Job Recruitment Website - Recruitment portal - Reinforcement work contract

Reinforcement work contract

Reinforcement work contract template

With the popularization of legal knowledge, contracts may be used in various scenarios anytime, anywhere. The purpose of signing a contract is to protect the interests of both parties and avoid inconveniences. necessary disputes. So how to draw up a contract? This must be very distressing for everyone. Below is a sample steelwork contract contract that I have collected for everyone for your reference. I hope it can help friends in need.

Rebar Work Contract 1

Party A:

Party B:

After friendly negotiation between the two parties, Party A will ____ The steel bar project is entrusted to Party B for labor construction. In order to clarify the responsibilities, rights and economic responsibilities of both parties, according to the "Economic Contract Law of the People's Republic of China", the company's relevant regulations on the contracting of internal construction teams, combined with the actual situation of the company , the following terms of the agreement have been signed for both parties to abide by.

1. Project overview

Project name:

Project location:

Project status: All steel bars for the above projects are made, tied and welded Project

2. Contracting Scope Method

1. Contracting Content: All labor including steel bar batching, sample turning, installation, butt welding, binding, completion material cleaning, waste stacking, etc. Fees include the cost of all auxiliary materials such as steel machinery, electric welding machines, vertical butt welding equipment, wire binding, welding rods, welding tools and other equipment required for the steel bar project; tool fees; artificial height work fees for super-high and high-rise construction, etc.; All shall be borne by Party B.

2. Contracting method: including labor, quality, construction period, safe production, civilized construction, production of steel bar specimens, auxiliary materials (all materials and tools except steel bars), Mechanical equipment.

3. Horizontal transportation of steel bars (from the forming site to the lashing point), vertical transportation of steel bars (tower crane on site), on-site feeding, lashing, on-site cleanup after completion of each construction section, excess All work content within the steel bar project (but not limited to the above scope of work) such as the sorting and recycling of steel bars, quality acceptance of steel bars, civilized on-site construction (including cooperating with Party A and other superior inspection units for various acceptances).

4. Except for additional expenses incurred for rework caused by Party A’s reasons, other expenses will be calculated based on actual costs.

3. Construction period and workers’ entry time:

Workers of this project will enter the construction site from ____, month, ____, to ensure the overall progress of Party A plan. In terms of project connection, Party A must obey the unified debugging. Party B has no special reason to cause a disconnect in the connection of work types. Party B must compensate Party A for all resulting economic losses; if the work is stopped due to the need for materials or other reasons caused by Party A, Party B shall be compensated for all resulting economic losses.

4. Contracting unit price:

1. Quality, safety, progress, civilized construction, etc. The work content and scope explained above are all within the scope of the steel bar contract.

2. Calculation method:

According to the above contracting scope and method, all steel contracting labor costs in the construction blueprint of this project are calculated based on the square meters of the construction area of ??the drawing. 45 yuan per square meter.

3. Quality, safety, progress, and civilized construction are requirements that Party B must meet within the scope of the contract, that is, they must meet the approval of Party A, the supervisor, and the owner (pass acceptance).

4. The amount of steel bars to be settled shall be calculated based on the drawing quantity minus the loss of the binding steel bars left by Party B during the binding process. (That is, the actual amount of lashing used by Party B for this project)

4. Party A’s spot work is not within the contract scope of the construction drawings (except for the calculated spot work that causes Party B’s rework due to design changes, no other rework will be caused) The increased costs for design changes, designation orders, modification orders, etc. are all included in the unit price of this contract), calculated based on 10 hours of daily working time. Party B must settle the settlement with Party A every month for this sporadic work and add it to the monthly tasks In the order, Party A and the company will not accept or deduct sporadic work done every other month.

5. Responsibilities, obligations and rights of both parties:

(1) Party A

1. Provide necessary safety facilities, production facilities and living facilities.

2. Responsible for the coordination and cooperation between civil engineering, installation and other types of work.

3. Prepare the construction progress plan and provide drawing axis, elevation and other data. Responsible for briefing on construction technology and safety production.

4. Carry out material supply according to the project progress.

5. The on-site safety officer of the project department is responsible for conducting safety production inspection and guidance for each team, and the on-site construction personnel are responsible for providing technical guidance and supervision, coordinating the relationship with other types of work, and assisting Party B to do all aspects of work. item of work.

