Responsibilities of project management department

Responsibilities of Project Management Department (Selected 10)

In the rapidly changing modern society, various job responsibilities appear frequently, and formulating job responsibilities can effectively prevent the phenomenon of job disputes caused by job overlap. So do you really know how to formulate job responsibilities? The following is my collection of job responsibilities of the project management department (selected 10), hoping to help everyone.

Responsibilities of Project Manager Department 1 1 Responsibilities of Project Manager

1) Seriously implement the relevant national and superior guidelines, policies, laws and regulations and various rules and regulations promulgated by the company system, and be responsible for the overall organization and leadership of the project according to the design requirements to ensure the normal operation of the project.

2) Responsible for allocating the manpower, financial resources and material resources of the project department, organizing the establishment and improvement of the project quality, safety and fire prevention guarantee system, and determining the responsibilities and authorities of the project department management personnel.

3) Organize the preparation of project construction organization design, including project schedule and technical scheme, formulate safety production and quality assurance measures, and organize their implementation.

4) Organize the internal and external contracting of outdoor related projects of various units within the project scope, and supervise, manage, check and accept the progress, quality, safety, cost and site capacity of the contracted projects.

5) Organize and participate in regular safety inspections twice a month, and assign special personnel to be responsible for rectification and review.

6) According to the company's annual (quarterly) construction production plan, organize the preparation of quarterly (monthly) construction plan, including the use plan of labor, materials, components and mechanical equipment. On this basis, we signed a supply and demand guarantee and lease contract with relevant departments, and strictly implemented it.

7) Strict financial system, strengthen financial budget management, implement various forms of contract responsibility system, and correctly handle the interests of the state, enterprises and individuals. Responsible for the business contact between the company, customers, supervisors and superior departments to ensure the smooth progress of the project.

2, project engineer responsibilities

1) is responsible for implementing national technical regulations, standards, superior technical decisions, systems and technical management systems of construction projects.

2) Carry out regular technical work, mainly including the following contents:

A. Organize relevant personnel to be familiar with technical documents such as drawings and tender documents, organize the blue prints.the design, negotiate with design units, construction units and supervision departments in time to solve the problems arising in drawings and construction, and go through the formalities for negotiation in writing in time.

B organize the preparation of the construction plan, implement it to relevant personnel after approval by the superior, and regularly check the implementation of the construction plan.

C regularly check the management of engineering and technical files.

D, supervise and inspect whether the construction records, material test records and construction test records conform to the specifications and relevant regulations, and take timely solutions to possible problems.

E organize the first design disclosure after receiving the project, and do a good job in the disclosure of complex parts with more professional intersections and higher design requirements.

F after the completion of the project, organize the project technicians to draw the as-built drawing and write the construction summary report.

3) Responsible for quality management.

A supervise the implementation and execution of concealment and pre-inspection, and require timely, true and serious completion of this work according to the parts.

B. organize the acceptance of foundation and structural parts.

C. cooperate with the project manager to pay attention to quality awareness education.

D. Deal with engineering quality defects, report quality accidents to the chief engineer in written form in time, and deal with engineering quality problems under the leadership of the chief engineer.

4) Promote new technologies. According to the design requirements and functional requirements, the new technologies, new processes and new materials involved in construction projects are carefully studied and scrutinized repeatedly. If necessary, put real samples or simulation tests, master the practices of new technologies, new processes and new materials, and solve construction technical problems.

5) Organize technical training and formulate technological process.

3, the responsibilities of the builder

1) Carefully prepare the production plan and construction scheme, and organize the implementation of construction technology, quality and safety technical measures.

2) Participate in the blue prints.the design, concealed engineering acceptance, technical review, design change visa, intermediate acceptance and completion settlement, etc. , and urge the filing of technical data.

3) Do a good job in the task disclosure and technical disclosure of the operation team, check the production cost and quality of finished products and semi-finished products such as concrete and mortar grading, and strive to reduce consumption.

4) Regularly hold the dynamic analysis meeting of team quality and safety, implement the three-level safety education and seasonal construction measures and the principle of "whoever constructs is responsible for safety".

5) Organize the safety technical acceptance of scaffolding, lifting frame and mechanical and electrical equipment, and implement maintenance measures.

Coordinate the connection of various projects and the management of various functional personnel to ensure the timely and quality delivery of construction projects.

