Job Recruitment Website - Recruitment portal - Three-scaffolder labor contract

Three-scaffolder labor contract

Team is the most basic organization in the construction site, and construction safety accidents often occur in shelf teams. So what should we pay attention to when signing a scaffolder labor contract? The following is the scaffolder's labor contract I compiled for you. Thanks for reading it.

Scaffolder labor contract 1

Employer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereinafter referred to as (Party A)

Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereinafter referred to as (Party B)

According to the production needs, Party A contracts the scaffolding sub-project construction of this project to Party B. In order to clarify the responsibilities and obligations of both parties, the following agreement is signed by both parties through consultation.

1. Signing method: contract liquidation.

Second, the package price:

More than 0.000 yuan is calculated according to the construction area: RMB per square meter.

Fourth, the work content:

Basement construction scaffolding, foundation pit safety fence, facility site enclosure, scaffolding outside the main structure, lifting or landing platform installation of unloading platform, four-mouth protection, scaffolding with wall reinforcement, temporary facility protective shed, scaffolding laying, safety net enclosure hanging, overturning and dismantling, shelf joint embedding, scaffolding steel pipe painting, on-site transportation, lifting and dismantling of tower crane and construction elevator, and dismantled scaffold materials are neatly stacked and properly placed in designated locations. Abide by Party A's rules and regulations, quality and schedule requirements during construction, and do a good job of coordination.

Five, quality requirements:

1, the external scaffolding subdivisional work meets the relevant standards of Beijing and the standardized acceptance standards of the municipal safety supervision station.

2. If the erection fails to meet the standard requirements, it must be redone, and the expenses shall be borne by Party B. If it fails to meet the construction needs or delays, Party A will impose a daily fine of RMB on Party B and arrange other personnel to repair it.

3. Party B shall do a good job in quality technical disclosure and quality management within the team, and obey the unified command, quality supervision and command of on-site management personnel.

Six, safe production and civilized construction requirements:

1, Party A shall carry out the construction according to the project construction plan and safety technical operation procedures. Make safety disclosure to Party B and be responsible for supervision. In case of illegal operation, unauthorized construction and casualty accidents, Party B shall be responsible. In case of other accidents and the medical expenses are less than RMB, Party A shall bear Party B, and Party B shall bear at least RMB.

2. Party A shall regularly supervise and inspect various safety protection measures to ensure safety in production. Party B shall establish a safety guarantee system and strictly abide by various rules and regulations of the state and relevant departments. Without education, Party B shall not take up his post, implement the rules and regulations of this project department, and sign the safety responsibility book. Before work, Party A must make quality and safety disclosure and make records, and impose economic penalties on violations of safe production and civilized construction. The expenses for handling temporary residence permit and employment permit shall be borne by Party B. ..

3. Staffing procedures are complete, and "three noes" personnel may not be recruited. Operators must hold valid certificates, fasten safety belts and use personal protective equipment correctly. Party B must implement the "three inspections" system during construction. The quality engineer and safety officer of Party A shall be responsible for the quality and safety inspection and acceptance within the contracted scope, and strictly follow the acceptance procedures.

4. Party B shall do a good job in civilized construction on the construction site, clean up the site after work and pile it up neatly. And do a good job in cleaning and sanitation of the living quarters.

5. Family members and children of Party B's construction personnel will not arrange accommodation. In case of special circumstances, the project department must approve the permit and do a good job in family safety education. Children should be closely watched by their families, and all accidents should be borne by Party B.. Party B shall be responsible for the accommodation during the construction period.

6. If there is any conflict in the construction process, Party B shall report to the person in charge of the site in time. Seek a solution through negotiation. It is forbidden to gather people to fight. If you fight at the construction site, whether it is unreasonable or not, you will be fined RMB every time. Those who violate the law shall be sent to the public security organs for handling. The project department does not bear any expenses.

7. All personnel entering the construction site must go to the project department to handle the badge, and they must wear the badge at work. The team leader designated by Party B's contractor must be on site every day and ask for leave.

Seven. Payment method:

Party B shall pay RMB as the security deposit for project quality, progress, safety, public order and civilized construction. After Party B enters the site, Party A shall pay the living expenses of RMB yuan per person per month, including RMB yuan in cash per person per month. After the workload completed by Party B is verified and signed by the warehouse, safety officer, quality inspector, foreman and project manager, Party A will pay% before the main structure is capped and the rest will be paid in the month (end of the month) when the structure is capped.