6. The right to impose penalties of not less than 100 yuan on Party B's construction workers who violate production safety and construction regulations each time, which will be directly deducted from Party B's monthly task list. For those who refuse to change despite repeated admonitions, Party A has the right to Party B has the right to expel and terminate the contract, causing economic losses to Party A, Party B shall compensate Party A for all economic losses.

7. Party A’s on-site representative is responsible for overall management.

(2) Party B

1. Organize employees who are between 20 and 45 years old, strong in body, have legal concepts and professional skills, and have good quality. The venue is strictly prohibited for adults over 46 years old, frail and sick adults, and people who are unable to control their consciousness.

2. Persons entering the site must hold various required documents such as resident ID cards, health certificates, etc. and submit a roster of 1-inch recent photos of employees entering the site. Once registered, they cannot be changed at will. If necessary Transfer and report to the project department for record.

3. Strictly abide by the operating procedures for safe production, obey the safety education and guidance of the project safety officer and relevant functional leaders, adhere to pre-shift education, safety first, enhance employees’ self-protection awareness, and ensure safe production . For safety accidents in production, whoever caused the accident shall be held responsible.

4. Arrive at the warehouse according to the construction budget. If materials are wasted during construction and exceed the construction budget quota, the excess will be deducted from the labor cost.

5. Construction must be carried out in a civilized manner, and it is strictly forbidden to place materials randomly. The materials in the construction area must be controlled and quantified, and the materials must be used up after the work is completed.

6. Any project quality problems caused by steel bar binding will be handled by Party B.

7. Party B is responsible for the transportation of materials in parts that cannot be transported by vertical transportation machinery.

8. Various pads during construction will be installed by Party B, and the marble pads and wall plastic pads will be provided by Party A.

9. Party B sends a representative—responsible for contacting the construction and Party A.

6. Quality requirements:

1. The quality index of this project is to meet the Oujiang Cup and meet the various technical and normative requirements of Party A, the supervisor and the owner.

2. The quality assessment is conducted in stages, and the project department conducts random inspections at the same time.

7. Material conservation and tool use:

1. All tools and labor protection supplies such as tape measures, steel bar scissors, etc. shall be taken care of by Party B.

2. During construction, Party B must clean up the site after the work is completed, and the principle is that whoever does the work will clean up. At the same time, we must obey the supervision and guidance of Party A. If any waste is discovered, we will impose a fine of not less than 500 yuan each time depending on the circumstances. If the site is unclear or the completion materials are unclear, Party A has the right to order its team to clean up the work. The expenses will be borne by the responsible team.

Party A:

Party B:

Signing date: Rebar Work Contract 2

Party A:

Party B:

Party A and Party B have signed this contract through consultation and consensus based on the principles of voluntariness and equality, so that both parties can abide by it.

1. Contract Period

The contract period shall be subject to the project contract signed by the general contractor and the construction party.

2. Contract Scope

1. Contracting Method: Party A will build the 15# and 16# buildings of Zhonghao International Star City Phase II to include labor (excluding straight thread materials, including labor) ), auxiliary materials, machinery, electroslag pressure welding (materials and labor), quality, construction period, safe production and civilized construction are contracted to Party B. All auxiliary materials (tie wire, pads) and machinery (except vertical transportation machinery, flash butt welding machines, electric welding machines, steel bending machines, steel breaking machines, straightening machines, electroslag pressure welding equipment, etc.) required for construction are included. Party B shall prepare it by itself, and the main materials shall be provided by Party A. Material quotas shall be implemented, and the usage of all materials shall be controlled according to the quota quota issued by the foreman.

2. Acceptance of project quantities: Based on the construction drawings and completed qualified physical project quantities, the project shall be accepted according to the quality standards stipulated in this contract. The project acceptance shall be based on the acceptance opinions of the project supervisor, project quality inspector, and project manager. allow.

