispute arises during the performance of this contract, it shall be resolved through negotiation between the two parties. If the negotiation fails, the party will be sued in accordance with the law to the people's court where Party A is located.

12. After-sales service commitment.

13. Others:

1. This contract is made in five copies, with Party A holding three copies and Party B holding two copies.

2. This contract will come into effect when both parties sign and seal it and Party A receives the performance bond from Party B. The contract will be terminated after the project settlement payment and quality deposit are paid in full.

Party A (seal): Party B (seal):

Authorized agent: Authorized agent:

Telephone: Telephone:

Engineering security door contract sample three

Contractor (full name): (hereinafter referred to as Party A) Contractor (full name):

In accordance with the "People's Revolution of the People's Republic of China and the National "Contract Law", "Regulations on Contracting Contracts for Construction and Installation Projects", "Construction Law", "Construction Specifications and Quality Acceptance Specifications for Fire Protection and Security Doors in High-Rise Buildings", "Regulations on Safety Production Management of Construction Projects" and other relevant laws and administrative regulations. Following the principles of equality, voluntariness, fairness and good faith, Party A agrees to contract the "******" fireproof and anti-theft door project to Party B. Both parties reach an agreement on the construction matters of this project and enter into this contract.

1. Project overview

Project name:

《************》Project production and installation of fireproof and anti-theft doors for home entrance.

Project location: Contract scope and project content:

"******" project includes the production, installation, transportation and other work contents of home fireproof and anti-theft doors. Contracting method: Contracting work and materials

2. Contract duration

Construction start date: January 20, 2020 (the specific construction time will be subject to Party A’s notice) Completion date: January 20, 2020 Day

The total number of calendar days for the contract duration. (Calculated from the effective date of the contract)

3. Quality standards and requirements

The project quality standards are qualified. The production and installation of fireproof and anti-theft doors within the contract scope of Party B must comply with the current "Construction Quality Acceptance and Quality Inspection and Assessment Standards for Fire Protection and Anti-theft Doors in High-rise Buildings" and other relevant specifications. Construction must be carried out in strict accordance with the design drawings, and the construction quality must meet the standard at one time.

This project is designed as a Class B finished fireproof and anti-theft door. The grade of fire-proof and anti-theft doors must meet the requirements of the specification: the fire resistance limit of Class B fire-proof and anti-theft doors is not less than 0.9h; the non-combustible materials filled in the door leaf must meet the requirements of the specification; the production and installation of the fire door must ensure that the welding is firm and the welding parts are polished smooth; the door frame leaf It should be straight and smooth, with no convexity or warping on the surface; the topcoat should be even, smooth and free of paint build-up, pitting, bubbles, missing paint, peeling and bleeding; hardware accessories (hinges, fire seals, handles, etc.) must be It is a finalized supporting product that has passed the inspection by the national fire inspection agency.

IV. Material and color requirements

The style of fire-proof and anti-theft doors is six square blocks (two-and-a-half doors), red peach wood grain paint (subject to the sample door), front and back The steel plate thickness is 1.0MM, the door frame steel plate thickness is 2.0MM, and the door frame and door leaf are both Pangang cold-rolled steel plates. The configuration and craftsmanship of the double and double doors are subject to the sample.

5. Project cost:

Project budget cost: (in capital letters) approximately: 10,000 yuan (RMB)

The project cost shall be based on the final settlement cost.

VI. Project unit price and included work content

(1) Unit price of fire-proof and anti-theft doors: The unit price of finished Class B fire-proof and anti-theft doors is 1,350.00 yuan/unit.

The above are all comprehensive unit prices and include taxes and fees. Construction plan technical measure fees, safety technical measure fees, civilized construction fees, inspection and test fees, etc. and all other expenses will no longer be included in the unit price. Including material price changes, no adjustment will be made, and material loss will not be charged separately. If the household owner needs to install a spy mirror and doorbell, Party B will be responsible for the unified installation after comprehensive acceptance, and the cost will be negotiated separately by Party A and Party B.

(2) Work content included in the unit price

Material procurement, transportation, guarding and protection of semi-finished and finished materials, on-site secondary and more than two transfers, production and installation, and finished products protection and all process contents.

