When will the Hejin high-speed railway start?
The project is expected to start construction in 2024.
According to the information of Linfen municipal network, the feasibility study, preliminary design and construction drawing of Hejin-Houma high-speed railway are planned to be completed in 2023, and the construction bidding will be completed by the end of the year, and construction is expected to start in 2024.
Hanhehou Intercity Railway is a new intercity railway between Hancheng, Hejin and Houma. It starts from Hancheng East Station, passes through hancheng city, Hejin, Jishan and Xinjiang in Shaanxi, and ends in houma city. The main line is 80 kilometers long and has five stations, with a total investment of about 654.38+065.438+00 billion yuan.
- Related articles
- What certificate do recruiters of Land and Resources Bureau need?
- What beaches can I play in Shenzhen?
- Resume of psychological counselor application
- What are the requirements for the 2022 Wulanchabu institution examination?
- Ace to Ace Creative Team
- Are you tired of unloading goods in Mayong Jingdong Asia?
- Who is the boss of Jiuyou APP?
- Is it easy to find a job in Puning, Guangdong?
- What's the environment like in Zoucheng Everbright?
- What good careers do liberal arts students have in the future?