Job Recruitment Website - Recruitment portal - Masons may find it there.

Masons may find it there.

Masons are generally casual workers, and only when they have jobs can they get together. There is no fixed office space, and people who want to find masons are generally introduced by acquaintances. Or go to the community and the construction site.

The bricklayer's salary varies from person to person, because of different technical levels, so it is not exactly the same. Generally, it takes 300-300 days for a bricklayer with good skills to spend 400 yuan.

In the current decoration of water, electricity, tiles, wood and paint, skilled bricklayers are the hardest to find. If paid by area, the average bricklayer's price is around 25 yuan/m2, and chamfering is counted separately. If calculated by the day, the bricklayer's daily salary is around 300 ~ 400 yuan.

Extended data:

The work of a mason:

1. structural transformation: structural transformation includes the demolition and transformation of the wall, balcony, doors and windows of the living room. (Fish Bubble Net-the largest bricklayer's recruitment platform in China) The load-bearing wall or counterweight wall of the living room can't be removed or changed, otherwise the living room structure will be unstable and safety accidents will easily occur. The door frame embedded in concrete cannot be removed, which will destroy the whole structure of the building.

The beam of the living room cannot be removed, which will make the building above lose its support and collapse.

2. Concealed works: water, electricity and waterproofing. All belong to indoor concealed works. During the construction of hydropower projects, the direction of hydropower pipelines should be correct, and the steel bars in the wall should not be cut when burying water pipelines. If the waterproof project is not done well, it is easy to cause water leakage and humidity in the room.

Before the construction of waterproof project, the base should be treated and the soil should be cleaned up. Then, waterproof materials are laid, and after the waterproof project is completed, water testing experiments should be carried out.

3. Ground leveling: the ground leveling and leveling are carried out through the original plane, so that the flatness of the renovated ground can reach a certain standard. There are generally three ways to level the ground: mechanical grinding gypsum leveling, cement mortar leveling and self-leveling leveling

Mechanical grinding and gypsum leveling are suitable for floor leveling of indoor space at any time. Cement mortar leveling and self-leveling must be carried out after the completion of the wall and floor tile paving in the kitchen, bathroom and wall.

4. Tile paving: Tile paving is an indispensable part of beautifying the living room and the last step of bricklayer's construction project. It should be noted that the tiles should be soaked in water for half an hour before the formal paving. When paving, the position of the first tile should be determined first, and cement sand should be evenly applied on the back of the tile to avoid tile falling off and hollowing.

References:

Baidu encyclopedia-bricklayer