7. Confirmation of project quantities

Calculate the area according to the door frame specifications and dimensions required by the specification. The specifications of the double and double doors are 1160MM~2050MM. According to the double and double doors in the design drawing, The quantity and installation shall prevail. Settlement cost = actual fireproof and anti-theft door area? Contract unit price

8. Party A’s rights and responsibilities

1. Party A provides a set of engineering design drawings when the contract is signed.

2. Responsible for coordinating in a timely manner the relevant matters that Party B needs to solve during the construction, so that Party B's construction progresses smoothly, actively organize and coordinate the acceptance of project completion, and cooperate with Party B to handle completion settlement.

3. Party B is responsible for providing Party B with access points for the required construction electricity, and Party B shall install, install, use and manage the meters by itself. The electricity costs shall be borne by Party B. Party A provides the warehouse location, and Party B is responsible for its own care and management.

4. Pay the project fee as agreed in the contract.

5. Party A is responsible for repairing the fire-proof and anti-theft door openings, filling the gaps tightly after installation, and plastering the edges of the holes. At the same time, before the construction elevator is dismantled, Party A is responsible for coordinating the vertical transportation of fire-proof and anti-theft doors using the on-site construction elevator.

6. If Party B fails to carry out construction in accordance with the design drawings and specifications, fails to perform the contract and uses substandard products, Party A has the right to unilaterally terminate the contract and Party B shall bear the responsibility to Party A economic losses caused.

9. Party B’s Rights, Obligations and Responsibilities

1. Party B should carefully check the design drawings before construction. If it is found that the design drawings are inconsistent with the actual site and are incorrect, Party B will A report should be made to Party A in a timely manner, and technical verification and resolution should be made in a timely manner. If no problems are discovered before construction, Party B will be responsible for the losses caused by errors discovered during construction.

2. Based on the design and construction drawings provided by Party A, Party B will carry out construction in strict accordance with the current "Construction Specifications and Quality Acceptance Specifications for Fire Protection and Theft-proof Doors in High-rise Buildings" to ensure that the project quality meets the standards.

3. If Party B damages semi-finished products or finished products of other construction units during construction, Party B shall be responsible for compensation or complete repairs. At the same time, Party B must obey the on-site civilized construction and other management of the civil construction unit.

4. Party B’s project manager and technical person in charge of this project must hold certificates to work, must match the names stated in the construction organization plan, and cannot leave their posts without authorization.

5. Party B must provide Party A and the supervisor with various qualification certificates required for construction before entering the construction site;

6. Party B must provide Party A’s on-site representatives and The supervision engineer shall submit a feasible construction organization design plan, technical measure plan, safety measure plan, project progress plan report and product inspection report, and the construction will be allowed to proceed only after review and confirmation by Party A and the supervision engineer. The construction plan that has been reviewed and confirmed shall not be allowed to proceed. as the basis for settlement.

7. The materials, specifications, and product quality of the fire-proof and anti-theft doors installed by Party B must comply with the design and specification requirements, and the use of unqualified products is strictly prohibited. The dimensions of the fire-proof and anti-theft doors shall be measured by Party B on-site and combined with the actual elevation of the floor tiles during civil construction. After Party B completes the installation of fire-proof and anti-theft doors, each door will be provided with 2 decoration keys and 6 delivery keys.

8. Party B must accept the monitoring and management of project quality, safety and progress by Party A’s on-site representatives and supervisors; products entering the site must have product certificates, material certificates and inspection reports, and report them to Party A in a timely manner Party A’s on-site representative and the supervisor shall sign and confirm the inspection, and provide the fire-proof and anti-theft door sampling inspection report, and it can be used only after it is qualified. If the incoming materials are used without Party A’s on-site representative and the supervisor’s signature and inspection, they will be removed from the site and will not be counted. cost.

9. Party B must carry out construction in strict accordance with the current "Construction Specifications and Quality Acceptance Specifications for Fire Protection and Security Doors in High-Rise Buildings" and the content and construction process requirements agreed in the contract, and conduct self-inspections and functions item by item. The competent department shall conduct sampling inspections one by one to meet the qualification standards. Only after each process in the construction has passed the inspection will the next process of construction be allowed to proceed. The test costs for fire door sampling inspection shall be borne by Party B.

