Ask for the detailed list and address of each hydropower station in Hubei Province, and say as much as you know.
First, Qingjiang River
Yaojiaping Hydropower Station is located in Tunbao Township, Enshi City, 38 kilometers away from Enshi City. The installed capacity is 240 MW.
Longwangtang Hydropower Station, 27km away from Enshi, with installed capacity of 13750kW.
Malong Power Station, Jiangjundong Power Station and Yujiahe Power Station.
Okawabe Hydropower Station, Xuezhaohe Hydropower Station and Sanduxia Hydropower Station belong to Guodian Hui Neng Power Generation Co., Ltd., Dalongtan Hydropower Station belongs to China Huaneng Group, and others belong to Enshi Electric Power Company.
The downstream of Qingjiang River 1 10 km Gaobazhou Power Station, Geheyan Power Station and Shuibuya Power Station were cut off. There are Sanduxia, Xuezhaohe, Okawabe, Tianloudi Town, Longwangtang, Dalongtan and Hongmiao power stations in the upper and middle reaches.
Second, the tributary Mashui River (alias Pengjiahe)
Xiaoxikou Hydropower Station is located in Huaitan Village, Lisan Township, 8 kilometers east of Jianshi County.
Laodukou Hydropower Station is located in Shashi Township, Enshi City, 7.5km away from Mashui Estuary, a tributary of the left bank of Qingjiang River, and the dam site is about 50km away from Enshi City. The normal water level of the reservoir is 480.0 meters, the maximum storage capacity is 220.4 cubic meters, and the total installed capacity of the power station is 2×4.5 MW.
Taiyanghe Hydropower Station is 45 kilometers away from Enshi City, with an installed capacity of 24MW.
The tributary Zhaolai River (alias Zhaolai River and Ganping River)
The designed installed capacity of Zhaolaihe Hydropower Station is 3× 65438+200,000 kilowatts.
Three, the tributary Yesanhe (including its tributary branch well river)
Huapinghe hydropower station is located on the branch well river, the first-class tributary of Yesanhe River in Qingjiang River system, Dazhiping Town, Badong County. The installed capacity of Huapinghe Hydropower Station is 30,000 kilowatts, the normal water level of the reservoir is 670 meters, and the maximum dam height is 97 meters.
Yesanhe Hydropower Station in Mazaping Gorge, Gaoping Town, Jianshi County, with an installed capacity of 2×25MW and a total installed capacity of 50,000 kilowatts.
- Previous article:Archaeology of Cultural Relics in Wanggedu Reservoir
- Next article:In which city is Sanxiushan Village located?
- Related articles
- Historical Evolution of Dongtou District
- What are the advantages of Seychelles company?
- The difficult process of the formation of socialism
- How long will it take to complete the tax refund process in Singapore?
- Where is the former site of the security revolution?
- What are the ways to immigrate to Japan?
- What are the Latin American countries?
- Immigrated to party member and the United States.
- How do Chinese Americans find jobs in the economic crisis?
- Seek the latest list of survey and design enterprises and real estate enterprises in Shenzhen.