Job Recruitment Website - Ranking of immigration countries - What does the river connected by the South-to-North Water Transfer Project not include?
What does the river connected by the South-to-North Water Transfer Project not include?
The South-to-North Water Diversion Project is a strategic project of China people, which is divided into three routes: east, middle and west. The starting point of the East Line Project is located in Jiangdu Water Control Project, Yangzhou City, Jiangsu Province. The starting point of the middle route project is located in Danjiangkou Reservoir in the middle and upper reaches of Hanjiang River, and the water receiving areas are Henan, Hebei, Beijing and Tianjin.
From 2065438 to September 2002, the relocation of migrants in Danjiangkou reservoir area of the Middle Route of South-to-North Water Transfer Project was fully completed. The South-to-North Water Transfer Project mainly solves the problem of water shortage in northern China, especially in the Huang-Huai-Hai River Basin, with a population of 438 million. The Middle Route Project of South-to-North Water Transfer and the East Route Project of South-to-North Water Transfer (Phase I) have been completed, and water has been transferred to the northern region.
Engineering concept
Since President Mao Zedong put forward the idea of "South-to-North Water Transfer Project" in 1952, under the leadership and care of the CPC Central Committee and the State Council, the vast number of scientific and technological workers have done a lot of on-the-spot investigation and investigation, and on the basis of analyzing and comparing more than 50 schemes, they have formed the basic scheme of transferring water from the east, middle and west routes of South-to-North Water Transfer Project, and achieved a lot of valuable results.
The South-to-North Water Transfer Project mainly solves the problem of water shortage in northern China, especially in the Huang-Huai-Hai River Basin, with a population of 438 million.
The final water transfer scale of the South-to-North Water Transfer Project is planned to be 44.8 billion cubic meters, including 654.38+04.8 billion cubic meters in the east, 654.38+03 billion cubic meters in the middle and 654.38+07 billion cubic meters in the west. The construction time will take about 40-50 years. After completion, it will solve the problem that more than 7 million people drink high fluorine water and brackish water for a long time.
- Related articles
- Why did Ma Yun immigrate to Hong Kong?
- What are the cheapest ways to immigrate to Australia?
- Can the dream of moving to Mars come true?
- Can I renew my Hong Kong and Macao Pass at the self-service machine in Zhaoqing?
Can I renew my Hong Kong and Macao Pass at the self-service machine in Zhaoqing?
A: Yes, the household regi
- The first letter I received from an American immigrant f4 told me not to change my address.
- I would like to ask which primary school Victoria intends to attend in Lingxi, Cangnan.
- People who know American visas come in! ! ! ! On B 1 B2 and L2
- What does anti-globalization mean?
- Can Australian students apply for student loans in Australia?
- Appreciate "The world of spring flowers seems to be drifting away from me, and carefree years wave goodbye to me" in Wind and Lotus. Occasionally, I can only live.