Job Recruitment Website - Immigration policy - Middle Route of South-to-North Water Diversion Project (to realize a great country project across the century)

Middle Route of South-to-North Water Diversion Project (to realize a great country project across the century)

The South-to-North Water Diversion Project is one of the largest water conservancy projects in China's history, and it is also a great national project spanning thousands of years. The main purpose of this project is to allocate water resources from the Yangtze River and Pearl River basins to the Yellow River and Haihe River basins through water transfer projects, so as to alleviate the water shortage in the northern region and improve the water resources utilization rate in the southern region.

Overview of road map of South-to-North Water Transfer Project

The road map of South-to-North Water Transfer Project is an important part of South-to-North Water Transfer Project, which involves the planning, design, construction and operation of the whole project. The road map of the South-to-North Water Transfer Project mainly includes three lines: the middle line, the east line and the west line.

The central line is the main line of the South-to-North Water Diversion Project, starting from Yangzhou, Jiangsu, crossing Henan, Shandong, Hebei and other provinces to the north, and finally reaching Beijing. The total length of the central line is about 1432 km, of which the Yangtze River to Huaihe River project is about 677 km, and the Hanjiang River to Weihe River project is about 755 km.

The East Line is the first branch of the South-to-North Water Transfer Project. It starts from Huai 'an, Jiangsu, goes north through Shandong, Hebei and other provinces, and finally reaches Tianjin. The total length of the East Line is about1.420km, of which the Yangtze River to Huaihe River Project is about1.115km, and the Yellow River to Huaihe River Project is about 305km.

The West Line is the second branch of the South-to-North Water Transfer Project. It starts from Guangyuan City, Sichuan Province, goes north through Shaanxi, Gansu, Ningxia and other provinces, and finally reaches Beijing. The total length of the western line is about1.432km, of which the Yangtze River to Huaihe River project is about1.1/5 km, and the Hanjiang River to Weihe River project is about 3 17 km.

Operation steps of road map of South-to-North Water Transfer Project

The operation steps of the road map of South-to-North Water Transfer Project mainly include planning, design, construction and operation. Among them, planning and design is the preliminary work of the road map of South-to-North Water Transfer Project, and construction and operation is the later work of the road map of South-to-North Water Transfer Project.

In the planning stage, it is necessary to conduct a comprehensive investigation and analysis of the South-to-North Water Diversion Project, determine the basic parameters such as lines, stations and quantities, and formulate the overall planning scheme of the South-to-North Water Diversion Roadmap.

In the design stage, detailed design is needed, including hydraulic engineering design, civil engineering design, electromechanical engineering design, etc. And formulate a detailed design scheme for the road map of the South-to-North Water Transfer Project.

In the construction stage, it is necessary to carry out the actual construction work of the South-to-North Water Transfer Project, including survey, design, construction and supervision, to ensure the construction quality and progress of the road map of the South-to-North Water Transfer Project.

In the operation stage, the South-to-North Water Transfer Project needs daily maintenance and management to ensure the normal operation and safe use of the South-to-North Water Transfer Road Map.

final result

The South-to-North Water Transfer Project is a great project in the history of our country, and the road map of the South-to-North Water Transfer Project is an important part of the project. Through the implementation of the road map of the South-to-North Water Transfer Project, the water resources in the northern region have been effectively utilized, and the water resources in the southern region have been better protected and utilized. The successful implementation of the road map of South-to-North Water Transfer Project not only has an important impact on China's economic development and social progress, but also provides important experience and reference for the development of water conservancy projects in the world.