Guofa No.201629 proposed how to cancel the safety pre-evaluation and approval of construction projects. Is it possible to cancel the pre-evaluation?

It depends.

First, if there is no legal and regulatory basis and it is not included in the catalogue of administrative examination and approval items decided by the State Council, the examination and approval shall be cancelled.

Second, although there are laws and regulations, there is no need to keep them. We should cancel the examination and approval by amending the laws.

Third, all matters that can be solved by the examination and approval authorities through soliciting opinions from relevant departments or through follow-up supervision will be cancelled.

The fourth is to increase the optimization and integration of the examination and approval items that really need to be retained. A number of examination and approval items implemented by the same department, with similar management contents or belonging to the same processing stage shall be integrated into one examination and approval item. We should optimize the matters handled by local governments at the same level through a unified platform to improve efficiency.

Extended data

According to the Measures for the Supervision and Management of Safety Facilities of Construction Projects "Three Simultaneities"

Article 7

In the feasibility study of the following construction projects, production and business units shall conduct safety pre-evaluation in accordance with state regulations:

(1) Non-coal mine construction projects;

(two) the production and storage of dangerous chemicals (including the use of long-distance pipelines to transport dangerous chemicals, the same below) construction projects;

(3) Construction projects for the production and storage of fireworks and firecrackers;

(4) Metal smelting construction projects;

(five) chemical construction projects that use hazardous chemicals for production and the amount of use reaches the specified amount (except for the production of hazardous chemicals, hereinafter referred to as chemical construction projects);

(six) other construction projects stipulated by laws, administrative regulations and the State Council. "

Article 8

The production and business operation entity shall entrust a safety evaluation institution with corresponding qualifications to conduct safety pre-evaluation of its construction projects and prepare a safety pre-evaluation report.

The safety pre-evaluation report of construction projects shall conform to the provisions of national standards or industry standards.

The safety pre-evaluation report of construction projects and chemical construction projects that produce and store hazardous chemicals shall comply with the provisions of the second paragraph of this article and the relevant provisions of hazardous chemicals construction projects.

Article 9

For other construction projects other than those specified in Article 7 of these Measures, the production and business operation entity shall make a comprehensive analysis of the conditions and facilities for safe production and form a written report for future reference.