Job Recruitment Website - Recruitment portal - Summary of highway professional and technical work

Summary of highway professional and technical work

Introduction: Engineering feasibility study is an important part of the preliminary work of capital construction projects, and it is also the main basis for the establishment and decision-making of construction projects. The following is a summary of highway professional and technical work that I share with you. Welcome to learn!

Article 1 Summary of Highway Professional and Technical Work

My name is xxx, and I am an employee of the Road Management Section in xx District. 1995 Since joining the work, I have been mainly engaged in highway maintenance. Working for nearly 20 years, I have cultivated my down-to-earth and meticulous work attitude. With the care and support of leaders and colleagues, my political ideology and morality have been improved, my professional skills have been greatly improved, and my work achievements have been well received by leaders and colleagues. Looking back on my past work, I feel that I have lived up to the training and care of the party and the people, and I have changed from training to a highway maintenance worker. Since joining the work, I have abided by the rules and regulations of the unit, actively obeyed the work arrangement of the leaders, worked hard, worked hard, earnestly studied the relevant knowledge of highway maintenance, and constantly enriched and improved myself. Working hard, we clearly realize that with the progress of science and technology and the increasing traffic demand, there is still a lot of work to be done before us.

In recent years, highway water damage mainly includes subgrade subsidence, subgrade collapse, bridge damage, protection and reinforcement engineering damage and so on. Highway water damage should focus on prevention, eliminate hidden dangers of water damage in time, and nip in the bud. As long as we pay attention to water damage from the aspects of highway design, construction and maintenance, and take corresponding measures, the water damage of highway will be effectively controlled.

When there is too much rain in spring, which is not conducive to the traffic on asphalt pavement, three main treatment measures are taken: (1) open trench excavation on the shoulder: from the beginning of spring, a horizontal open trench is excavated every 6-8 meters on the shoulders on both sides of the frost boiling section. Drain the water in time and remove the moisture on the road surface. (2) Dig an open trench on the cross section or subgrade to avoid water accumulation on the pavement. (3) Digging a seepage pit, that is, digging a pit with a diameter of about 20-40cm in the section which is easy to boil, and taking out the pit water manually on a regular basis to sum up experience.

In the process of highway maintenance for many years, through the combination of theory and practice, I summed up some matters needing attention in asphalt pavement repair: asphalt pavement repair should be standardized, round hole square repair, shallow hole deep repair and deep hole layered repair, which are divided into the following steps:

1, dig a hole first, or use a cutting machine, four directions are standardized, vertical:

2, cleaning the waste residue in the hole, conditional blow clean with a road blower;

3. Apply a little asphalt to the hole to prevent the asphalt from sticking to the road surface;

4. Pour the hot-mixed asphalt, smooth it and sweep it evenly;

5. Use a road roller or a plate rammer to flatten and repair the potholes;

No matter at work or in life, I always believe that no pains are rewarded, so I have been studying hard and working hard. Love your job, be able to treat every job correctly and seriously, be dedicated and love your post, get to work on time, make effective use of working time and stick to your post. Under the present situation of long maintenance mileage, few maintenance personnel and heavy tasks, I can follow the class to ensure the timely completion of tasks and the quality of highway maintenance. I also often know some books about protection. It has well established the arduous struggle spirit of contemporary road maintenance workers in China and carried forward the good quality and image of contemporary road maintenance workers in China. In the past twenty years, I have been strict with myself and applied theoretical knowledge to highway maintenance, which has achieved certain practice and good social and economic benefits. Although I just try my best to do things and be a man. But I have a clear conscience and carry out maintenance in strict accordance with (technical specification for highway maintenance). As a qualified highway maintenance personnel, I have performed the duties of maintenance personnel well and consider myself a qualified highway maintenance personnel. In the future work, I will work harder, constantly improve my professional technical level of highway maintenance, and better complete the tasks assigned by the leaders.

The above is the main technical work I have been engaged in for so many years. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have really made great gains and progress. Achievements and shortcomings coexist, and experience and lessons go hand in hand. I will continue to work hard, keep learning, sum up experience, learn lessons, and strive to achieve better results in the future highway maintenance work.

Chapter II Summary of Highway Professional and Technical Work

First, rich professional knowledge is the premise of engaging in professional and technical work.

Since joining the work, I have been guided and cared by the bureau leaders, and have been engaged in professional work related to highway survey, highway design and budget. After several years of work practice and study, I have accumulated some professional theoretical knowledge. Engaged in highway survey, highway design and budget work successively. As an engineer, we should make a good plan in our work and arrange each working procedure and production factors reasonably. Do a good job in manpower, materials, equipment, technical preparation, peripheral relations and so on required for subsequent projects in advance. Ensure that when the follow-up work is implemented, there is no hurry, no shortage of east and west, and the construction period will not be affected.