Eight. Others:

1. In case of any of the following circumstances, Party A has the right to order Party B to leave the site, terminate the contract, confiscate the deposit, settle accounts according to 80% of the completed works, and use the remaining 20% as the start-up fund for the follow-up team.

A, automatic exit in the middle.

B, do not obey the management of the project department, and the type of work is poor.

C, each acceptance quality can not meet the required standards.

D, serious violation of public security management regulations.

2. The construction personnel involved by Party B are strictly forbidden to cook with electricity or open fire in the dormitory, and do not pull and connect wires indiscriminately. After investigation, the instrument was confiscated.

3. Tools and mechanical equipment provided by Party A must be regularly maintained by Party B. In case of natural damage, Party A is responsible for repairing; in case of man-made damage or loss, Party B is responsible for compensation and repair.

Nine, this contract is in duplicate, each party holds one copy, and it will take effect after being signed by both parties. When the payment is settled, it will be void.

Party A: Party B:

Year, month, sun, moon, sun.

Scaffolder's labor contract II

Party A:

Party B:

According to the construction needs, Party A subcontracts the project to Party B for construction. In order to facilitate the cross management of construction work between teams and groups, clarify the rights, responsibilities and obligations of both parties in the process of performance, ensure the construction quality of subdivisional work, strengthen the control of construction progress, and ensure the safe and smooth progress of the project, both parties sign the following contract through consultation and abide by it jointly.

I. Project name:

Second, the project site selection:

Three. Scope of contract:

All the construction contents within the scope of the construction drawings, that is, all the shelf works in this project. All drawing changes and technical changes during construction (including before construction) are included in the contract scope.

Iv. contents of the project:

1, indoor protective frame, outdoor operating frame, protective frame;

2. Install safety signs for the shelves;

3. Installation, maintenance, repair, removal, cleaning, transportation and stacking of all shelf materials;

4, corridors, passages, construction road protective frame;

5. Party B is responsible for labor protection articles such as safety helmet and safety belt used by scaffolder;

6. Double exclusive frame for external wall protection subject and decoration;

7, the building "four", "five limb" demolition;

8. Installation, removal, maintenance, on-site transportation, cleaning and stacking of frame works;

9. The safety operation certificate for special operators handled by Party B;

10, erection of vertical pole support frame and external scaffold of shear wall around foundation pit, and erection of foundation pit edge protection;

Crane loading and unloading platform main body 1 1, decoration 1 times, not less than 3 times per floor;

12, the external safety dense mesh safety net is installed, the first layer is hard protected, and the safety pocket net is hung layer by layer for hard protection;

13, erection and removal of indoor stair protective frame, erection and removal of multiple protections;

Five, the project contracting way:

1, this project is constructed by contract (including labor, quality, progress, safety, civilized construction and material saving). Party B shall be responsible for the hand-held tools, safety helmets, safety belts and other labor protection articles used by Party B. ..

2. Carry out the construction according to the construction progress and Party A's requirements.

Six, quality requirements:

1, according to the current relevant national standards or industry quality inspection and evaluation standards, and subject to inspection by Party A's technicians and quality inspectors at any time.

2. During the construction, Party B shall absolutely obey the supervision of Party A's supervisor. If the quality can't meet the specification requirements, the supervisor requires Party A to stop work for rectification, and the demolition of Party B's structures will affect Party A's construction, and the losses caused thereby shall be borne by Party B. ..

Seven, the construction period:

Party B's construction must meet the needs of assembly line operation, complete Party A's progress on time, and shall not delay the construction progress of other teams due to its own reasons.

Eight. Payment terms:

Nine, project management responsibilities:

A. Party A's responsibilities

1, provide all kinds of materials needed for the project in time to ensure that the construction requirements are met;

2. Be responsible for coordinating and handling the contradictory problems arising from the crossover operation of each operation team and other situations on the construction site, and try to avoid rework and repair due to inadequate cooperation. Party B must obey the handling opinions of Party A;

3, responsible for the project quality tracking inspection and quality supervision, responsible for the subentry project quality evaluation and acceptance;

4. Provide water, electricity and lighting for night construction;

5. Pay the project payment according to the schedule agreed in the contract.

B. Party B's responsibilities

1, before construction, you must be familiar with the drawings and make safety technical disclosure to the workers. All workers must be skilled workers, and the operation of special types of work must hold relevant certificates. Abide by laws and regulations, Party A's rules and regulations and management regulations, obey the command of Party A's construction management personnel, and do not embarrass Party A's personnel for any reason;