6) Take part in the safety inspection once every two months, and do a good job of rectification.

4, quality controller responsibilities

1) Make technical disclosure on the specifications and quality requirements of all projects and jobs within the inspection scope.

2) Take cover engineering acceptance and technical review in time. At the same time, according to the requirements of quality evaluation, evaluate the quality grades of sub-projects and sub-projects to ensure the integrity, truthfulness and accuracy of the project.

3) Timely guide the rework and repair of unqualified sub-items, ensure that unqualified parts are not hidden or leaked, and re-evaluate the quality level.

4) Quality within the jurisdiction of the organization

Check each other, reward and punish according to the detailed rules, and have the right to impose a fine of 5-50 yuan on teams and workers who do not obey the supervision and inspection and have quality accidents.

5) Cooperate with the material engineer to verify the quality of various materials, finished products and semi-finished products before use, and prohibit the use of unqualified materials.

6) Feedback information to the Quality and Safety Department in time, and summarize and implement new technologies to improve quality.

5, safety personnel responsibilities

1) Implement various safety production regulations and set an example.

2) Participate in the formulation and review of safety technical measures in construction organization design.

3) Be responsible for the project-level workers' safety production education, and do a good job in safety disclosure during construction and publicity at ordinary times. Cooperate with relevant departments to do a good job in technical training and assessment of workers with special types of work.

4) Go deep into the construction site to inspect, supervise and guide the implementation of various safety rules and regulations, eliminate hidden dangers of accidents, analyze safety trends, and continuously improve safety management and safety technical measures. Regularly report the specific situation of safety production to the project manager.

5) Properly exercise the security veto power, make rewards and punishments clear, handle affairs fairly, and at the same time do a good job in cooperation with functional departments at all levels in the safety inspection of this project.

6) Be responsible for the inspection and acceptance of on-site safety facilities and guide the maintenance work.

7) Supervise relevant departments to distribute labor protection articles to employees in time according to regulations, and guide their rational use.

8) Participate in the investigation and handling of industrial accidents in enterprises, sum up experiences and lessons in time to prevent similar accidents from happening again.

9) Participate in the project safety inspection every half month and make records.

6, material responsibility

1) Abide by the law, resist corruption and change, and resist unhealthy trends.

2) Understand the market information in time, and work hard on the materials of "eyes, ears, mouth and legs" for four times, and work hard on the materials of "quality, price, distance and price".

3) According to the project schedule and material plan, enter the material quantity in time.

4) Be responsible for the inspection and acceptance (including sampling and second interview) of materials entering the site to prevent fake and inferior building materials from entering the site for engineering.

5) Submit quality certificates of relevant materials in time.

6) According to the safety materials required for safety measures, prepare the safety material supply plan and provide it in time; Be responsible for the safety performance of materials entering the site, and meet the ministerial standards.

7. Librarian's responsibilities

1) According to the specifications and the requirements of local construction authorities, make disclosure to relevant personnel and carry out tasks.

2) Collect the technical data of this project in time, and classify and file them.

3) Assist the team in pressure testing of concrete and mortar test blocks on schedule, and urge the raw material test report.

4) Supervise and cooperate with the quality controller and team leader in time, and make records of quality evaluation of disciplines and divisions.

5) Carefully record the hidden inspection, and the visa shall be timely and synchronized with the progress of the project.

6) The technical data used must be timely, correct, true and complete, and play a guiding role in construction and future maintenance.

7) Be responsible for the inspection and guidance of technical data and safety data of the project department, and require relevant personnel to provide timely and effective records.

8, production team leader responsibilities

1) According to the construction plan, organize the labor force to enter the site, and do a good job in the disclosure of team construction technology and safety technical measures.

2) Supervise and inspect the construction of team members according to the drawings, specifications and construction scheme.

3) Organize the team to carry out self-inspection, mutual inspection and handover inspection, and organize workers to make rectification in time when unqualified items are found, so as to ensure the quality of the team working face is up to standard.

4) Be responsible for conveying the management contents of the project department and reporting the team situation, and making timely adjustments.

5) Seriously abide by the safety laws and regulations and relevant safety production systems, and be responsible for the safety and health of this group of personnel in production.

6) Do a good job in safety activity day, hold a pre-shift and post-shift safety meeting, and conduct on-site team-level safety education for newly transferred workers.