At work, personal work attitude is also very important, and the tasks assigned by the leaders must be completed as required, and cannot be delayed or perfunctory. Special circumstances can not be completed on time, should be reported in a timely manner. Convenient to solve the problem as soon as possible.

The work of technicians is also hard. During the day, they have to climb up and down the construction site to guide the construction, and at night, they have to sort out the inner pages of the day and arrange the work for the next day. This requires a hard-working spirit, and the work of the day is completed on the same day, and it will never be put off until the next day.

Technicians work in the construction line and are responsible for the quality, safety and progress in the construction process. Timely report the problems that need to be solved and improved in the construction, and put forward solutions to the leaders. In the work, we should deal with the relationship with the construction personnel and the supervision owner, and everything is based on ensuring the progress, quality and safety.

All kinds of internal page data and quantity confirmation data formed in the construction process shall be signed by the supervision engineer in time, so as not to affect the later measurement.

Two, strict standards, strict requirements, and strive to make professional and technical work to a new level.

I have always been strict with myself, combined with theoretical knowledge applied to highway construction, and achieved certain practice. Construction shall be carried out in strict accordance with Technical Standards for Highway Engineering and Standards for Inspection and Evaluation of Engineering Quality. As a qualified technical director, I have strict requirements on engineering quality, be a good assistant to the leader, dare to innovate and explore in technology, and sum up practical experience. During my years in office, I have performed my duties as a technician well.

In recent years, we have done a lot of work for the society and the highway industry. In order to adapt the professional technical level and professional technical working ability to the development of highway, we need to continue to learn professional technical knowledge, sum up experience, enrich our professional theoretical level and practical construction ability, push professional technical posts to a new level, and do our part for the development of highway construction.

Article 3 Summary of Highway Professional and Technical Work

Hongsheng Company deepened internal reform, promoted management innovation, optimized industrial structure, enhanced its competitive advantage, and achieved a year of rapid, strong and stable development. This year, we conscientiously implemented the work arrangements and requirements of the group company, United as one, worked hard and worked hard. Through the joint efforts of all cadres and employees, we have exceeded all budget targets and promoted the sustained, safe and stable development of Hongsheng Company. Mainly in the following six aspects:

First, production and operation continued to run smoothly, various economic indicators increased substantially, and production and operation performance rose strongly.

At the end of 20XX (excluding Jinsheng Company in the following data), the total assets of the enterprise were 2137 million yuan, an increase of 7100 million yuan, with an increase of 49.25%.

-The total production and operation in the whole year was 3.249 billion yuan, an increase of 697 million yuan or 27.438+0%. These include:

The construction and installation plate is 96 1 10,000 yuan;

Automobile transportation logistics sector 425 million yuan;

The coal comprehensive service sector is 65.438+0.45 billion yuan;

Mining materials sector 363 million yuan;

Other 50 million.

-The total annual profit is 65,438+065,438+006,438+0,000 yuan.

The annual tax payment was 75 million yuan.

-The per capita income of all employees increased by 54 12 yuan, an increase of 12.59%.

The above indicators show that with the help of all cadres and employees, we have successfully completed all the economic indicators issued by the group company in 20XX. The development strength of the enterprise has been further enhanced, and the rights and interests of employees have been further guaranteed, laying a solid foundation for the company's leap-forward development in the Twelfth Five-Year Plan.

Second, firmly establish the concept of "safety above all else", unremittingly do a good job in safety management, and the situation of safe production has improved steadily.

In 20XX, we actively built a "great safety" management system according to the safety work idea of "unified leadership, graded responsibility, graded monitoring and independent management", consolidated the safety foundation, strengthened on-site management, intensified the investigation of hidden dangers and strictly investigated the responsibility for accidents, thus creating a good safety environment for the company's production and operation.

First, the Company's Safety Document No.1 was earnestly implemented, and a safety objective responsibility letter was signed with subsidiaries and government departments, and a safety production management agreement was signed with subcontractors, so that the company's safety objectives and indicators were decomposed layer by layer, and a "big safety" management responsibility system was constructed from horizontal to vertical. Continue to strengthen safety education and quality training for employees, with 4 125 person-times of training throughout the year.

Second, strengthen on-site management, move forward the safety protection barrier, formulate the company-wide 1469 monitoring measures for the prevention of dangerous sources, organize the safety acceptance of the start-up and resumption of 53 projects, implement the "on-site safety listing operation" method, and increase the frequency of supervision and inspection of key projects such as Jinmei Avenue, Chengzhuang No.4 air shaft and Jiafeng Trade City to ensure safe construction.