2. When the workers enter the site, Party B must provide the required certificates (ID card, special operation certificate, etc.). ), and the expenses incurred shall be borne by Party B;

3. Prepare the material plan in advance according to the process requirements and report it to the competent foreman for approval;

4. On-site operators must abide by various management rules and regulations, safety operation rules and regulations and existing laws and regulations;

5, the rational use of materials, without the consent of the competent foreman shall not be arbitrarily cut, offenders depending on the seriousness of each fine 200 yuan above;

6. Coordinate the working procedures of relevant teams in the flow process, without making things difficult;

7. Party B shall abide by the regulations on production safety in the construction site, organize the construction in strict accordance with safety standards, and accept the supervision and inspection of Party A's management personnel and safety inspectors at any time. If Party B disobeys the instructions of Party A's personnel and violates the safety operation regulations, all consequences arising therefrom shall be borne by Party B itself;

8, in strict accordance with the provisions of the state for construction. Party B's operators must wear safety helmets, and the safety belts must be hung on the outer frame, working near the edge at high altitude and working at high altitude. Seat belts must be hung high and used low. It is forbidden to hang high and use low. The construction of border operations must have a safety fence and be completed by more than two people. Party B shall be responsible for the construction safety and safety accidents caused by Party B in the process of construction if the protective fence is not properly prohibited;

9. Party B must assign a special person to track and inspect the whole construction process of the external scaffolding contracted by Party B. If it is found that the steel pipes and fasteners are not firm or the safety net decays and falls off, it must be rectified immediately;

10. In the final dismantling process, the scaffolding contracted by Party B is strictly forbidden to be dismantled and thrown away. One layer must be removed every layer, and the second layer must be removed;

1 1. Party B's workers are not allowed to wear slippers and hard-soled shoes at work. If you wear slippers and hard-soled shoes, the company will impose a fine according to the regulations of 50 yuan for each person;

12, the use of construction machinery must be carried out in strict accordance with the specifications for the use of construction machinery and operation accumulation, so that special personnel can start the machine and hold relevant certificates. If there is a temporary replacement of the starting personnel, a safe handover must be made;

13. Party B shall pay attention to the maintenance of bulky construction tools and machinery provided by Party A during use, compensate for improper operation and man-made damage, and be responsible for safety accidents;

14. The construction personnel of Party B are not allowed to take materials from the construction site at will, and if found, they will be fined five times the materials used;

15, in the process of construction, should obey the command of Party A's construction management personnel, are not allowed to violate the rules or forced construction; Party B shall take adequate safety measures for aerial work and construction in dangerous areas; otherwise, Party B shall be responsible for safety accidents;

16, it is forbidden to go to work after drinking, fight, make trouble with good wine and steal. If the circumstances are serious, it will be handed over to the public security organ for handling;

17. 18 child workers and 55-year-old people are not allowed. People with heart disease, hypertension, disabled people, etc. Cannot enter the construction site;

18. Any agreement or contract signed between Party B and a third party in this project shall be the responsibility of Party B, which has nothing to do with Party A, and Party A will not approve it;

19. In case of withdrawal due to Party B's reasons (including voluntary withdrawal, withdrawal by name of construction supervisor, and withdrawal by the project department), Party A will only pay Party B 70% of the qualified engineering quantity;

20. Party B shall be responsible for all safety accidents (including third parties) caused by its own reasons or illegal behaviors in the construction process;

2 1. Party A strictly forbids Party B to dismantle, modify or move the power distribution facilities without authorization, and to lose the power distribution facilities and violate the safe use of electricity, and all consequences arising therefrom shall be borne by Party B;

22. Party A forbids Party B to dismantle, modify or move the safety protection facilities without authorization, or damage the safety protection facilities or violate the safety operation, and all consequences arising therefrom shall be borne by Party B;

23. The person in charge of Party B must stick to the site, arrange the work, direct and manage, and lead its employees to carry out the construction according to Party A's requirements and relevant construction safety specifications, and ensure the quality and quantity according to the progress requirements. All losses and adverse social impacts caused by poor management and dereliction of duty shall be borne by the person in charge of Party B. If Party B fails to make rectification for three times, Party A has the right to terminate the agreement and the remaining project funds will not be settled.

X. engineering changes:

If the construction project is added due to the change of drawings or the construction content is greatly changed, and the cost is greatly increased, and the original contract terms cannot be described, a supplementary agreement shall be signed through consultation.

XI。 Warranty liability:

During the warranty period, if Party A notifies Party B not to make rectification within a time limit, Party A will send another person to guarantee the warranty, and the expenses will be deducted from the warranty fund.