3. Work content: Preparation before construction, steel bar sampling, plan preparation, including horizontal and vertical transportation in the material yard, raw material unloading, butt welding work, blanking, unbundling and cold rolling, Ingredients are marked, laid out, bent and bundled, labeled semi-finished products are classified and stacked, and the steel bar site is cleaned and kept tidy. The steel bars are tied to cooperate with the carpentry construction workers to lay out the wires, build their own shelves, clean up the debris and broken wires in the formwork, and pick up the semi-finished steel bars on site. The design requires binding to be placed in the mold, protective layer pads (including materials) to be placed, care to be taken when pouring concrete, excess steel bars after each binding to be cleaned, and collected and stacked neatly at the proposed location. Including matching cutting materials for sampling, production and installation of steel bar pads, and steel bar production and binding of some prefabricated secondary components (remaining materials from the concrete pump).

3. Contract price and adjustment method

Others: steel bar production and binding: based on building area yuan/m2

4. Project Payment and Settlement

1. All construction workers will sign in and take attendance twice every day before get off work in the morning and before work in the afternoon. The attendance sheet shall be kept by Party A and submitted to the general contractor for a copy.

2. Each worker must sign a labor employment agreement with Party A, which shall be supervised and implemented by the general contractor.

3. For each project payment, the subcontractor will prepare a worker salary sheet based on the attendance sheet and labor agreement. The salary sheet shall be signed by the general contractor, Party A’s project manager, and the subcontractor’s team leader. Workers must sign and have their fingerprints printed before they can receive wages based on their ID cards.

The above three items serve as the basis for payment of project fees and are indispensable. Only when the payment of workers' wages is completed and there is no dispute, the project payment to the subcontractor can be settled (deducting the workers' wages already paid and all levies or fines payable by the competent department paid by Party A on behalf of Party B, the remaining portion shall be paid to contractor).

4. 15% of the total price of this contract shall be paid within 30 days after the foundation project of the contract project is accepted and accepted. No points above ±0.000 shall be paid before the foundation project and its basement have completed the roof concrete pouring. Progress payments. 11+1 During the period from the main project of small high-rise buildings to the acceptance, the project will be paid in stages according to the unit project. 7% of the agreed price for the unit’s labor fees shall be paid within 30 days after the concrete pouring of the four-story floor structure is completed. 7% of the agreed price for the unit’s labor costs shall be paid within 30 days after the concrete pouring of the seven-story floor structure is completed. 7% of the agreed price for the unit’s labor costs shall be paid within 30 days after the concrete pouring of the ten-story floor structure is completed. 14% of the project price of the unit shall be paid within 30 days after the main project is accepted and accepted. 10% of the project price of the unit shall be paid within 30 days after the external scaffolding is removed. The five parties participating in the construction shall pay 10% of the project price within 30 days after passing the completion acceptance inspection. The remaining balance will be paid after the completion acceptance is passed.

Party A and Party B reach an agreement that upon completion of normal construction of the project, settlement will be made in accordance with the settlement method agreed upon in the contract signed by both parties. If a dispute occurs midway, the workers leave the site before the construction is completed, or the contract is signed by Party A or the general contractor. If the subcontracting team is dismissed, Party A will pay the skilled workers a daily salary of yen per day and the general workers (unskilled workers) a daily salary of yen per day in accordance with the above conditions. Once the salary payment is completed, the labor agreement will be terminated. This team has no relationship with Party A, the project department and the general contractor.

5. Working conditions and labor protection

Party A shall provide Party B with dormitories and canteens according to the actual situation of Party B’s position and in accordance with the labor contract (meal expenses shall be borne by Party B).

6. Responsibilities and Obligations of Party B

1. Party B shall abide by national laws, regulations, construction specifications, safety and other rules and regulations.

2. If Party B violates labor discipline and relevant rules and regulations, Party A may criticize, educate, punish, or terminate the labor contract.

3. Party B must provide Party A with a list of personnel entering the site, personal photos, copies of ID cards, employee qualification certificates, and technical personnel certificates, and shall ensure that the ideological, technical, and physical quality of the personnel entering the site is good. The quality can meet the needs of the projects undertaken. Entrants must be young adults between the ages of 18 and 45.

4. Party B must pay a performance fee of 10,000 yuan when entering the site, which will be refunded by Party A when the main structure is completed.

5. Steel bending machines, steel breaking machines, straightening machines, electric welding machines, flash butt welding machines and other machinery used by Party B’s construction workers, auxiliary materials such as welding rods, wire ties, pads, tape measures, hand Tools such as pull hoists, wires for connecting from the secondary distribution box, and iodine tungsten lamps shall be provided by Party B to meet the construction needs. Party A will no longer provide any machinery.