7) Organize this group of employees to learn construction technology and safety laws and regulations, and check the implementation. Under no circumstances are you allowed to violate the rules, and you are not allowed to use mechanical, electrical, shelf and other equipment without authorization.

8) Regularly check the safety production situation on the construction site, strengthen the safety self-inspection, solve the problems found in time, take temporary control measures if they cannot be solved, and report them in time.

9) Make detailed records of industrial accidents and report them in time, and organize the whole group to analyze them carefully and put forward preventive measures. In case of heavy casualties, the site must be protected and reported to the director of the project department immediately.

10) has the right to refuse illegal instructions to ensure the production safety of the team.

Project Management Department Job Responsibilities 2 Job Responsibilities

First, seriously study business theory and improve the level of business work.

Two, assist the director to do a good job of foreign guests' service reception, be polite, civilized and enthusiastic.

Three, responsible for the reception supplies collection, storage, sorting and distribution work, be strict, practical, meticulous, time-saving, rational use, put an end to waste.

Four, responsible for the superior leaders and relevant personnel to the mine inspection, inspection, guidance to receive labor protection supplies, make preparations.

Five, responsible for large-scale collective activities of enterprises, leading the main activities, the camera records of superior leaders' activities in the mine, and timely verify the records, and fill in the cards completely and accurately.

Six, radio and communication business leaders, responsible for the arrangement of radio programs in mining areas, in-depth actual collection and writing between mining areas, timely reflect the production and business activities in mining areas and other important news and important things, and activate the spiritual and cultural life in mining areas.

VII. Organize service personnel to regularly clean and replace articles in leading offices, conference rooms and other public places of the Group, and keep them clean and sanitary, and the rooms are quiet and comfortable.

Eight, to participate in large-scale meetings of the administrative collective preparation services.

Nine, complete all kinds of temporary tasks assigned by the leadership, organize amateur dance for employees, etc.

Project Management Department Job Responsibilities 3 Job Responsibilities:

1, responsible for the management and implementation of nuclear power project management projects;

2. Familiar with project management related knowledge, including: schedule, cost, quality, safety, etc.

3. Lead the implementation team to conduct demand research, detailed design, functional testing, implementation and delivery, control the project schedule and cost, and provide daily business support for customers.

Requirements:

1, full-time bachelor degree or above, major in information management, computer and other related fields;

2.3 years or above project consulting, implementation or management experience, participating in 1 or above project management and implementation, and serving as project manager or on-site executive manager;

3. Good communication skills, learning and refining skills, independent work ability, expression ability and integration ability, high professionalism and good teamwork spirit, and be able to independently design implementation plans and team training;

4. Familiar with ifs products is preferred;

5, can adapt to long-term business trips.

Responsibilities of Project Manager Department 4 Responsibilities of Quality Inspector

1. Carry out the project quality policy, construction acceptance specification, quality inspection evaluation standard and relevant regulations, and be responsible for the supervision and inspection of the project quality.

Second, participate in the quality inspection and quality re-inspection of key working procedures and key parts, and be responsible for issuing inspection records of unit projects, sub-projects and concealed works.

Three, in violation of state regulations, norms and neglect of quality of the relevant units and individuals to criticize and deal with opinions, do not meet the quality standards of the project, have the right to be ordered to stop work, the exercise of quality veto.

Four, under the leadership of the project manager, responsible for the quality and measurement of the whole construction process.

Five, familiar with engineering drawings, procedures, specifications, supervise the builder according to the figure construction, have the right to correct the wrong construction, when necessary, can make it stop construction, and report to the project manager.

Six, supervise and inspect the construction team self-inspection, mutual inspection, handover inspection, responsible for the project quality acceptance, and be responsible for the project quality acceptance.

Seven, check the quality of the hidden part of the project, and supervise, in conjunction with the relevant personnel to do a good job of visa.

Eight, strictly supervise the quality of raw materials and semi-finished products, and resolutely repel unqualified materials.

Nine, participate in and assist the quality inspection work of units and leaders at all levels, participate in the investigation and analysis of quality accidents, and actively promote the experience and measures to improve quality.

Ten, under the command of the relevant departments of the company, study hard and constantly improve the level of work and business.

