Job Recruitment Website - Recruitment portal - Where is the Tao Jia exit of the second vertical line in Chongqing?

Where is the Tao Jia exit of the second vertical line in Chongqing?

Sorry, I don't know the exact location of the Tao Jia exit of the second vertical line in Chongqing. But I can provide some information about Chongqing No.2 Vertical Company.

Chongqing No.2 Longitudinal Road is an urban expressway in Chongqing, starting from Cai Jia, passing through wellhead, Shuangbei, Yanggong Bridge, Tianxing Bridge, Erlang, Banshan, Tiaodeng, Tao Jia and Xipeng, and connecting with the outer ring expressway. Among them, the section from Taojiajiao to Li Jiawan Interchange is the second longitudinal section of expressway. Taojialijiao Project starts from Taojialijiao of Science Avenue in High-tech Zone and ends at Li Jiawan Interchange, the second longitudinal line of dadukou district Expressway. It is an urban expressway with a total length of 13.49km and a design speed of 80 km/h, including extra-long tunnel 1 seat, interchange 1 seat and three simple interchanges.