Simple contract for contracting exterior wall coatings

Simple contract model of exterior wall coating contracting

In a progressive society, we use contracts more and more. The purpose of signing a contract is to protect the interests of both parties and avoid unnecessary disputes. So what is a formal contract? The following is a simple contract model for contracting exterior wall coatings that I collected for you. Welcome to share.

Simple Contract for Exterior Wall Coatings 1 Party A:

Party B:

Party A contracts out the exterior wall coating project to Party B for construction. Following the principles of voluntariness, honesty and credibility, and in order to clarify the rights and obligations of both parties, both parties entered into this contract through consultation.

I. Project name:

Two. Scope and form of project contracting: the wall, slab and line of the unglazed part of the external wall (specifically according to the part designated by Party A) shall be contracted for construction in the form of contracting work and materials.

Three. Duration and quality: subject to Party A's notice, the quality is qualified or above. Top coat adopts Dulux brand paint.

Four. Contract fees and payment methods:

1. Contract fees and settlement method: settled according to the actual construction area, with the unit price of 38 yuan/m2 (RMB 380,000 only), which has included all foreseeable and unpredictable expenses and risks of Party B. ..

2. Payment method: When the outrigger is dismantled, all the projects within the contract scope are completed, and the total project price shall be paid within 10 days after the acceptance, without paying the project payment in advance.

Verb (abbreviation of verb) Responsibilities of both parties:

(I) Party A's responsibilities

1, and make technical disclosure to Party B. ..

2, responsible for organizing the acceptance.

(II) Party B's responsibilities

1, the materials used must meet the quality requirements, and the factory certificate of the materials shall be provided. Must strictly obey the arrangement of Party A's management personnel. The workers are responsible for their own accommodation.

2, the construction quality must conform to the requirements of the construction design, design changes, construction mandatory provisions, construction acceptance specification.

3, completes the finished product protection.

4. Party B shall operate in strict accordance with safety regulations to prevent accidents. Ensure safe production. All safety accidents and responsibilities shall be borne by Party B. ..

Liability for breach of contract of intransitive verbs:

1. If the project contracted by Party B fails to meet the time limit and quality required by Party A, Party A has the right to dismiss Party B at any time, and all expenses shall be borne by Party B without settlement.

2. Party B unconditionally reworks or replaces materials due to quality defects or blanking errors caused by Party B's own reasons.

3. Party B shall take full responsibility for the safety and labor of its workers. The breaching party shall be responsible for the losses caused by the safety of Party B's workers and labor disputes.

Seven. This contract is binding on both parties, and the breaching party shall be responsible for the losses caused by either party's breach of contract.

Eight, this contract shall come into force from the date of signature by both parties, and shall be terminated on the date of payment of the project. This contract is made in duplicate, one for each party. Matters not covered shall be settled through consultation.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Simple Contract for Exterior Wall Coatings 2 According to the Economic Contract Law of the People's Republic of China, the Regulations on Processing Contracts and other relevant regulations, combined with the specific conditions of this project, Party A and Party B agree to sign this contract through friendly negotiation for mutual compliance.

Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _

Party A will _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ to Party B for construction. In order to clarify the responsibilities of both parties and ensure the smooth progress of the project, according to the relevant provisions of the Contract Law of People's Republic of China (PRC) and the Construction Law of People's Republic of China (PRC), the two parties reached an agreement through full consultation and signed this contract for mutual compliance.

Article 1: Engineering situation

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _

2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2: Contract Unit Price (excluding tax)

1, flat coating: _ _ _ _ _ _ _ Yuan/m2.

2. Real stone paint: _ _ _ _ _ _ Yuan/m2.

3. Sewage pipeline: _ _ _ _ _ _ yuan/square meter.

4. Mechanic: _ _ _ _ _ _ Yuan/day.

Article 3: Project Settlement Method

1. Party A shall pay 80% of the monthly progress to Party B one month after Party B enters the site for construction. After the project is completed and accepted, Party A shall pay 99% of the total project cost to Party B, and reserve 1% quality guarantee fund. The warranty period is one year, and Party A shall pay Party B in one lump sum within fifteen days after the expiration of the warranty period.

2. The total project cost is settled in cash, and Party B contracts the project. After completion, it is calculated according to the actual workload and settled according to the visa.

3. Within 30 days after the project completion acceptance, Party B shall be responsible for sending the project price settlement book to Party A for review and settlement.

Article 4: Expiration of the Contract

1. After Party A issues the notice of mobilization, Party B must arrange workers to mobilize for construction within 7 days, and the effective construction period is _ _ _ _ _ _ _.

2. In the process of construction, in case of any of the following circumstances, the construction period will be postponed.

① Encounter irresistible disasters or accidents (including work stoppage in rainy season).

(2) Party A requests to change the design drawings, project contents or add projects.

Article 5: Engineering Quality Grade

1. Party A's requirements for project quality: subject to technical disclosure, it will not peel or fade during the warranty period.

2. Both parties have disputes over the quality of the project and submit them to the construction project quality supervision department for arbitration.

Article 6: Responsibility Scope of Party A and Party B.

I. Responsibility of Party A

1. Party A shall provide water, electricity, workers' accommodation and scaffolding (more than 4.5m), and the expenses shall be borne by Party A..

2. Party A shall pay the project payment to Party B according to the schedule, and be responsible for providing information related to the construction.

3. Party A shall assist Party B to solve the problems that Party A should be responsible for, negotiate with Party B to solve the problems in construction, and handle the project progress and on-site visa work delivered by Party B in time. ..

