Job Recruitment Website - Zhaopincom - The renovation process of the new house must be seen at the first time.
The renovation process of the new house must be seen at the first time.
The new home improvement technology must be seen for the first time.
The new house decoration technology must be seen at the first time.
First, the tools are in place and ready.
Before decorating, you must prepare several things for your bag. Tape measure (buy 5 meters, not 3 meters), calculator, large plate clip (clip list, receipt); In addition, it is best to prepare old towels (soft cotton, tiles) and plastic bags (winding pipe joints to prevent dirt from blocking) at the construction site.
Second, choose Huang Daoji to work with guns.
Before workers enter the site, it is best to measure the corner of the house and personally take down the pen ruler and mark it clearly. Don't be lazy. The measurement contents mainly include: 1. Areas involved in the decoration process, especially tile area, wall coating area, wallpaper area and building area; The other is to determine the size of the main wall. Design the wall size of furniture in the future.
Third, the main demolition makes the space more practical.
The main demolition mainly includes demolition, wall construction, wall skin, heating, plastic windows and so on. After the demolition, the garbage should be cleaned in time to ensure the cleanliness of the room and facilitate the construction. At the same time, the finished door needs repairing. Cabinets, range hoods, cookers, and water heaters should also take a walk and try to make sure.
Fourth, hydropower transformation, arrange the use of each space.
Once there is a problem with the hydropower transformation, there is no regret about eating. The wall is brick and the ceiling is open, so it is difficult to add a socket. So be sure to locate the switches, lights, bathroom cabinets, bathtubs, washing machines, etc. Before the hydropower transformation, the cabinet designer should go to the door to measure and help you determine the transformation design of power and waterway. As for the water heater, it is best to send someone to design the position of power supply and interface according to the model you have determined.
Five, vertical tube, ugly tube.
Kitchen and bathroom have a unique damp environment, so the material of riser must not use wooden keel. Even if the anti-corrosion coating on the wooden keel is not enough, everyone must be careful. The bag riser should use light steel keel or red brick as far as possible. Light steel keel saves, but considering the firmness, it is still red brick.
The renovation process of the new house for the first time must be seen.
Six, ceramic tile, the first piece is made of physical texture.
Buy a floor drain before tiling. Please note that the floor drain should buy a special washing machine or shower, and it should be odor-proof. Waterproof is ready for collage. In addition to the normal precautions of tiles, tiles should be soaked in water and dried in the shade. Broken tiles are kept for cutting, which also emphasizes the overall aesthetic feeling of tiles. Simply put, it is a brick on the wall, and its width cannot be less than 10 cm.
Seven, the oil man went into battle to brush.
If you don't buy finished doors, let the workers do them. It is worth noting that any wood products, even just mouthwash, must follow this step. The large core board is sunken and decorated before painting. When mixing oil, an irresponsible worker is lazy and brushes oil directly on the big core board. This is absolutely wrong. Don't believe the story of selling big core boards, you can brush oil directly on them. Remember, it takes a long time to solve all the problems by brushing oil directly. Now mix, don't use a brush, use a spray. Workers had better spray the white inside the door together with the instrument box. It's not wasteful and beautiful. Need to remind everyone that if the wall is painted with color, you must pay attention to the color, which is lighter than the color card and must not be darker than the color card, otherwise you will regret it. Because the wall is painted at least twice, about three times, the color of the wall above will be darker than that of the first layer.
Eight, wallpaper, create a beautiful wall.
Wall paint brush, oil painting alliance brushes nitrocellulose paint where wallpaper needs to be pasted. Paint can be dried every other day, and then wallpaper can be pasted everywhere. In addition, don't open the window for ventilation after 48 hours, and let it dry slowly. You can also communicate with the decorator to repair personal ups and downs.
9。 Install socket boards, kitchen and bathroom ceilings.
It is best to buy sockets with switch function, especially for kitchen use, so that rice cookers and microwave ovens can be plugged in and switched. First, install the water heater and Yuba. After installation, the ceiling can be used to clean the water heater better and more beautiful.
10。 Put on the cupboard, and a beautiful whole kitchen was born.
The cabinet is a supporting project, and the range hood, stove and sink should be agreed in advance. It is best to deliver it on the same day and install it at the same time as the cabinet. Discuss with the cabinet factory in advance, and you can bring an artificial stone countertop that cuts the stove and sink together.
1 1。 Install the finished door and install hardware.
It is worth mentioning that the installation door must be installed in front of the floor to avoid unnecessary damage to the floor during the door installation process. Install hangers, curtain rods, lamps, sanitary wares, sanitary wares and other hardware. Before installing the floor, it is also recommended to repair these dusty items.
12。 Floor, install radiator in turn.
Floor installation must be flat in front of the floor. You can prepare a little pepper in advance. Don't buy the so-called insecticidal powder brought by the floor workers, let them scatter it in the corner together. At the end of the decoration, it is easy to be ignored. It must be made clear in advance that the single cover will not be signed unless it is the manufacturer's seal, so please pay attention to all kinds of documents for installing the radiator. If you agree to wear the team seal, it basically means that you give up the right to pursue the responsibility of the manufacturer. Once the accident has soaked the floor and flooded the house, the manufacturer will pass the buck and the installation team can't find anyone. The so-called warranty can only be borne by the user himself.
Thirteen, furniture, home appliances gorgeous debut
Furniture plays an important role in building a new home. Bed, mattress, wardrobe, shoe cabinet, sofa, dining table, etc. Before the existing furniture is environmentally friendly, the following items should be prepared: disposable shoe covers (don't buy inferior ones, they are trampled), boxes of activated carbon, ladders, floor protective films, etc. If you buy a cloth bed, a cloth sofa, etc. I suggest you take away all the parts that can be removed with cloth.
14, soft-packed, assembled and decorated, creating a taste of home.
The steps of home improvement have changed from decoration to decoration, including the installation of curtains, which are all part of home accessories. With decorative paintings and beautiful curtains, the gentle taste of home comes out. The time to buy curtains is usually to avoid style conflicts after ordering furniture. Home accessories can also consider buying some green plants that absorb formaldehyde, hand-made photo walls, craft accessories and so on.
The above is the basic overview and introduction of Bian Xiao. I'll explain it to you today. I believe that everyone knows more or less. I hope this article can help you. You can also log in to Tuba Rabbit to view and subscribe to more relevant content and information.
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~
- Previous article:Requirements for bare soil coverage in Yichang construction site
- Next article:How to add Goubangzi bacon?
- Related articles
- Where can I find air conditioning?
- Where does Shenyang Auxiliary Police Training live?
- Look who told this funny joke.
- Where does Shanxi Changzhi high-speed rail recruitment register?
- National policy professionals?
Debate: Does today's society need comprehensive talents or professionals?
Comprehensive ability is like a gifted scholar in ancient times. He is proficient i
- Is there anything delicious near Jinan West Railway Station?
- Bus route from Hengli Jiarong Shopping Plaza Station to Da Lang Yangyong Station
- Is there any accommodation in Daoming Optical Yongkang Factory?
- What is the phone number of Zhejiang Wanfeng Aowei Steam Turbine Co., Ltd.?
- How about Fuyang Lushan New Energy Plant?