Job Recruitment Website - Recruitment portal - Operation hours of Hefei Metro Line 4
Operation hours of Hefei Metro Line 4
According to the relevant provisions of the Code for the Operation and Management of Urban Rail Transit, various factors, such as operation safety, night maintenance requirements, running-in degree at the initial stage of line opening, passenger travel requirements, etc., are comprehensively considered.
The initial operation time of Hefei Metro Line 3 is tentatively set at 06:00-22: 15, that is, the first and last buses leave at 6:00 and 22: 15 respectively, and arrive at Xiangcheng Road Station at 6:48 and 23:25.
Free shuttle passengers.
As an important part of the skeleton network in the network planning, Line 3 is transferred to 1 Line (in operation), Line 2 (in operation), Line 4 (under construction) and Line 5 (under construction), and the transfer station is Hefei Railway Station (1 transfer).
Xiqilitang Station (Line 2 transfer), Library Station, Miaofang Station (Line 4 transfer) and Haitang Station (Line 5 transfer). After the opening of Line 3, passengers can transfer to 1 Line and Line 3 at Hefei Railway Station and to Line 2 and Line 3 at Xiqilitang Station.
- Related articles
- How to drive from Tenglong Road to No. 6 Hexiang Road
- How is working at Wuxi Pingtouge Media Co., Ltd.
- How is Garze Yongkang Hotel in Garze Tibetan Autonomous Prefecture? Is there any fun place?
- What kind of company is IBM? Can you be more specific?
- Common sentences in English cover letters
- What is the qualification system and what are its applications?
- What is the concept stock of battery energy storage?
- I am an undergraduate in the Department of Chemistry and Pharmaceutical Engineering of Suihua University ~ I am a junior now ~ ~ I don't want to take the postgraduate entrance examination and take the
- What are the requirements for veterans to take the public security special police exam?
- When will Panjin Rong Sheng Jinshenghuadu deliver the house?