Construction method of marble background wall: After decoration planning, the construction method is introduced below.

Natural marble material is generally heavy, and double safety installation is generally adopted to ensure safety.

That is, first connect the board with the basic skeleton, and then reinforce it with glue.

First, the basic treatment of background wall installation is the basic treatment of wall surface.

Grassroots metope must be cleaned, can not have aggradation, floating ash, and besmear brushs moistureproof layer leveling.

Second, the keel is installed and fixed. For thick marble slabs, the use of steel keel can reduce the impact of slate on the wall and improve the overall seismic capacity.

According to the scheme, the wall is drilled and fixed parts are buried, the wall fixed parts are welded with the keel, and the keel is welded with the support frame. Require the keel to be installed firmly and flush with the wall.

Third, the marble slab installation stone installation should pull the overall horizontal and vertical control lines.

Slate must be installed on the support frame. First, fix the lower part of the marble slab, drill holes, insert the hanger of the support frame, fine-tune and lock it, then fix the upper part and side of the stone, and finally connect the vacant anchoring agent to strengthen the slab.

Four. Slate caulking technology After the marble slab is installed, the gap between the slab and the slab is bonded.

Clean up the dust and impurities in the gap first, fill the gap with foam strips, and stick tape paper on the edge of the plate to prevent the adhesive from polluting the marble surface. After gluing, the glue joint should be smooth and straight.