6. Party B must organize a team of capable technical workers and professional construction management personnel according to the needs of the project progress to complete the construction tasks assigned by Party A in advance with high quality and quantity. If the quality cannot meet Party A’s According to the construction progress requirements, Party A has the right to change the team.

7. Party B must organize the construction in accordance with the current relevant construction technical specifications and procedures and Party A’s requirements. Comply with all rules and regulations of Party A and the relevant laws and regulations of the country, obey the supervision, coordination and deployment of on-site management personnel, and shall not leave the site at will. The use of child labor is prohibited. If the above regulations are violated or an accident is caused, Party B shall be responsible for all economic losses and responsibility.

8. Party B must abide by relevant national, local and project regulations on production safety and civilized construction, put safety production first, and do not violate rules or regulations. Construction workers entering the site should take strict safety protection measures to ensure their own construction safety. The responsibility for accidents caused by their own inadequate safety measures or their own reasons shall be borne by Party B and all costs incurred shall be borne by Party B. At the same time, Party A should be assisted to establish a civilized construction model site.

9. Party B’s personnel should bring their own living expenses (at least one week’s living expenses). Party B’s personnel are not allowed to bring their family members to stay at the construction site.

10. All personnel must receive safety production and professional job training, and the employment rate of special workers with certificates should reach 100%. A special work permit must be submitted before entering the site.

7. Construction period, quality, finished product protection, civilized construction, and material use

1. Construction period: Party B guarantees to organize the construction according to the construction period plan arranged and prepared by Party A on site, and every extension For one day, in addition to Party B's liability for various losses of Party A, Party A will be fined 5,000 yuan/day (except for force majeure factors) depending on the specific circumstances, and the amount will be accumulated.

2. Quality: The quality goal of this project is to ensure the "Xiang Yu Cup" standard and strive to achieve the "Yangtze Cup" standard. Party B's internal construction should strictly control quality. It is required that the sub-item acceptance is 100% qualified. If the quality does not meet the design requirements, the rework costs will be borne by you and the settlement unit price will be calculated based on a 10% discount from the contract unit price.

3. Protection of finished products: Party B shall assist Party A in carrying out protection measures for finished products. If Party B personnel are found to have artificially damaged finished products, Party A will impose a fine of 5 times depending on the extent of the damage. Unintentional damage will result in corresponding compensation and penalties based on the extent of the damage.

4. Civilized construction: Party B shall assist Party A to carry out civilized construction on site. During the construction process, if the site is not cleared after completion, or materials are wasted due to Party B's reasons, Party A will take action based on the specific circumstances. The corresponding fine will be compensated to Party A at 1.5 times the total value of the wasted materials. Party A will impose a fine of 200 to 2,000 yuan depending on the specific circumstances, and the contract unit price of the completed work volume in that month will be reduced by 10%.

5. Environmental protection: Party A shall be responsible for regularly or irregularly providing education and training on occupational safety and health and environmental protection knowledge to Party B’s personnel. Responsible for the management, supervision and inspection of Party B’s occupational safety, health and environmental protection work in accordance with the relevant regulations on production safety in engineering construction and the requirements of the company’s environmental and occupational safety and health management documents. Party A shall not require Party B to work in violation of safety management and environmental protection regulations, and shall be responsible for supervising and inspecting Party B's distribution of labor protection supplies to its on-site staff in accordance with regulations. Party B shall issue labor protection supplies to its on-site staff in accordance with the standards specified by Party A. If Party B fails to issue labor protection supplies in accordance with regulations, Party A will force them to issue them for use, and the cost of labor protection supplies will be directly deducted from Party B's project payment. Party B shall abide by the relevant regulations on production safety in engineering construction and Party A's environmental and occupational safety and health requirements, and accept supervision and inspection by Party A's relevant personnel at any time. Take necessary safety, health and environmental protection measures. Eliminate accident risks and pollution hazards to the environment. Party B will be responsible for any safety and environmental accidents and resulting expenses caused by Party B's ineffective measures, and the construction period will not be extended. Party B shall provide safety and environmental protection education to workers at the workplace and be responsible for their safety and health.