This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signing.

Party A: Party B (construction responsible party):

Signing place:

Date of signing:

Scaffolder's labor contract 3

Party A:

Party B:

In order to complete the project construction faster and better and ensure the quality, safety and progress of the project, Party A and Party B negotiate on the following specific matters based on the principle of equal consultation:

I. Scope of the Contract

Party A will contract out to Party B the main works, design drawings, joint review of drawings, minor modifications (scope) of building C05 in Phoenix, Sheng Bang, and the subcontracting quantities of supporting hydropower, weak current, fire protection and elevator construction. Details are as follows:

1. Contract method: The contractor does not include materials, and all tools of Party B (including safety helmet, safety belt, raincoat, rain boots, gloves, masks, work cards, hoists, etc. ).

2, the type of work content

(1), according to the construction drawings, all external wall double-row steel pipe scaffolding and cantilever double-row steel pipe scaffolding in the basement of the landing point of the outer frame (including the wall building of elevator shaft, safe passage and protective shed, etc.). ), lighting well single bent and "four-mouth and five-limb" steel pipe safety enclosure construction, I-beam fixing, tower crane lifting joint, operation platform erection and dismantling, etc.

(2) The entrance of the elevator shaft, the outlet of the construction elevator and the material hoist, the protective door (including installation) at the aisle platform, and the reinforcement below the machine seat of the construction elevator and the material hoist;

(3) According to the specification requirements, safety net, pocket net, internal and external horizontal protection, floor reserved hole cover, construction safety passage (stairs), temporary protection, safety protection chute, protective shed, steel processing shed and loading and unloading platform are set on the outer frame.

(4) On-site handling (horizontal handling and vertical handling), on-site sorting, scattered material cleaning, etc. Turnover materials;

(5) Changes in external decoration, installation and removal of elevated floor and tower frame.

(6) Installation of rigid connection point between cantilever steel and external frame, welding and dismantling of I-beam, reservation and dismantling of embedded parts;

(7) Party B is responsible for protecting the external frame and support;

(8), pipes, fasteners, bamboo boards and other materials are responsible for steel wires and hooks;

Second, the contract method and unit price:

1, according to the contracting principle, the C05 building and annex building are calculated according to the standard area on the company blueprint, and the comprehensive price is RMB/m; The price of secondary erection of an outer frame and border protection is RMB /m? (The area is calculated according to the standard area on the company blueprint × how many floors).

3. Horizontal transportation and vertical transportation of turnover materials on site (there are tower cranes on site), (no matter how high or far the vertical transportation is). Site cleaning after each construction operation, sorting and recycling of redundant materials (except carpentry), installation, safety and quality acceptance (i.e. team self-inspection and inspection by professional inspectors), and civilized construction on site. No matter how far the pump truck is transported, how the site construction conditions change and how difficult the construction is.

1. Party B voluntarily pays the performance bond to Party A. If Party A notifies Party B to enter the site, it will not pay the entry bond for 7 days as compensation for breach of contract.

2. If Party A doesn't make an outer frame for Party B, this deposit will be refunded and double indemnity;

3. Refund of the performance bond: from the completion of the main body to the capping.

Third, the liability for breach of contract

1. If Party B subcontracts the project without Party A's consent, or stops work or exits midway, it will be regarded as Party B's breach of contract, and Party A will pay the meal fee already paid to Party B, and the rest will be regarded as compensation for breach of contract and will not be settled.

2. If Party B's construction personnel are insufficient, so that the project cannot be carried out as planned, Party A has the right to expel Party B unconditionally, or Party A invites other personnel to carry out the construction, and the expenses shall be borne by Party B. ..

3. If Party B breaches the contract, the deposit will not be refunded as the progress compensation of this website.

Fourth, others.

Matters not covered in this contract shall be negotiated by both parties. This contract is made in duplicate, one for each party. This contract shall come into effect after being signed by both parties, and shall become invalid after the project completion payment is paid.

Party A: Party B:

Tel: Tel:

date month year

Three related clauses in scaffolder's labor contract:

★ Sample of scaffolder's Labor Subcontract (2)

★ 3 The latest construction labor contract template.

★ 3 copies of model engineering labor service contract.

★ Three latest scaffolding construction contracts

★ Small high-rise scaffolder contract template (3)

★ 3 General Contract for Construction Engineering Services

★ 5 labor service construction contracts.

★ Shelf team contract

★ Shelf team contract format

★ 5 copies of labor service project contract model.