Environmental Assessment Report
Environmental Assessment Report Sample
Environmental Assessment Report Sample, with the continuous improvement of personal quality, reports are closely connected with our lives, and there are different types of reports according to different uses. Before writing, you can refer to the sample text. The following is a sample environmental assessment report. It is for reference only. Everyone is welcome to read it. Environmental Assessment Report 1
1. Overview
1.1 Origin of the project
1.2 Purpose of preparing the report
1.3 Basis for preparation
p>
1.3.1 Laws, regulations, procedures and standard basis
1.3.2 Basic information and power of attorney
1.4 Evaluation standards
1.4. 1 Environmental Quality Standards
(1) Surface water environment
The surface water environmental quality of Mayong River complies with the "Surface Water Environmental Quality Standards" (GB3838-2002) ) in Category III standards.
(2) Air environment
The regional air environment quality complies with the secondary standard of the "Ambient Air Quality Standard" (GB3095-1996).
(3) Acoustic environment
The quality of the regional acoustic environment shall comply with the second category standard in the "Acoustic Environment Quality Standard" (GB3096-2008).
(4) Groundwater environment
The groundwater environment implements the three categories of standards in the "Groundwater Quality Standard" (GB/T14848-93).
(5) Soil environment
The soil in the assessment area complies with the secondary standard in the "Soil Environmental Quality Standard" (GB15618-95).
1.4.2 Pollutant emission standards
⑤ Evaluation scope
List separately according to environmental factors, and briefly describe the reasons for determination. An evaluation map giving the evaluation scope.
⑥Control and protection objectives
There are pollution sources that do not need special control; there are targets that do not require key protection, such as special areas
2. Overview of construction projects
p>
①Construction scale
Project name, construction nature, factory location, product output, investment profit and tax recovery period, floor area and land utilization, floor plan, number of employees and labor productivity . If it is an expansion or reconstruction project, the original scale should be stated.
②Introduction to the production process
Different types of construction projects (including factories, mines, railways, ports, hydropower projects, water conservancy and irrigation projects, etc.) have different production processes. For industrial production projects:
a. Give the production process flow chart of each product (raw materials → products)
b. The pollutants discharged and their quantities
< p> c. The nature of the processing, important chemical reaction formulas should be listedd. Explain the advancement of the production process
e. Expansion and reconstruction project, analyze the original process and pollutants Prevention and control measures
③Raw materials, fuel and water consumption
List in the table: raw materials, fuel (coal, oil) composition and percentage, dosage
Water consumption (year, month, day, hour), including fresh water supply and circulating water
It is best to have a material balance diagram and a water balance diagram
④ Pollutant emissions
The quantity, discharge method and discharge destination of the "three wastes" (water, gas and slag).
Radioactive materials: type, dose, source, destination
Equipment noise source: noise power level
Vibration source: vibration level reconstruction and expansion project: before and after listing Pollutant emission inventory.
⑤Environmental protection measures taken
Treatment plan, process flow, main equipment, treatment effect, whether it meets the standards after treatment, investment and operating costs.
Comprehensive utilization, disposal plans and destination of solid waste.
⑥Analysis of environmental factors affecting the project
According to the pollution sources, their discharge conditions, and environmental background conditions, analyze all aspects of the possible impact of pollutants on the environment, and use their main impacts as the basis for environmental impact prediction Main content.
3. Investigation and evaluation of current environmental situation
①Natural environment investigation
a. Topography, landforms, and address overview;
b. Hydrology (distribution of water systems) and hydrogeological conditions
Name, quantity, origin of rivers, rivers, lakes, seas, and reservoirs, and hydrological conditions of the evaluation section.
Rivers and rivers: average annual runoff, average flow, river width, specific drop, curvature coefficient, flat, dry and full flow velocity.
Groundwater: water quality type, burial depth, etc.
c. Meteorology and climate
Climate types and characteristics, temperature, wind speed and direction, precipitation, sunshine, disastrous weather, etc.
d. Soil and crops
p>
Soil: type, species, distribution, fertility characteristics.