6. Material collection: On the premise of ensuring quality, materials are subject to double control by Party A and Party B. Materials used by Party B are subject to quotas. According to Party B's steel bar sample-turning personnel, the samples will be turned over and Party A's engineering will be responsible. The steel bar material list reviewed by the person is used as a rational use of materials, and waste or overuse of materials is never allowed. The actual use of steel bars should save 3% on the basis of the material list. The steel scrap shall not exceed 0.5% of the total amount. If the materials beyond the scope of collection are borne by Party B, Party A will deduct them according to the unit price in the steel supply contract during settlement. The daily maintenance of the processing equipment shall be borne by Party B.

7. Production safety and occupational safety and health: To prevent major casualties and minimize general work-related injuries, Party A must make safety disclosures on the projects undertaken by Party B, put forward clear safety requirements and conduct safety supervision and inspections. Party B must implement the relevant production safety and occupational safety and health systems and operating procedures, and perform civilized construction during the construction process. Party B must abide by the rules and disciplines, construct safely, and shall not operate in violation of regulations, give orders in violation of regulations, or violate labor disciplines. Once a safety accident occurs and Party B is primarily and directly responsible, Party B shall be responsible for all compensation for the casualties and accident handling expenses, as well as the resulting fines; if Party B bears secondary responsibility, Party B shall be responsible for compensation for the casualties and their The aftermath will be handled by Party A and Party B will be compensated according to the size of the responsibility.

8. Others

1. Party B will pay all travel expenses for construction personnel going in and out of the local area by themselves, and Party A will not bear it.

2. Party B shall bear full responsibility for direct and indirect economic losses caused to Party A, except for the fact that the completed work quantity will not be settled due to reasons of Party B's withdrawal and default, and Party A reserves the right to claim compensation. If Party A violates the provisions of the contract and causes losses to Party B, Party A shall be responsible for the losses.

3. During the construction period, Party B should educate employees to abide by the law and comply with local and on-site comprehensive management requirements. If there is any illegal fight or fight caused by Party B (regardless of any reason), Party A will not take any action. Mediate and hold Party B accountable in the form of financial penalties. The first fight will result in a fine of 5,000 yuan. The second fight will result in an unconditional exit. The remaining work volume will not be settled and will be regarded as a fine. The resulting impact will have an impact on the reputation of the unit. , all responsibilities shall be borne by Party B.

4. If Party B fails to complete the work in the contract, Party A will impose penalties. If the work is within the contract, Party A’s project foreman will issue a timed work order, which will be invalid and will not be recognized.

5. Party B is responsible for the cross-finishing project and completed maintenance. If Party B has not received a reply three days after Party A notified Party B, Party A has the right to handle it on its own, and all costs will be borne by Party B.

6. Party B’s construction workers entering the site must wear safety helmets, otherwise they will be fined 50 yuan each time.

7. Party B’s construction workers must wear badges when entering the site, otherwise they will be fined 20 yuan per person each time.

8. Party B’s construction personnel entering the site are not allowed to steal any items at the construction site. Once discovered, they will be punished at 200 times their value, which will be directly deducted from the project settlement.

9. Party A’s management personnel arrange for Party B’s construction workers to work overtime, and Party B must accept the arrangement unconditionally. Anyone who disobeys the arrangements of Party A's management personnel will be fined 5,000 yuan for the first time and 10,000 yuan for the second time. Party A has the right to order Party B to leave the venue unconditionally for the third time. The amount of work completed by the team dismissed from the project will not be settled.

9. Termination of the Labor Contract

Upon agreement between Party A and Party B, Party A may terminate the contract if Party B has any of the following circumstances:

1 , During the probation period, Party B is found not to meet the employment conditions;

2. Serious violation of labor discipline or Party A’s rules and regulations;

3. Serious dereliction of duty, malpractice, or Party A's interests have been seriously damaged;

4. Seriously violated safety operating procedures, refused to change despite repeated warnings, and caused major safety accidents, and must bear all losses;

5. Serious violations of construction If drawings, change negotiations, national, local and industry norms and standards cause major quality problems or quality and safety hazards, in addition to rescinding the labor contract, you must also bear all losses of work and materials;

6. Construction and technical strength Insufficient, the project progress is seriously lagging behind.

10. Responsibility for breach of labor contract If either Party A or Party B violates the labor contract, it shall pay liquidated damages.