4, responsible for organizing the project completion acceptance.

II. Responsibility of Party B

1. Party B shall examine the qualifications of the construction personnel it employs and be responsible for ensuring their personal safety.

2. The physical quality and skills of employees can meet the needs of work. The minimum age of workers shall not be less than 18, and the maximum age shall not exceed 55.

3. Party B promises to operate in strict accordance with the painter's process to ensure the construction quality.

4. During the warranty period, if Party B's quality problems require maintenance, Party B shall be responsible for free maintenance services. If maintenance is needed due to man-made damage or all other abnormal damage reasons, Party A and Party B shall negotiate together.

Article 7: Liability of both parties for breach of contract

1. After the contract comes into effect, the party who withdraws from the contract without authorization shall pay Party B 10% of the total contract amount as liquidated damages.

2. If Party A fails to pay due without justifiable reasons, and Party B still fails to pay after being urged, Party B has the right to stop the construction, and the consequences arising therefrom shall be borne by Party A. ..

3. If Party A fails to make payment according to the provisions of the contract, or delays the completion due to Party A's reasons, it shall pay Party B 65,438+0% of the project cost of this contract for each day overdue.

4. If Party B can't complete the project according to the contract period or the construction quality can't meet the requirements of national standards, Party B must rework and repair. If the construction period is delayed due to rework, Party B shall pay Party A 65,438+0% of the contract price for each day overdue.

Article 8: Supplementary provisions

1. This contract has legal effect once it is signed, and neither party has the right to terminate it.

2. In case of disputes and contradictions during the execution of this contract, both parties shall settle them through consultation. If the coordination fails, they may bring a lawsuit to the people's court where Party A is located according to law.

3. This contract is made in quadruplicate, three for Party A and one for Party B, all of which have the same legal effect. For matters not covered, both parties can sign supplementary terms after consultation, and the supplementary terms have the same effect as the text.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Simple Contract 3 for Exterior Wall Coatings Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credit, both parties reached an agreement on the construction of exterior wall coating engineering and signed this contract.

I. Overview of the Project:

1, project name:

2. Project location:

Second, the way of contracting:

Contract engineering, materials and scaffolding.

III. Contents and Price of the Contract

"Nippon" brand exterior wall paint is adopted in the existing exterior wall paint decoration sub-projects of this project, and the color-mixed exterior wall paint is 38.00 yuan per square meter. Other exterior wall coatings are 35.00 yuan per square meter. Cement paint for interior stairs 15.50 yuan per square meter. The above unit price does not include supporting fees and taxes, and the required scaffolding erection and demolition costs are included in the paint price.

Fourth, the construction and quality requirements

1. Party B must carry out the construction in strict accordance with the current codes and standards, and the acceptance requirements of sub-projects are above the standards.

2. Coating quality requirements: the surface color is uniform, without flash, undercut, sagging, pimples, sand holes and brush lines. Decorative lines, color separation lines, straightness and vertical elevation are within the allowable deviation range, and the angle of Yin and Yang is straight.

3. Material requirements: Primer and topcoat shall be checked and accepted by Party A together with the supervisor, and used after they meet the requirements.

4. Primer and topcoat should be mixed according to the product description.

5. If the quality fails to meet the requirements, Party B shall be responsible for the loss of reworked materials, and Party B shall be responsible for the fines imposed by the relevant departments for the quality problems caused by Party B. ..

Verb (abbreviation of verb) construction period

1. Party B shall organize labor according to the requirements of Party A's construction progress.

2. Duration: determined through negotiation according to Party A's requirements and Party B's actual situation.

Settlement and payment methods of intransitive verbs

1. Settlement method: the quantity of interior wall coating is calculated according to the actual developed area, and the unit price of each item is multiplied by the actual quantity.

2. Payment method: No payment is prepared for this project, and 80% of the monthly progress payment will be audited by relevant departments. After the project is completed and accepted, Party B will provide the project settlement materials and send them to Party A. Party A will pay 97% of the total project price to Party B according to the payment methods of the owner and Party A, and the remaining 3% will be paid as the quality warranty fund within one month after the project is completed and accepted.

Seven, safety construction

During the construction, Party B shall carry out the construction in strict accordance with the safety operation regulations, strengthen the safety education and management of the construction personnel, and take necessary safety measures. In case of safety accident, all responsibilities and economic losses shall be borne by Party B, and Party A shall not bear any responsibilities.

Eight. Party A's responsibilities

1, responsible for coordinating the working relationship between Party B and other construction units on site.

2. Provide Party B with a copy of the corresponding construction drawings of this project, and make technical disclosure on quality and safety to Party B. If there is any change in the design of the drawings during the construction, Party B shall be informed in time, otherwise, a visa shall be issued.

3. Party A shall provide water and electricity at the site, and the expenses shall be borne by Party A. It shall be equipped with vertical transportation machinery and full-time personnel to drive the elevator, conduct technical disclosure and on-site inspection in time, solve problems in time and provide water and electricity for the construction site.

Nine. Party B's responsibilities

Except the mechanical equipment provided by Party A, all other tools (including rain gear) shall be the responsibility of Party B, which shall be organized in strict accordance with the construction progress to ensure the construction period and quality.

X. supplementary provisions

1. If there are matters not covered in this contract, a supplementary agreement can be signed separately through negotiation between both parties, and the supplementary agreement has the same legal effect as this contract.

2. This contract is made in duplicate, with each party holding one copy.

3. This contract shall come into effect from the date of signing, and shall be terminated after the project is completed and accepted and the project payment is settled.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

;