Crops: types and distribution of grains, vegetables, and cash crops.
e. Forests, grasslands, aquatic products, wild animals and plants, mineral resources, etc. ②Social environment survey
a. Administrative divisions and population: including population distribution, density, occupational composition, Cultural composition
b. Overview of the distribution of industry, mining and transportation: products, output, output value, profits and taxes, number of employees, etc.
c. Overview of culture and education:
d. Population health and endemic diseases:
e. Attractions: nature reserves, scenic spots, historical sites, hot springs, sanatoriums, important political and cultural facilities
③ Atmospheric environment of the evaluation area Quality status (background) investigation
Monitoring locations, projects, time, instruments, methods, results, and evaluation of air quality status based on monitoring data and results over the years.
④Surface water environment quality status (background) investigation
Monitoring location, project, time, hydrological parameters during sampling, instruments, methods, results
⑤Underground Water quality status (background) survey monitoring location, project, time, results
⑥Soil and crop status (background) survey
About soil: Yes
Soil type , distribution status and land use status. Monitoring location: Monitoring item: Reason for option Sampling method and analysis method:
Monitoring results (list): China only has health standards for arsenic in soil. When evaluating, compare with the background value or pollutant content at control points in similar soils in the province.
About crops: Yes
Main crops, fruit trees and their distribution, collection types and locations for collecting samples
Monitoring items and analysis methods
Monitoring results (list): Comparison with food hygiene standards or the general content of contaminants in similar crops in the control area.
⑦Survey on the current situation (background) of environmental noise
Monitoring location, time, instruments, methods, meteorological conditions, results ⑧Survey on human health and endemic diseases in the evaluation area
Survey area, number of people, gender, age, occupational composition, items, methods, results: retrospective survey of deaths, children's growth and development survey, special survey of endemic diseases, etc. ⑨Investigation on the current situation of pollution and damage to the environment by other social and economic activities
4. Investigation and evaluation of pollution sources
①Estimation of pollution sources in construction projects: Find pollution sources according to the production process, and list them (type, quantity, nature, emission patterns and patterns, emission pathways and destinations) to see if they meet emission standards.
② Investigation and evaluation of pollution sources in the evaluation area: Provide investigation methods, data sources, and evaluation methods.
Give (list) the emission amount, emission concentration, emission mode, emission pathway and destination, and evaluation results of waste gas, waste water, and waste residue → focus on finding the main pollution sources and main pollutants, and drawing the distribution map of pollution sources.
5. Environmental impact prediction and evaluation
Aspects involved: atmosphere, water, noise, ecology, population health, possible impacts on geology, hydrology, and meteorology
< p>6. Feasibility and economic and technical demonstration of environmental protection measures① Air pollution prevention and control (the textbook covers 5 items)
Exhaust gas purification system and dust removal system technology; whether the emission indicators meet the standards ; The feasibility of exhaust gas treatment measures; whether the exhaust pipe meets relevant regulations; recommendations for ② water pollution prevention
Process principles, processes, efficiency, emission indicators; whether the emission indicators meet the standards; the feasibility of wastewater treatment measures, Reliability and advancement; suggestions ③ waste residue treatment and disposal ④ noise
⑤ evaluation and suggestions on greening measures
Greening measures; greening area; greening layout plan; tree species and flowers Reasonability; Suggestions ⑥Environmental monitoring system suggestions
Institutional setup, personnel and instrumentation; Suggestions on site layout and monitoring; Monitoring projects
7. Brief analysis of environmental impact economic gains and losses
p>
Estimation is difficult, and there is no better method. Currently, it is mainly carried out from the following aspects:
① Economic benefits of construction projects
Direct economic benefits (profit and tax) , capital recovery period, loan repayment period) Indirect economic benefits: the economic benefits brought by its products to other sectors of society, environmental protection investment and operating costs
②Environmental benefits of construction projects
Project The construction will worsen the environment and cause economic losses and pollution control fees to agriculture, forestry, animal husbandry and fishery. Environmental protection by-products will benefit the environment.
③The social benefit products of the construction project will meet social needs, promote production and improve people's lives. The progress of the local economy and culture will increase employment opportunities, etc.