Party A:

Party B:

Signing date: Rebar Work Contract 3

Party A:

Party B:

In accordance with the relevant provisions of the "Economic Contract Law of the People's Republic of China", the "Labor Law of the People's Republic of China" and the "Construction and Installation Project Contract Regulations", and in combination with The company's systems and specifications, as well as the specific design and requirements of this project, are signed on the basis of equality, voluntariness and consensus through consultation, and the labor construction contract shall be abided by by both parties.

Article 1: Project Overview

1-1 Project Name:

1-2 Project Location:

1-3 Structure Form:

Article 2: Scope of contracted labor services and other contents

 2-1 Method of labor contracting: labor but not materials

2-2 Scope of contracted labor services : This project covers the whole process of labor tasks, including the production, installation, and binding of all steel bars from the floor to the roof, including the ancillary structures above the roof, which can reach the next process of formwork and concrete pouring. This includes the production, installation, and binding of steel bar projects such as change projects and secondary post-cast beams, walls, slabs, columns, prefabricated components, trench covers, tower crane foundations, etc., until acceptance is passed.

2-3 Other contents of the labor contract (the following contract contents are included in the total contract price)

2-3-1 Calculate the steel bar cutting order

< p> 2-3-2 Unloading materials in steel bar engineering. (Including the unlucky of materials on site)

 2-3-3 Production of protective layer, horse bench bars, and support pads.

2-3-4 Mechanical installation of steel bar production, site leveling, mechanical placement and dedicated operation.

2-3-5 Responsible for arc welding, flash butt welding, and mechanical connection of pipes. Manual casing (labor costs for electroslag welding will be calculated separately and can be included in the general contract price)

 2-3-6 Listing, stacking and covering of steel raw materials and finished materials.

2-3-7 Reserve various types of openings and related parts of steel bars to be pre-buried and tied twice.

2-3-8 Bring your own small machinery and labor protection supplies.

2-3-9 Scaffolding when tying steel bars is erected, dismantled, classified and stacked neatly.

2-3-10 On-site clean-up, civilized construction site and civilized construction cooperation work.

2-3-11 Responsible for the compensation costs for the receipt, return, damage, waste and loss of machinery, equipment and materials.

(If the machinery and auxiliary materials are contracted to Party B, the cost will be calculated separately and can be included in the general contract price)

2-3-12 The quality shall be implemented in accordance with relevant national standards and the construction shall be carried out in accordance with the design requirements. If it does not meet the standards Deductions, fines, rework fees and related responsibilities shall be borne by Party B.

 2-3-13 Bear all security expenses and related responsibilities of the team, including expenses incurred by theft, fighting, etc.

2-3-14 Responsible for providing safety technical briefings to workers in this team.

2-3-15 Responsible for the production and installation of embedded iron parts such as stair steps and railings.

 2-3-16 Bear the responsibility and expenses for safety, quality, progress, and civilized construction caused by failure to perform construction according to requirements.

2-3-17 Bear the accommodation expenses, water and electricity bills of the workers of this team, which can be included in the general contract price (except for Party A providing accommodation)

2- 3-18 Responsible for the construction of trenches, derricks, elevators, feed openings, steps, and staircases.

Article 3: Construction Period of this Project Contract

4-1 Party B must follow the supervision and guidance of the construction unit, construction unit, supervision unit, labor service company, relevant units and relevant personnel. Execution, construction must be carried out in strict accordance with the drawing design requirements and relevant construction specifications, relevant atlases, and technical data. The quality of the project must comply with the relevant project construction acceptance scope and relevant national industry assessment standards, and shall be inspected by the quality inspection department, construction unit, supervisor, and relevant units Acceptance and assessment quality level must meet the requirements of qualified projects. If a quality accident occurs, a fine of 50-1,000 yuan or more will be imposed depending on the circumstances. Rework costs and material costs will be borne by Party B. If a serious quality accident occurs, Party B will be ordered to withdraw from the construction site, the labor costs incurred will not be settled and all economic losses will be compensated.

4-2 Party B must protect the finished products during construction and formulate finished product protection measures in advance.

4-3 Construction regulations and quality acceptance standards shall be implemented in accordance with the relevant regulations of the company.

Article 4: Contract price and payment method

5-1 Contract price and calculation basis

5-1-1 This project regardless of the amount of steel bars How much, how difficult it is.

Party A:

Party B:

Signing date: ;