How much does it cost to apply for the construction qualification of water conservancy and hydropower projects?
2. Personnel certificate fee:
3. Personnel performance expenses:
Note: registered civil (water conservancy and hydropower) planning major, registered civil (water conservancy and hydropower) structure major and registered civil (water conservancy and hydropower) geology major. Registered civil (water conservancy and hydropower) soil and water conservation major or immigration major has not started to register; Change to the corresponding senior engineer and then start registration. Registered civil (water conservancy and hydropower) planning major: registered civil (water conservancy and hydropower) structure major is replaced by senior engineer of water conservancy and hydropower. Registered civil (water conservancy and hydropower) geological professional electrical engineering geological senior engineer changed to, registered civil (water conservancy and hydropower) soil and water conservation professional soil and water conservation senior engineer changed to.
To sum up, the total cost = qualification agency fee+personnel fee+performance fee = 307,000 yuan (in words: three hundred and seven thousand yuan only). The actual fluctuation of the market is subject to the current market.
process cycle
The processing period of design qualification is generally 5 to 8 months, mainly depending on the batch (four batches of design qualification a year, one approval time).
Generally in March, June 9.65438+February),
Payment type/method
Expenses. 1. Personnel expenses: within 3 days after signing the contract, half of the personnel expenses shall be paid as the down payment, and the rest shall be paid together. 2. Pay 40% qualification application fee (qualification agency fee+personnel performance fee) within 3 days after signing the contract. 3. After the application materials are completed and submitted for trial, the construction department will pay 40% of the registration fee on the day when the receipt is accepted. 4. Pay 20% of the registration fee within 3 days after online publicity.
Procedure:
1. Find the required personnel, register with the registered engineer, and obtain the registration certificate and seal;
2, personnel in place, began to organize materials, material list is as follows:
(1), Application Form for Qualification of Engineering Survey and Engineering Design Enterprises in quadruplicate and corresponding electronic documents (including basic information table of enterprises);
(2) A copy of the business license of the enterprise as a legal person;
(3) A copy of the articles of association;
(4), the legal representative of the enterprise * * * copy and enterprise technical director or chief engineer * * Ming, office documents,
* * * Copies of books, titles and certificates, Basic Love Brothers and Performance Table of Professional and Technical Personnel;
(5) A copy of the registered practitioners listed in the application form and a copy of the registration certificate stamped with the practicing seal.
(Newly-approved enterprises need to provide the registration change form or initial registration form stamped by the provincial registration administration department at the place where the enterprise is registered);
(6), professional and technical personnel qualification standard * * * Ming title certificate, * * * volume, "professional technology.
The basic information and performance table of the personnel, the labor contract signed with the enterprise according to law, and a copy of the social security certificate for the past month (the certificate of dissolution of the labor contract with the original employer provided by the newly approved enterprise);
(7), the office property certificate or office lease contract for more than years;
(8), enterprise performance certification materials, including any one of the project completion, project handover, project trial operation, project completion acceptance certification documents-a copy of relevant information (provided by the enterprise applying for upgrading and continuation);
(9), enterprise technical equipment qualification requirements should provide shopping * * * (3 copies for enterprises applying for engineering survey qualification. The enterprise shall * * handle the social security expenses of the personnel required for qualification at its own expense;
3. Personnel social security expenses required for the enterprise to bid for the qualification at its own expense;
4, submitted to the Provincial Planning Commission or the construction department of foreign service window to review the original, submit materials;
5. Approval of relevant departments;
6, publicity, licensing
7. Service commitment: the qualified agent did not fully return the declaration fee.
8. Our advantage: do or do well. Profession+integrity+100% success. 9. Remarks: This quotation scheme is for reference only and is subject to the written contract!
- Previous article:Allusions related to Zhu Yuanzhang
- Next article:Shapodang's gratitude and resentment
- Related articles
- Will you go to jail for embezzling 2000 yuan?
- Are there any interesting stand-alone games?
- Where is the Chengdu residence permit integral public service platform?
- Can Wenzhou Hui Medical Insurance be renewed?
- The history, present situation and geographical features of Taiwan Province Province.
- Barbecue composition
- Bazhou investment immigrants
- Only child and non-independence
- Why can't the giant battlefield territory move to the city?
- Reasons for the topic of immigrant composition