Finally, a comprehensive analysis of the social, economic, and environmental benefits will be made, the pros and cons will be weighed, and the feasibility of the construction project will be proposed.
8. Suggestions for implementing environmental monitoring
9. Conclusion
10. Attachments, drawings and references
① Attachment: There are mainly project construction documents and approvals, evaluation outlines and approvals.
② Attached drawings: When there are particularly many drawings and tables, a separate volume of drawings can be compiled. If the absence of a certain drawing causes difficulty in understanding, the drawing should be included in the report and not in the accompanying drawings.
③References: author, document name, publishing unit, edition, publication date, etc. Environmental Assessment Report 2
1. Project Overview
1.1 Proposed Project Overview
Project Name: Jilin Yatai Cement Co., Ltd. increases the use of the fourth-line cement rotary kiln Alternative fuel project;
Construction nature: expansion, comprehensive utilization of resources;
Construction location: Jilin Yatai Cement Co., Ltd. is located in the Shanhe Street Office, Shuangyang District, Changchun City, in the old factory area ( ***The four production lines) are located in Heixiaogang, Dingzi Village, Yangquan, the new factory area for the fifth and sixth production lines is located in Wujia Village, and this project is located in the old factory area
Construction unit: Jilin Yatai Cement Co., Ltd.; < /p>
Total project investment: No new investment is required;
Total project duration: There is no civil engineering work in this project and no additional equipment is required. Operation can begin after the expansion project is put into production and this project report is approved.
Project land area: no new land area will be added. Use the original sealed storage room and material receiving bin. The closed storage room occupies an area of ??30m2 and has a volume of 250m3. The material receiving bin occupies an area of ??8m2 and has a volume of 10m3.
1.2 Construction Scale
The annual operating hours of this project have increased from 1500h to 4500h, and the usage of alternative fuel has increased from 7500t/a to 22500t/a. The hourly usage remains unchanged at 5t/h.
2. Engineering analysis
2.1 Main production process flow
2.2 Main production equipment
Storage equipment: 1 airtight storage room ( 250m3, including 5m3 sealed tank), 1 receiving bin (10m3), feeding equipment: 1 plate feeder, 1 set of electric hoist.
The above equipment is all existing equipment, and no new equipment will be added in this project.
Transportation equipment: FAW Transportation Company, a unit with hazardous waste transportation qualifications, is in charge, with 2 sealed special tank trucks (30t/vehicle).
2.3 Sources and types of alternative fuels
For details on the types and quantities of waste used as alternative fuels (EBS) after the expansion of Changchun FAW Integrated Ruimandis Environmental Protection Technology Co., Ltd. 2-1.
2.4 Production and emission of major pollutants
2.4.1 Construction period
There is no civil engineering work and no pollution problems during the construction period.
2.4.2 Operation period
3. Monitoring and evaluation of the current situation of environmental quality
3.1 Monitoring and evaluation of the current situation of atmospheric environmental quality
Project The ambient air quality in the area is good. The daily average concentrations of PM10, TSP, SO2, and NO2 at the five monitoring points in the evaluation area during the non-heating period all meet the requirements of the secondary standards in GB3095-2012 "Ambient Air Quality Standards". The main pollution Everything has a large environmental capacity.
3.2 Monitoring and evaluation of the current status of water environment quality
The water quality condition of the regional surface water body-Diedai River in the flat water period can no longer meet the Class III standards in GB3838-2002 "Surface Water Environmental Quality Standards" Requirements, the main excessive pollutants are COD and BOD5. The inflow of the Duidian River has a certain impact on the water quality of the Yinma River, but the impact is minor.
3.3 Monitoring and evaluation of the current status of acoustic environment quality
4. Environmental impact analysis
4.1 Ambient air impact
4.2 Environmental risk impact< /p>
5. Analysis of environmental protection measures
5.1 Waste gas control measures
The waste gas at the end of the four-line rotary kiln is currently removed by electrostatic precipitator. In order to meet the requirements of HJ662-20XX " According to the relevant requirements in the "Technical Specifications for Environmental Protection of Solid Waste Co-processing in Cement Kilns" and "Emission Standards for Air Pollutants in the Cement Industry" (GB4915-20XX), it is recommended to replace the bag dust collector. The company has included the dust collector update project in the 20XX work The plan is expected to be completed in 20XX.