10. During the construction, if Party B finds that the quality does not meet the requirements through inspection by Party A’s on-site representatives and supervisors and requires rectification or rework, Party B must make rectifications and improvements in a timely manner until the quality standards are met.

11. Party B is responsible for the protection of the finished product before the completion of the project and comprehensive acceptance.

12. Strictly abide by all rules and regulations on site safety management of Party A and other civil construction units, and obey Party A’s arrangements.

13. Pay the wages of migrant workers on time. If Party B defaults on wages of migrant workers, Party B will be responsible for all the consequences and responsibilities. And compensate for the economic losses caused to Party A.

14. Party B is responsible for collecting, compiling and compiling complete completion materials and drawings and completing the project filing procedures, and shall bear the costs incurred therefrom.

10. Safe Construction

1. Party B must strictly abide by the "Safety Production Management Code for Construction Projects" and other relevant safety laws and regulations during construction to ensure safe production.

2. Party B must abide by the relevant management regulations on production safety in construction projects, organize construction in strict accordance with the production safety management standards, and accept safety inspections and supervision from Party A, the supervision team and industry authorities at any time. The contractor shall be responsible for all safety accidents caused during construction and all costs incurred therefrom.

11. Project Completion Acceptance and Payment Method

1. Completion Acceptance

(1) Project Completion Acceptance, in accordance with the current national "Fire Protection of High-rise Buildings" , Security Door Construction Specifications and Quality Acceptance Specifications" as the basis for project completion acceptance.

(2) Completion acceptance shall be subject to the comprehensive acceptance of the completion of the third phase of the "Cannes Oasis" organized by Party A; if any rectification suggestions are raised during the acceptance, Party B must make rectifications and improvements in a timely manner as required, and It shall be deemed to be qualified upon inspection.

(3) This project has been completed and has not been comprehensively accepted. Party B will be responsible for the protection of the finished product before delivery.

(4) Within 5 days after the completion acceptance of the project, Party B shall provide Party A with complete and complete completion materials and two sets of completion drawings.

2. Payment method:

85%. Within fifteen days after the comprehensive acceptance of the project is completed and the settlement is completed, Party A will pay Party B 97% of the total cost of the project, and the remaining 3% will be used as warranty money. The warranty deposit must be paid within one month after the warranty period expires, and the warranty deposit does not include interest.

12. Construction period agreement

1. If power outage and on-site cross-operations and force majeure factors are not caused by Party B, resulting in shutdown, Party A’s on-site representative and supervisor will confirm the shutdown time and construction period. If the delay is postponed accordingly, Party A will not make any compensation.

2. Due to Party B’s responsibility, the construction cannot be started as scheduled or the work is stopped midway without reason, which affects the construction period and the construction period will not be postponed. For one day beyond the contract period, Party A will be fined RMB 500.00 per day, which will be deducted from the project progress payment. And bear the economic losses caused to Party A due to the delay in construction period.

13. Project Warranty

The project quality warranty period is one year, and the warranty time is calculated from the date when the project passes the comprehensive acceptance. If warranty is required during the warranty period, Party B will receive Party A or the property management company must go to the site to perform maintenance within two days after being notified. If Party B does not arrive on site to perform maintenance on time, the expenses incurred by Party A in organizing the maintenance will be doubled by Party A and deducted from Party B's warranty deposit.

14. Liability for breach of contract

Both parties must conscientiously perform the provisions of this contract. Party B must complete it within the specified time with quality and quantity. If it fails to complete on time or fails to meet quality standards, it will be deemed as For breach of contract, the breaching party shall compensate the other party in accordance with the national contract law and relevant regulations, and the breaching party shall bear all economic and legal responsibilities.

15. This contract is made in four copies. Party A and Party B each hold two copies. It will take effect after being signed and sealed by both parties.

16. This contract will be terminated upon completion of performance by Party A and Party B.

Contractor (official seal): Contractor (official seal):

Residence: Residence:

Legal representative: Legal representative:

< p> Year, month and day: