Job Recruitment Website - Ranking of immigration countries - Brief introduction of Pankou Hydropower Station
Brief introduction of Pankou Hydropower Station
Pankou Hydropower Station is located in Pankou Township, the upper reaches of the main stream of Dujiang River, 3 kilometers away from Zhushan County/Kloc-0, with an installed capacity of 500,000 kilowatts and an annual power generation of 65.438+0.05 billion kWh, which is a large-scale first-class project. The designed dam height of this hydropower station is 1 14m, the dam crest length is 292m, and the normal water level of the reservoir is 355m, so it has annual regulation capacity. Pankou hydropower station adopts concrete face rockfill dam, and the right bank is a three-hole overflow open spillway. The left bank consists of a ground workshop and a switching station, with two generator sets.
- Related articles
- American F4 Family Immigrants How long does it take to immigrate to the United States in June?
- 985 college girl immigrants
- I am a chef, and I am going abroad.
- Knowledge points of American professional immigrants
- Dinosaurs ruled the earth10.6 billion years. How long can humans rule the earth?
- Basic Survey of Tibetan Township in Qiao Qi
- Comprehensive management of small watershed
- Is he a noble surname?
- Can I return to China if I get a green card in the United States?
- Conversion of a5 card to green card was rejected.