5.2 Environmental protection measures and suggestions in the transportation of alternative fuels
Although paint slag, the main component of alternative fuels, does not belong to HJ/T169-2004 "Technical Guidelines for Environmental Risk Assessment of Construction Projects" It is a medium-to-highly toxic hazardous substance and a general toxic hazardous substance, and it is also not a flammable or explosive hazardous substance or an explosive hazardous substance. However, granular paint slag is still classified as hazardous waste, so the following suggestions are made:
⑴ Since waste paint slag contains a certain amount of water, it must be pretreated to make it into granular form that can easily replace the coal used for firing. Alternative fuels;
⑵ In order to avoid pollution of the environment due to spillage of alternative fuels during vehicle transportation, leakage prevention measures must be taken for transportation vehicles. It is completely feasible for this project to have two 30t sealed special tank trucks.
⑶ The sealed special tank trucks for alternative fuel transportation in this project should be registered with the Changchun Municipal Environmental Protection Bureau and the Shuangyang District Environmental Protection Bureau.
⑷ If a traffic accident occurs during the transportation of alternative fuels, resulting in the leakage of alternative fuels, in addition to reporting to the traffic department for normal handling, a report should also be made to the Environmental Protection 110 of the Changchun Municipal Environmental Protection Bureau or Shuangyang District Environmental Protection Bureau , take collection measures in a timely manner, and do not allow alternative fuels to be discarded at will.
5.3 Environmental protection measures and suggestions for temporary storage of alternative fuels
Because the main components of alternative fuels - paint slag, etc. are hazardous wastes, they must comply with GB18597-2001 "Storage of Hazardous Wastes" According to the requirements for the storage of hazardous wastes in the Pollution Control Standards, the alternative fuel for this project is granular solid and is not corrosive, reactive or infectious. The following suggestions are made:
⑴ It cannot be left in the open air in the factory area Loading, unloading and stockpiling alternative fuels.
⑵ The alternative fuels of this project are transported directly into the preheater workshop by tanker trucks, and a sealed storage room (250m3), sealed tank packaging and material receiving bin are set up in the workshop to avoid the loss of alternative fuels. , in line with the standard requirements, therefore, it is feasible to use existing storage measures
6. Comprehensive analysis of project environmental feasibility
6.1 Environmental sensitivity analysis
6.2 Analysis of compliance with industrial policies
6.3 Analysis of compliance with urban planning along the route
7. Analysis of environmental economic gains and losses
It can be seen from the analysis of environmental economic benefits that The use of alternative fuels and raw materials can reduce the impact of waste on the environment, safely handle hazardous waste, reduce CO2 emissions, reduce waste disposal costs, and save costs for the cement industry. It has good environmental benefits, social benefits and economic benefits, and the comprehensive benefits are significant.
8. Public participation
This time, 30 public questionnaires were distributed and all were recycled. During the two public announcements of this project and during the public participation survey, neither the construction unit nor the evaluation unit received any objections, indicating that the project has good public recognition.
9. Preliminary conclusions of the environmental impact assessment
It is in line with the national industrial policy and the relevant requirements of my country’s cleaner production, especially in line with the national strategy of circular economy developed by our country. It has good public recognition and meets the total quantity control requirements.
To sum up, from the perspective of environmental protection, this project is feasible and the site selection is reasonable. Environmental Assessment Report 3
1.1. Planning background and work introduction
XX Industrial Park in XX City was established in 20xx with the approval of the Provincial Township Enterprise Bureau, the Provincial Department of Construction, and the Provincial Department of Land and Resources. In 20XX, there were only twelve companies in operation in 7XX City, with a total agreed investment of 2.812 billion yuan.
1.2. Planning Overview
Planning guiding ideology: Based on the town system planning, based on "sustainable development", combined with the characteristics of the park, giving full play to resource advantages, and paying attention to ecology environment, determine reasonable capacity and development intensity. Create a good park environment to achieve a high degree of unity in economic, social and environmental benefits.
Service area, market trading area, industrial area, centralized storage area.