Job responsibilities of Project Management Department 5 Job responsibilities:

1, responsible for bill review of various projects and businesses of the company, accounting and reconciliation of accounts receivable and accounts payable of various business units of various projects, and revenue and expenditure business of various projects.

2. Be responsible for checking whether the vouchers are consistent with the transactions, and checking each subsidiary ledger with the general ledger at the end of the month to timely reflect the increase and decrease of funds, changes, current settlement and expenses.

3, responsible for the preparation of accounting vouchers, complete the project cost, accounting, so that the voucher summary is clear and concise, the subject is used properly, the data is accurate, the attachment is complete, and the account book vouchers are not altered.

4. Establish an internal accounting system, assist the head office or project department leaders to formulate internal accounting methods and standards, record internal accounting data, analyze internal accounting results, and handle other matters related to internal accounting.

5. Be responsible for supervising the financial operation of the company's project department, and check the cash, receivable (paid) vouchers and receivable (paid) bills with the cashier in time to ensure that the accounts are consistent.

6. Regularly supervise the implementation of all kinds of contracts, timely feedback the problems found in contract implementation, and be responsible for the establishment of contract ledger of the financial planning department.

Requirements:

1, with a college degree or above in finance and other related majors, holding an accounting qualification certificate, and having more than 3 years of accounting experience as a general taxpayer.

2, understand the national financial policies and accounting and tax laws and regulations.

3. Skilled in using all kinds of financial and office software and computer operation.

4. Strong sense of responsibility, communication, understanding and analysis skills, good professional ethics and teamwork spirit.

5. This position requires projects inside and outside Henan Province.

Responsibilities of Project Management Department 6 1. Be fully responsible for the production planning, progress tracking, supervision and implementation of project quality, progress and cost, and be responsible for the whole project;

2. Be responsible for production organization, technology and management, and control the quality, progress, cost and expenses of the project;

3. Be fully responsible for communication and coordination inside and outside the project, and be able to better coordinate the relationship between the company's internal team and external owners and supervisors;

4. Assist in project bidding, budget and final accounts;

5, in the process of implementation of the subcontract team, suppliers for regular assessment, evaluation;

6. Complete other tasks assigned by superior leaders.

Job requirements:

1, bachelor degree or above, aged 30-40, major in landscape architecture and civil engineering is preferred;

2, intermediate and above titles, with a first-class builder or more than two-level landscape engineering project manager certificate is preferred;

More than 3.6 years relevant working experience, more than 3 years working experience in large construction enterprises or landscape engineering management and equivalent positions;

4. Strong coordination and communication skills, able to coordinate the relationship between the internal team of the company and the external owner and supervisor;

5. Strong production, technology and business organization capabilities; Strong project quality, schedule, cost and expense control ability; Strong field management ability and construction management experience;

6, understand the project bidding, budget and final accounts, and have experience in participation;

7. Have certain social resources (such as labor service pair, material supplier, relationship with Party A, etc.). );

8. Recognize the company's corporate culture, be loyal to the company, be proactive, and have a strong team spirit;

Responsibilities of Project Management Department 7 1. Familiar with and in-depth understanding of national technical policies, technical standards and norms for atmospheric and water environmental governance.

2. Investigate and identify the technical advancement and applicability related to atmospheric and water environment control, and cooperate with the company in cooperation and negotiation of relevant technical resources.

3. Integrate relevant technical achievements and technical resources to form a comprehensive technical solution suitable for the project.

4. Coordinate technical work among related disciplines, organize technical training for business backbones, and improve the overall professional skills of the team.

5. Be responsible for the development of the company's business system to ensure the normal promotion of products and projects;

Qualifications:

1, bachelor degree or above in environmental engineering, atmospheric and water environment, with more than 2 years of on-site project management experience in atmospheric and water environment management;

2. Have standardized programming habits and documentation skills, and actively cooperate with the company's standardization construction.

3. Good language expression and communication skills;

4, can bear hardships and stand hard work, can adapt to business trips and construction site environment.

5. Strong problem analysis and problem solving skills, and the courage to face challenging problems;

6. Good communication and coordination skills, teamwork spirit and execution, open-minded, positive and continuous learning;

Basic requirements for the post of project manager:

1, major in environmental engineering or related, male or female;

2. Interested in developing environmental protection engineering industry in Hangzhou;

3, have a solid theoretical knowledge of three wastes treatment, familiar with the relevant laws, regulations, standards and norms of the industry;

4. Sincerity, kindness, hard work, strong pressure resistance and good team spirit;

5. Engineer certificate or driver's license is preferred.

Responsibilities of Project Manager Department 8 Responsibilities of Professional Engineer

1. Organize the implementation of the company's technical management rules and relevant industry standards and specifications promulgated by the state to realize the design intent.

