Construction significance of Baicheng Chang 'an Airport
There are 3 berths (3C) in the civil aviation station in this phase, and the navigation apron (1C4B) of 5 berths is set according to the design of self-sliding in and out of the aircraft. According to the evaluation suggestion of China Consulting, the civil aviation and navigation apron will be merged. 1, flight area project. Build a 2500m× 45m runway with shoulder width of1.5m on both sides; Turn flat roads and 60 m× 48 m anti-blowing flat roads are set at both ends of the runway; A vertically connected taxiway of 236.5m× 18m is set between the runway and the station platform, with three C-class seats with shoulder width of 3.5m on both sides, platform size of 170m× 122m and shoulder width of 3.5m around. ..
2. Air traffic control project. Including air traffic control engineering, communication engineering, civil aviation engineering and meteorological engineering.
3. Navigation lights, power supply and lighting works in the flight area. The main descent direction (northeast) of the runway is equipped with Class I precision approach lighting system, which is 900 meters long; The second descent direction (southwest) is equipped with B-type simple approach lighting system, which is 420 meters long. And lighting facilities such as runway center line, sidewalks, entrances, U-turn apron, ramp lights, station platform lights, etc.
4. Terminal project. Build a 4500 square meter terminal with a parking area of 4000 square meters.
5. Freight engineering. Construction of170m2 freight warehouse and 70m2 freight business room.
6, maintenance, field engineering. The joint construction area of the maintenance and field service room is 320 square meters.
7. Fire rescue project. Construction of 1 fire station with an area of 750 square meters.
8. Auxiliary production, office and living service facilities. Construction of12160m2 comprehensive office building and 840m2 comprehensive garage.
9. Power supply project. The airport has a 1 10kV central substation (including lighting substation) with an area of 65,438 square meters. The airport is a first-class load, and the total electricity consumption is about 1400kW.
10, water supply project. Construction of 1 270 m3 water supply station and 1 400 m3 reservoir.
1 1, rainwater, sewage and sewage treatment project. Newly built 1 sewage treatment station 80 cubic meters, 1 regulating tank 120 cubic meters, 1 garbage treatment station 30 square meters.
12, heating, refrigeration and gas engineering. Construction of1450m2 boiler room, with 2 kilometers of directly buried heating pipes.
13, oil supply project. In this phase, two 100m3 oil storage tanks, two crane unloading trestles and oil pump sheds, 1 699m2 oil depot,100m2 station building and 108m2 ground automobile gas station will be built.
14, general layout project. The hardened road surface in the terminal area is about 48,442 square meters, with a perimeter of 2,093 meters and five gates. The green area of the site is about 33,300 square meters.
15, vehicle configuration. ***30 vehicles.
16, supporting projects in different places. Off-site drainage works1000m block aqueduct construction; Introduce a 10KV power supply line to the airport from two directions, namely 15.62km and 19.36km respectively. Construction of two communication optical cables, the first 57 km and the second 37 km. Connect a 6.2km airport approach road, the standard is Grade I. ..
17, Navigation Base Project. Baicheng general aviation base will be built, including five aprons (1C4B) and 1C contact taxiways, a 4,500-square-meter hangar, and offices, expert buildings, canteens and other buildings.
- Related articles
- What about liyang city Golden Sun Labor Service Co., Ltd.?
- How to register junior three students in Cao Xian Santong Middle School?
- What about Changchun Guo Xuan Railway Engineering Co., Ltd.?
- Happy Camp Classic Funny Quotations
- How about Jiangmen Yihua Fire Engineering Company?
- Why is Taizhou meager profit living well?
- How to write the supervisor's work plan for the second half of the year
- Excuse me, I want to look at the recruitment information of Guangzhou Southern Talent Market in advance, where I can see the recruitment units and positions, thank you!
- How about the welder of Yunnan Jiantou Steel Structure Company?
- Can Shangrao Teachers College teach junior high schools?