Job Recruitment Website - Ranking of immigration countries - Yantai Laolan Reservoir
Yantai Laolan Reservoir
Open up the Laolan Reservoir, a large water source, and speed up the commissioning and operation of the Yellow River Diversion Project.
Laolan Reservoir is an important controlled water source and flood control project in Waijia River Basin, and it is the only large-scale standby water source to be developed in urban areas. The main task this year is to actively strive for the inclusion of Laolan Reservoir in the national and provincial "Twelfth Five-Year Plan"; Organize the design unit to complete the preparation of project proposal and immigration planning outline; Assist the Municipal Development and Reform Commission, and strive for the approval of the National Development and Reform Commission on the project proposal. Strive to complete the project approval before the end of the year.
Accelerate the commissioning and operation of the Yellow River Diversion Project to ensure that the Yellow River water is transferred as planned. Do a good job in the comprehensive improvement of the river environment along the water conveyance from Anli Reservoir to menlou reservoir, and ensure that the water supply arteries are smooth, clean and environmentally friendly.
Ensure urban water supply safety, flood control safety and water ecological safety. According to the engineering layout of upper storage and lower drainage, the construction of tidal dike at the estuary of Zhifu District was completed within this year, and the construction of Huili section of Waijiahe River and Tongqiao section of Waijiahe River to Hongqi West Road started.
Focusing on the water sources of Dagujia River, Xin 'anjiang River, Yuniao River and Qinshui River, and taking small watersheds as a unit, we will do a good job in the construction of vegetation greening and channel storage projects to control soil erosion and ensure water quality safety. Further strengthen the supervision and detection of key water functional areas, timely release early warning information, and build a well-regulated water ecological protection system.
The establishment of water supply security system in Shuang Yuan can also ensure the safety of water supply under drought conditions.
During the "Twelfth Five-Year Plan" period, Yantai will focus on water transfer from Jiaodong, rational development and optimal allocation of local water resources, and build a water supply security system in Shuang Yuan that integrates urban and rural areas.
Complete the construction of Jiaodong water transfer trunk line project and implement the continuous supporting project; Laolan Reservoir Project started construction; Taking Jiaodong water transfer trunk line as a link, the four major water sources, namely, the city gatehouse, Gaoling, Laolan Reservoir and Dagujia River, are connected to establish an integrated urban water supply network with dual water sources. Continue to promote rural drinking water safety; Strengthen the construction of backup water sources for urban water supply and rural centralized water supply, and carry out the construction of rivers, underground reservoirs and recharge sources. The water supply capacity of the city's water source projects increased by 300 million cubic meters, and the total water supply capacity reached 65.438+0.4 billion cubic meters, effectively ensuring the rational water demand in urban and rural areas.
Comprehensive management of 40 important sections of 20 key small and medium-sized rivers in the city; Complete large and medium-sized reservoirs 10, 275 small dangerous reservoirs and 30 large and medium-sized dangerous sluices; Accelerate the construction of coastal dampproof dikes; Carry out the prevention and control of geological disasters such as mountain torrents, and obviously improve the ability of water conservancy projects to resist natural disasters such as floods, droughts and storm surges.
Daxing irrigation and water conservancy construction, and strive to meet the conditions of the five counties and cities included in the national small-scale irrigation and water conservancy key county construction. The comprehensive control area of soil erosion is 540 square kilometers; Ecological construction of water systems such as Dagujia River has been carried out, and the water environment of ecologically fragile areas and key rivers and reservoirs has been significantly improved.
Strengthen water administrative law enforcement, and increase the crackdown and punishment of water violations. Do a good job in building information systems such as flood control and drought relief command and decision-making and water resources management. (Bai Xiaojuan)
- Previous article:Who can tell me the connection between each of Jin Yong's works?
- Next article:Is it easy to immigrate to Brazil?
- Related articles
- Analysis on Master of Accountancy from Australian National University
- Interstellar migration giant spacecraft
- What happened to Lu, who had beaten Huang?
- What about professional athletes? American visa
- How to write meeting minutes
- Immigrants from xiongjiashan
- Which school should I choose to study in Australia?
- What are the legal provisions of corruption?
- Which restaurant in Hangzhou has the best cuisine?
- What conditions do I need to meet to apply for TOEFL and IELTS?