Second, responsible for organizing the review of design documents, checking the quantities, and solving the questions in the construction drawing in time.

Three, participate in the construction survey, organize the construction survey, prepare the implementation of the construction organization design, and organize the implementation after approval according to regulations.

Four, guide the daily work of technical personnel. Check the construction technical disclosure of special processes and key processes.

Five, check and guide the site construction personnel to carry out construction technical disclosure, and timely correct the illegal operation.

6. Handle matters related to design changes and claims.

Seven, the preparation of special construction plan in the process of construction, and in accordance with the provisions, timely report to the superior management department for approval.

Eight, organize the preparation of quality, environment, occupational health and safety technical assurance measures, timely correct the deviation in the implementation process.

Ten, timely handle external inspection and valuation, project liquidation and other matters. Participate in the internal cost financial analysis of the project department, and participate in the project payment settlement of subcontractors.

12. Organize and arrange the compilation, collection and collation of relevant technical documents, compile the summary of construction technology in time, and complete the compilation of completion documents in time.

Responsibilities of Project Manager Department 9 Responsibilities of Technical Personnel

A, responsible for the company's overall technical work, to assist the manager to complete the task of engineering and technical management.

Second, adhere to the principle, be honest and diligent, set an example, go deep into the construction site, balance and coordinate the construction procedures, and deal with all kinds of technical problems in construction in time.

Three, responsible for organizing the blue prints.the design, technical disclosure, outsourcing design projects, first of all should be familiar with the drawings, responsible for contact with the design unit.

Four, responsible for product processing, initial maintenance of equipment, technical guidance for project construction, and participation in project acceptance.

Five, responsible for leading the design of new products, and sorting out the technical data of new products.

6. Be responsible for the technical acceptance of special profiles, fittings and outsourced castings.

Seven, responsible for drawing materials and accessories, prepare monthly attachments, and report the monthly plan of materials three days in advance.

Eight, responsible for the standard data sorting, inspection, guidance, regular recycling, for inspection.

Nine, often go deep into the scene, solve the quality and safety hazards, be responsible for safety and quality, completion acceptance, ten-day inspection and monthly acceptance, and coordinate and solve problems in time when found.

Ten, complete the temporary tasks assigned by the leadership, and participate in various meetings and collective activities within the scope on time.

Eleven, strengthen the contact with the business department, do a good job of sorting out technical data.

Twelve, actively organize employees to learn business, and assist the project manager to do a good job.

Job responsibilities of the project manager department 10 Job responsibilities of the builder

A, the builder under the leadership of the project manager, in strict accordance with the mandatory standards, specifications, drawings and construction organization design for construction.

Second, participate in the blue prints.the design, concealed engineering acceptance, technical review, design change visa, intermediate acceptance and completion settlement, etc. , and collect all technical data for archiving.

Three, carefully prepare the production plan and construction plan, organize the implementation of construction technology, quality and safety technical measures.

Four, according to the requirements of the project schedule, organize and coordinate the labor arrangement and mechanical equipment, materials in and out.

Five, the builder should be familiar with drawings and construction specifications, to do a good job of measuring and setting out the project construction site, and ensure its accuracy.

Six, each division, subdivisional work and the builder of the inspection lot must organize the construction according to the relevant norms and standards, and at the same time do a good job in production safety.

Seven, the builder should organize the team leader to do a good job of self-inspection, mutual inspection and handover inspection of subdivisional work, strictly control the quality, and cooperate with the supervision engineer to do a good job of acceptance of concealed works.

Eight, fill in the construction log carefully, make the original records of the whole project construction process, and be responsible for the overall deployment and general layout of the construction site.

Nine, to inspect and supervise the purchased materials, and assist the warehouse administrator to manage the warehouse materials and equipment. The builder has the right to refuse to use unqualified raw materials, to organize unqualified sub-projects to be reworked, and to reward and punish the quality.

Ten, assist the project manager to do a good job of user quality return visit.

;