Job Recruitment Website - Recruitment portal - Weihai thermal power plant 24-hour service telephone

Weihai thermal power plant 24-hour service telephone

24-hour service telephone number of Weihai Thermal Power Plant: 063 1-5 196000? .

Weihai Thermal Power Group Co., Ltd. (hereinafter referred to as "the group company") was formed by the merger and reorganization of the former Weihai Thermal Power Group Co., Ltd. and the former Weihai No.2 Thermal Power Group Co., Ltd. in July 2065438+2009, and is a wholly state-owned enterprise. At present, the group company has 6 heat source companies, 3 heating companies and 1 new energy company.

The group company is responsible for producing steam and heating in winter for residents of enterprises and institutions in Weihai Central City, Wendeng District, Comprehensive Insurance Zone, Rongcheng Haoyunjiao Tourist Resort and other regions, with 784,000 online heating users and an online construction area of 90.77 million square meters. The total assembly furnace capacity of the group company is 5 130t/h, and the total installed capacity is 578MW;; The annual external steam supply is 365,438+million tons.

Heating and power plants

Due to objective facts, it is impossible for thermal power plants to take the same route as large power plants to "bid for the Internet". The installed capacity of thermal power plant is restricted by the size and nature of thermal load, and the unit size is much smaller than the main engine of thermal power plant. Thermal power plants generate electricity and heat, and the boiler capacity is larger than that of thermal power plants of the same scale.

Thermal power plants must increase more boiler capacity than ordinary thermal power plants, and the water treatment capacity is also large. Thermal power plants must be close to the heat load center, often the town center in densely populated areas, and their requirements for water use, land acquisition, demolition and environmental protection are much higher than those of thermal power plants with the same capacity, and a heating pipe network is also built. ?