Introduction of Guodian Chengdu Jintang Power Generation Co., Ltd.

The preliminary work of the 2×600MW coal-fired unit project of the first phase of Chengdu Jintang Power Plant of Guodian started at 5438+0 in June 2003, and the construction started at 5438+0 1 in June 2004. The three main equipments are all designed and manufactured by Dongfang Electric Group, and the high-efficiency electrostatic precipitator and flue gas desulfurization device are built simultaneously. The two units were put into production in 2007, which is the largest unit capacity built by Guodian Group in Sichuan.