Job Recruitment Website - Zhaopincom - Shaanxi Xianyang Weihe Power Generation Co., Ltd.

Shaanxi Xianyang Weihe Power Generation Co., Ltd.

Shaanxi Weihe Power Generation Co., Ltd. is a modern large-scale backbone power enterprise, located in Zhengyang Town, the eastern suburb of xianyang City, Shaanxi Province, facing the ancient city xi 'an across the river, about 20 kilometers away from Xi 'an City and Xianyang City. The company has an installed capacity of 4× 300,000 kilowatts and is located in Shaanxi Power Load Center, with an annual agreed on-line electricity consumption of 6.55 billion kWh.

Founded on May 8, 1997,/kloc-0 is a Chinese-foreign cooperative enterprise with 5 1%, 30% and 19% shares respectively invested by CTS (Group) Company, Northwest Electric Power Group Company and Shaanxi Electric Power Construction Investment and Development Company. It is the largest thermal power generation enterprise in Shaanxi Province and the largest Sino-foreign joint venture in Shaanxi Province since the founding of the People's Republic of China. The company implements the general manager responsibility system under the leadership of the board of directors. The company has total assets of 5.4 billion yuan, registered capital of 65.438+0.8 billion yuan and 2,652 employees. Among them, there are 296 senior and intermediate titles and 569 junior titles; There are 534 people with college education or above, and 6 10 people with technical secondary school education.

Shaanxi Weihe Power Generation Co., Ltd., formerly known as Weihe Power Plant of Northwest Electric Power Administration, was founded in 1966. Two 50,000 kW coal-fired units made in East Germany were installed in the first phase of the project, with an investment of 710.3 million yuan, which were put into operation in February 1970 and September/97/kloc-0 respectively. The expansion project is a joint venture between the state and Shaanxi Province to alleviate the serious power shortage in Shaanxi Province. The project is constructed in two phases, and four 300,000 kW coal-fired units are installed. 1992 Two 300,000 kW units were put into operation for power generation; 1995, two more 300,000 kw units were put into operation. At this point, the expansion project is over, with a total installed capacity of1300,000 kilowatts, and the new and old factory areas and welfare areas cover an area of 1320 mu.

The treatment is good, welcome!