The land composition and layout of XX Industrial Park are shown in the table below.
Based on the needs of active development and the current conditions, make arrangements for short-term and long-term construction projects, and plan to divide into built-up areas and the first and second phases of construction.
⑴Built-up area: At present, the construction of the park mainly relies on both sides of XX Road. Nine companies, mainly XX Steel and Yuancheng Steel, have been completed and put into operation. The completed companies should strictly follow relevant specifications. , regulations, and gradually improve and meet standards.
⑵ Phase I: According to the existing conditions of the park, select areas with good infrastructure and development conditions, mainly relying on both sides of XX Avenue and Nandai Highway, and arrange for those who are interested in or are about to settle in line with the nature of the land. The project quickly formed a park scale, and the rural residential areas within the project land were relocated and resettled.
Phase II: According to the spatial development sequence determined by the park, improve the road network and municipal infrastructure construction of the park, accelerate the relocation of the remaining rural residential areas in the park, strengthen the ecological environment construction of the park, and complete the planning area various development goals.
The plan also includes: land use sub-layout planning; comprehensive pipeline planning (water supply pipes, rainwater pipes, sewage pipes, power lines, integrated telecommunications lines and gas pipes, etc.); special project planning (water supply and drainage engineering planning , electric power, telecommunications engineering planning, gas engineering planning, green space system and landscape planning, environmental protection measures and comprehensive disaster prevention planning, etc.).
1.3. Analysis of the planning’s compliance and favorable factors
The compliance of the planning with the municipal and district “master plans” reflects the following aspects:
(1) Compliance with “
⑵ In line with Hubei Province’s policy of promoting the construction of characteristic industrial parks and the “1+8” Wuhan City Circle plan;
>⑶ Comply with the relevant requirements of the industrial policy of the Hubei Provincial Metallurgical Industry Authority and the "Industrial Development Plan Outline for the Comprehensive Supporting Experimental Zone for "Two-Oriented" Social Construction in Wuhan City Circle" and the "Guidance Catalog for Promoting Reasonable Industrial Transfer in Wuhan City Circle";
(4) It is in line with the relevant policies of XX City and the development strategy of industrial clusters in XX City Park.
⑸Resource advantages
1.4. Analysis of the constraints and disadvantages of relevant plans on this plan
⑸The total amount is tight and the environmental capacity is insufficient.
The planning area is located in the crosswind direction of the dominant wind direction in the town. The urban atmospheric SO2 still has a certain environmental capacity, but the total amount needs to be controlled; PM10 has shown a gradual upward trend in recent years, exceeding the national ambient air quality Secondary standards. The distance between the planning area and the town area is 2.5 degrees of suitability, and adverse impacts can be mitigated through scale control and rational layout.
Constraints of existing water environment capacity. Lake XX, the final receiving water body for industrial park sewage, currently cannot fully meet Class III water requirements. Due to the constraints of environmental capacity, although part of the pollution load can be reduced through the construction of sewage treatment plants, the total amount of pollutant discharge in the park is still subject to certain restrictions;
1.5. Identification of planned environmental impacts
Land acquisition, relocation and resettlement: water environment, solid waste, ecological environment;
Introduction of special steel mold and equipment manufacturing projects: air, soil, water resources, public safety, ecology;
Public and municipal facilities: sludge and electromagnetic radiation;
Road construction: ambient air, sound environment, water environment, ecological environment;
Construction: water Pollution, air pollution, noise pollution, solid waste, ecological environment, social economy;
1.6. Current status of environmental quality in the planning area
Atmospheric environment:
Project The environmental quality functional zoning category of the location belongs to the "Class II area", and the GB3095-1996 "Ambient Air Quality Standard" and the modified single and second-level standards should be implemented.
- Related articles
- On Thailand's Permanent Residence Visa (Green Card)
- What's the name of Chaplin's silent film?
- How many Ukrainian immigrants are there?
- Liu is a writer.
- Wellington detailed travel guide
- Introduction of funny characters
- Wufeng town ancient site
- Ding Shizhong resume
- Economic Development of Jiangnan Town
- Immigration and Citizenship Act