The third is to carry out the work of "safety technical consultation" in a down-to-earth manner, and formulate system safety technical standards for four categories of safety, technology, fire protection and occupational health: underground construction, building construction, fixed factory production and road transportation. At the same time, strengthen the investigation of hidden dangers and carry out special rectification of professional systems and operating points with more hidden dangers. A total of 6055 hidden dangers were investigated in the whole year, and the rectification rate of hidden dangers reached 100%.

Fourth, strict accountability for accidents and strict rewards and punishments for safety issues. The company investigated the fact of the "722" foundation trench collapse accident of the construction and installation branch, analyzed the reasons, made clear the responsibilities, and severely punished those responsible for the accident. At the same time, take this as a mirror, organize safety reflection activities, ring the alarm bell at all times, and promote the change of safety production situation.

Third, according to the idea of "returning to the core", adjust the industrial layout, promote the internal linkage of the plate, make great efforts to strengthen internal expansion, and the pillar industries will flourish.

1, building installation plate

Building engineering is our "housekeeping work". Over the past year, Jian 'an Branch has made great efforts to consolidate its management foundation, improve the quality of its team, innovate its business model, and made solid steps in seizing opportunities, opening up markets and establishing its image. In 20XX, the construction and installation branch first set foot in the construction and development of high-rise buildings. Large-scale projects, such as Zhaozhuang Coal High-rise Apartment and No.2 Building in Jinbei Residential Area, have been deployed in strict accordance with the standardized site from the beginning of construction, so as to achieve "quantification of equipment entering the site, unified stacking of materials, formatted construction layout, civilized, clean and standardized, standardized safety facilities and standardized operation behavior". In terms of basic team building, we will expand the scope of conscription, involving many provinces and cities, and focus on recruiting demobilized soldiers with excellent physical and political qualities. In the aspect of independent training of senior architectural talents, 3 1 person took the first-class constructor exam, and 3 people reached the qualified line. 73 people took the second-level constructor exam and passed 15 people. At present, the construction and installation branch has a first-class constructor 10, and 87 second-class constructors (including 80 in construction and 7 in highway). In the course of operation, Jian 'an Branch actively explored innovative business models, and adopted the mode of pre-financing for urbanization reconstruction projects in Shidian District, North of Jincheng City, such as relocation building in Nanshidian and relocation building in situ, which not only opened the external market in a short time, improved the efficiency of capital use, but also enhanced the overall external image of Hongsheng Company. Work report "Highway Professional and Technical Work Report".

Especially during the construction of Jinmei Avenue, the construction and installation branch tried its best to overcome the impact of the torrential rain that has never happened in 50 years on the construction period, and successfully realized the two-way traffic of Jinmei Avenue as required, which benefited the family members and resident residents of the group company in advance, and was unanimously recognized by governments at all levels and the leaders of the group company, fully demonstrating the excellent quality of Hongsheng's courage to face difficulties, challenges and tenacious struggle.

Mine Construction and Installation Branch has made great efforts to innovate, successfully introduced "grouting and anchor injection method" and actively explored the new technology of "drilling construction method". A standardized, reasonable and efficient project management system and mechanism is gradually taking shape. They insist on "two legs" to explore the market, strive for and consolidate the internal market of the group company to the maximum extent, fully tap their own resources and advantages, actively "go out" and strive to expand the external user base of the group company. At present, five first-phase projects of resource integration mine have been won, and it is estimated that about 10 will be won this year. Since August, 20XX, Mine Jian 'an Branch Company has undertaken the tasks of resource integration, mine equipment recovery and mine landfill, and has successfully completed the landfill work of Jinzhuang, Longdong and other small coal mines. At the same time, an agreement was reached with Shazuizi Coal Industry Co., Ltd. of Inner Mongolia Yidong Group, and the underground coal roadway excavation project of the contracting company was about 65,438+100,000 m/year, which was a major step to open up the market outside the province. On June+10, 5438, with the strong cooperation and support of the group company and Daikuang, the integration and recruitment of the underground labor contracting team of the group company began. At present, there are 2,898 registered employees, of whom 1377 have signed labor contracts. The organization and construction of various mine engineering teams have been initially completed, and all mine engineering teams have started their work. Through many efforts and coordination, the needs of employees' accommodation, life logistics and so on have been basically guaranteed, and now all the work is in full swing.

