Job Recruitment Website - Social security inquiry - Badong county social insurance inquiry

Badong county social insurance inquiry

The road from Baihupo to Tiantai Mountain in Badong County is Tongcun Road, which is also for the better development of tourism.

Highway project from Baihupo, Xiqiuwan Township, Badong County to Tongcun, Tiantai Mountain

1. Bidding conditions

The highway project from Baihupo, Xiqiuwan Township, Badong County to Tongcun Village, Tiantai Mountain was approved by Badong County Development and Reform Bureau in document No.20 15 1 13. The owner of the project is Xiqiuwan Township People's Government of Badong County, and the source of construction funds is the central budget funds and self-raised funds. The tenderer is Badong Tiantai Mountain Tourism Development Co., Ltd.. The project was invited for public bidding, and the quorum was not reached during the announcement period. The second announcement is now issued, and interested and powerful potential bidders (hereinafter referred to as applicants) are specially invited to participate in the bidding.

2. Project overview and bidding scope

The highway project from Baihupo to Tongcun in Tiantai Mountain in Xiqiuwan Township, Badong County starts at the junction of S327 Provincial Highway and Songjiaya Village in Xiqiuwan Township, and ends at Tiantai Mountain Scenic Area in Baihupo Village. Designed by Hubei Yitong Highway Survey and Design Co., Ltd., the total length is 5.35km, of which 2.57km is newly built and 2.78km is rebuilt and expanded along the old road. According to the fourth-class highway construction standard, the subgrade width of the whole line is implemented according to the fourth-class highway standard (design speed is 20Km/h). The width of subgrade is 6.5m, the width of pavement is 6m, hard shoulders with a width of 0.25m are set on both sides, rubble ditches are built with mortar, and rubble retaining walls are designed for special sections. The total investment of the project is about 4.56 million yuan and the construction period is 6 months. The source of funds is the investment in the central budget 1 10,000 yuan, and the rest is self-raised. This time, only the subgrade project is invited for bidding, and the control investment of Jian 'an project is 2.76 million yuan.

TenderNo。 :BDJSGCZB20 15-053(2)。

3. Qualification requirements of bidders

3. 1 The bidder must have the qualification of an independent enterprise as a legal person, have the qualification of Grade III or above in general contracting of highway engineering construction, have the performance of highway engineering construction in recent three years, have the corresponding construction ability and good social reputation in terms of personnel, equipment and funds.

3.2 The person in charge of the proposed project must have the qualification of a second-class construction engineer in highway engineering, and must be the registrant of the applicant's unit (including temporary qualification); The chief engineer of the project must have intermediate or above technical titles in highway engineering; "Five members" should have qualification certificates or employment certificates; Must provide "three types of personnel" safety assessment certificate, namely, the legal representative of the enterprise (class A), project leader (class B) and full-time safety officer (class C). Provide the labor contract of the personnel to be dispatched and the social security certificate of the last three months (three months before the deadline for issuing the tender announcement, that is, April-June).

3.3 An affiliated enterprise with investment and equity participation, or a parent company with direct management and managed relationship, or a subsidiary of the same parent company, or two or more legal persons with the same legal representative may not bid at the same time.

3.4 This tender is subject to post-qualification review, and the consortium bid is not accepted.

3.5 According to the document number of Zhou En Inspection Commission 20 132 1, the bidder must fill in the bribery crime file query form.

3.6 Each bidder can only authorize one representative to participate in the bidding, and the authorized representative is the project leader to be sent to the project.

3.7 The successful bidder shall implement the system of "holding certificates" in key positions. When the winning bidder enters the site, the project owner shall check whether the winning bidder's personnel meet the requirements of the bidding documents, bidding documents and contract documents, and whether all documents are within the validity period.

4. Registration and acquisition of bidding documents

4. 1 Any bidder who is interested in bidding can register before 20 15 on July 5, 2065438 and 23:59 on July 25, 2065438.

4.2 500 yuan, the information fee for the bidding documents of this project, is submitted by the enterprise online banking, and the deadline for downloading the bidding documents is July 25th, 2005 at 2065438+23:59.

4.3 The bid bond for this project is RMB fifty thousand Yuan only (RMB 50,000.00), and the deadline for receiving the bid bond is the deadline for bidders to register.

The bidder must submit the bid bond in full within the specified time, and it will be invalid after the deadline.

4.4 Matters needing attention in online bidding and deposit payment:

4.4. 1 Registration website: Bidders log on to the website of Badong County Public Resource Trading Service Center (website:) and enter the online bidding system.

4.4.2 Online registration: For public registration, the bidder must first open the online banking for senior enterprises of China Construction Bank. (If the bidder basic account Bank is in China Construction Bank, directly open the online banking of senior enterprises of China Construction Bank; If the bidder's bank in basic account is a bank other than China Construction Bank, it must open a settlement account at the business outlet of China Construction Bank, and open the advanced enterprise online banking of China Construction Bank). It takes three working days to open a basic deposit account or settlement account in China Construction Bank, and the bidding enterprise needs to open an account as soon as possible according to the bidding time, so as not to affect the bidding.

4.4.3 Only when the online banking of senior enterprises of China Construction Bank is launched can enterprises register in Badong county public resources electronic trading system.

4.4.4 The bid bond must be submitted through the online banking of China Construction Bank Senior Enterprise, and the first payment channel must be the bidder's basic account. If the bidder basic account Bank is in China Construction Bank, it shall be submitted directly through the senior enterprise online banking (a copy of the transfer voucher from basic deposit account of China Construction Bank to the special account of the central bid bond is attached to the bidding document); If the bank where the bidder opens an account in basic account is not China Construction Bank, the bidder must transfer the bid bond from basic account to the settlement account opened at the business outlet of China Construction Bank. Then submit it to the special account for bid bond of Badong County Public Resources Trading Service Center through the online bank of this account (a copy of the original voucher from basic account to the settlement account of China Construction Bank and a copy of the transfer voucher from the settlement account of China Construction Bank to the special account for central deposit are attached to the tender documents).

4.4.5 The information fee of the tender documents shall be paid through the online banking of senior enterprises of China Construction Bank, and the tender documents can be downloaded only after the information fee is paid.

4.4.6 Only when the bid bond system is submitted as required can the registration be confirmed to be successful.

4.4.7 Before the deadline for bidding, you can download the bidding documents and other materials online for 24 hours on normal working days, public holidays and holidays, pay the fees and submit the deposit.

4.4.8 For details, please refer to the "Operation Guide" column on the website of Badong County Public Resource Trading Service Center.

5. Submission of bid documents

5. 1 The deadline for submission of bidding documents (the deadline for bidding, the same below) is 20 15 at 9: 00 on August, and the place is Room 307, the bid opening hall on the third floor of Badong County Public Resources Trading Service Center.

5.2 The tenderee will not accept the bid documents delivered late or not delivered to the designated place.

6. Contact information

Trading Center: Badong County Public Resource Trading Service Center trades one share.

Further reading: How to buy insurance, which is good, and teach you how to avoid these "pits" of insurance.