In 20XX, the construction and installation branch and the mine construction and installation branch ranked 20th and 24th respectively in the comprehensive evaluation ranking of coal construction enterprises in China, and the Deyi office building project of Sihe Mine and the shaft project of Busan in Changping won the title of high-quality project of the Coal Construction Association. The brand image of Hongsheng's construction industry has been recognized by the market again and is gradually rising.

In 20XX, Bandung Real Estate Company continued to make important progress in the relocation of Yamei Village. First, cooperate with the relevant offices of the group company to revise and improve the management measures for the relocation of the coal-pressing village, and further rationalize the working procedures. The group company gave corresponding answers to the seven villages that need to be relocated in the near future declared by the production mines. Second, the main residential projects in Dongwagou Natural Village and Laojia Natural Village of Guohe Village in Dadonggou Town of Zezhou County have been completed; The house selection work of Sijiashan New Village in Dadonggou Town, Zezhou County is coming to an end; The relocation project of Xiaodongshan Natural Village in Zhengcun Town, Qinshui County was reported to the Group Company for approval. Third, the agent construction project of Sihe Mine staff apartment has entered a comprehensive final stage. It is expected that the overall completion, handover and entry will be realized by the end of March this year. Fourth, the construction project of administrative and cultural center in Zezhou County has been completed, and the Master Plan for Project Development and Construction has been compiled, and an understanding has been reached with relevant parties on the implementation of the project.

Jin Run Landscaping Co., Ltd. takes brand building as its purpose, takes market demand as its guidance, and constantly explores the market by persuading the company to be stable inside and expanding outside. First, actively provide technical support and services for the treatment of waste hills in Gushuyuan Mine, and at the same time accumulate rich experience in environmental treatment of waste hills. Second, taking the opportunity of creating a "livable Jincheng", through our own active efforts, we have won wide acclaim in the greening projects such as the North Entrance of Jincheng, Baimasi Forest Park and Ring Road. Third, continue to work hard on standardized management, actively try three construction organization modes: labor subcontracting (clearing packages), professional subcontracting and self-construction, standardize management behavior, and work hand in hand with Jincheng Bureau of Landscape Architecture to reach the investment intention of Qilingdian nursery project, laying a solid foundation for large-scale development in the future.

2, coal comprehensive service plate

In 20XX, the group company determined Hongsheng Company as the lead underwriter of resource integration mine coal. Coal Comprehensive Service Branch has keenly grasped business opportunities, accurately grasped the market pulse, standardized sales procedures, vigorously coordinated external relations, consolidated old users and developed new users, and sold 2,752,600 tons of coal throughout the year, creating considerable economic benefits for the company. In the aspect of tailings treatment, the production process of tailings is re-standardized, the control and management of production cost are strengthened, and the continuous and efficient operation of equipment is ensured. Annual processing and distribution tasks10.5 million tons. At the same time, speed up the land examination and approval procedures of Dongshangcunwei coal processing project, and strive for early construction, early production and early profit.

It is worth mentioning that Qinyang Jinhong Company changed its management mode, standardized the site and expanded its production capacity, which played a leading role in the Central Plains market. In the case of sufficient and stable coal sources, the company sold 295,200 tons of coal and slime, completed production and operation of 654.38+82 million yuan, and realized a profit of 4,369,200 yuan.

As a new project cultivated by the company, the project working group of coal processing and comprehensive utilization distribution center conducted in-depth investigation and analysis on the main body of resource integration and the distribution of integrated mine resources in Jincheng area, and put forward six construction schemes of coal processing and comprehensive utilization distribution center projects, including Dadonggou in Zezhou, Bagong in Zezhou, Lichuan in Zezhou, Ding Dian in Yangcheng, Qin Chi in Yangcheng and Longgang in Qinshui, which have been put on record by the provincial development and reform commission and included in the key projects of Jincheng Municipal Government in the Twelfth Five-Year Plan.

3. Automobile traffic logistics plate

In the past year, under the premise of achieving business objectives, Yun Sheng Company devoted its energy to improving the internal strength of management. At present, Yun Sheng Company and Fangxing Branch have 387 vehicles of various types, including 204 gas vehicles and 0/83 fuel vehicles. Facing the new situation of expanding transportation scale and increasing management difficulty, they updated their management concepts and ideas, focused on increasing income and reducing expenses, improved the management mode of vehicle external repair, standardized and controlled the proportion of vehicle external repair, and effectively reduced the cost of repairing materials. In July, 20XX, Huangtou Base was put into use, which provided a guarantee for solving some important problems such as shift change of vehicles and drivers, refueling in vehicle operation, safe parking of vehicles and reducing potential safety hazards in vehicle operation.