Job Recruitment Website - Immigration policy - Project fund application report
Project fund application report
In today's society, more and more people are exposed to and use reports. Usually, the content of the report is very large and the length is very long. So what kind of report is effective? The following is a sample report on project fund application compiled by me, which is for your reference only and I hope it will help you.
Project Fund Application Report 1 I. Overview
(a) an overview of the application project
Including the existing core technology, main contents, innovation points, technical level, main uses and application scope in agricultural production (limited to 200 words. If the applicant agrees to disclose the "X" information, the content should be the part that can be disclosed).
(II) Expected objectives of the project (the indicators in this column are the main contents of signing the contract after the project is established, and also the main basis for project acceptance)
1. Overall objective: including the planned investment amount during the project implementation period (referring to the funding period for the transformation of agricultural scientific and technological achievements); Maturity of the results achieved at the completion of the project, main technical and performance indicators achieved at the end of the project implementation (to be described by quantitative data), quality standards implemented, licensing certification of relevant national industries and quality certification system passed by enterprises, etc. ; The economic, social and ecological benefits that can be obtained after the transformation.
2. Stage objectives: (The completion of stage objectives is an important basis for the follow-up fund allocation of the project) The specific objectives to be achieved in each stage during and at the end of the project implementation, including progress indicators, technical engineering indicators, capital implementation, production and construction, sales revenue realization, demonstration scale, etc. The objectives of each stage should be described in detail and can be evaluated qualitatively and quantitatively. When completing the stage objectives, the indicators should be consistent with the "technical and quality indicators" in the "overall objectives" clause.
3. Capital investment and use plan: including the planned investment amount during the project implementation period, including the investment amount already put in place and the proposed new investment amount; The list shows the time and amount of new investment funds completed by the unit during the project implementation.
Second, the advanced analysis of the technical achievements of the project
(1) Introduction
Briefly describe the development status, main problems and recent development trend of the specific agricultural production fields involved in this project at home and abroad. After transforming the technical achievements of this project, use similar technologies and products at home and abroad for quality control to overcome the main problems existing in production.
Can be quantitatively compared, and describe the main changes of technical and economic indicators before and after the implementation of the project (can be explained in tabular form).
(B) Project innovation
This paper discusses the innovation of the project, including technological innovation, product structure innovation, production process innovation, major changes in product performance and use effect, etc. The applicant shall explain the innovation point, innovation scope and innovation difficulty of this project in as much detail as possible without revealing business secrets, and attach recent novelty retrieval reports, test reports, experimental reports or other supporting materials that can explain the technical level of the project, and may attach photos of existing samples.
(iii) Status of intellectual property rights
Describe in detail the technical sources and cooperative units of the project; Explain the ownership of the intellectual property rights of the project, especially the intellectual property rights of the core technologies. Cooperative transformation, entrusted transformation of scientific and technological achievements, as well as the purchase of scientific and technological achievements, should be accompanied by relevant cooperative transformation agreements and results transfer instructions; The results of retransformation of imported technology need to explain the main contents of retransformation and provide corresponding technical data; The results of independent transformation of units need to provide corresponding technical data or technical appraisal reports.
Third, the project implementation plan analysis
(1) Discussion on the content and technical route of the project transformation.
Explain in detail the specific contents of the intermediate test, technical assembly, matching, integration or productive test demonstration of this project, as well as the technical route and technical scheme adopted.
(2) Project organization and implementation plan
Explain the specific location and scale of intermediate test or productive test demonstration of this project; Specific tasks and division of labor undertaken by each participating unit (relevant cooperation agreements are required); This paper discusses the sources and supply channels of equipment, raw and auxiliary materials needed to carry out this project, the existing conditions of project construction and the proposed new capital construction content; Briefly describe the situation of "three wastes" in the transformation process and the treatment measures and schemes; If it is a technical achievement that needs to be approved by the competent department of the industry, indicate whether it has been approved or licensed. If not, please describe the current application, approval progress and when it is expected to be obtained.
Project fund application report II. Necessity of project construction
1. 1 Basic information of the project unit
(omitted)
1.2 biomass energy utilization of the project unit
Henan Huaiyang Ganyuanmu Industrial and Commercial Co., Ltd. has a biogas project for wastewater treatment. The biogas project has built two 1000m3 anaerobic fermentors and 800m3 gas holders with an annual output of more than 700,000m3. Biogas utilization is mainly used for internal heating of cattle farms, and centralized gas supply is implemented for some farmers around.
1.3 the necessity of biogas power generation
Vigorously developing circular economy, reflected in the agricultural level, is to engage in circular ecological agriculture. Biogas engineering is an important link in the industrial chain of agricultural development circular economy, which plays an extremely important role in its upstream and downstream products.
The construction of biogas project will comprehensively utilize and effectively treat the waste and wastewater generated by livestock and poultry breeding, recycle resources and energy, and organically combine pollution control, environmental purification, energy recovery, comprehensive utilization and improvement of ecological environment, which will greatly reduce the impact on the environment. There are a lot of livestock manure in the farm, which can provide sufficient raw materials for large-scale biogas projects, realize the development of "energy ecology" and "energy environmental protection", and use biogas generated in the process of wastewater treatment to generate electricity and reuse, which can effectively reduce the construction cost and operation cost. Biogas power generation not only has good economic benefits, but also has extensive social benefits.
Second, the technical route and foundation
technical justification
Technical characteristics of gas generator set:
(1) Automatic air-fuel ratio adjustment technology: For biogas, the composition is unstable. Therefore, it is necessary to control the air-fuel ratio of the engine in real time with an electronically controlled mixer. EGS gas controller of Woodward Company of America is adopted. The engine automatically approaches the combustion condition in real time, and the central control unit sends an instruction to change the air intake, thus achieving the purpose of automatically adjusting the mixing ratio. So that that air combustion of the engine is alway kept in an ideal state. The whole adjustment process is automatic. When the concentration of CH4 in biogas changes, the unit without automatic air-fuel ratio adjustment technology cannot generate electricity normally, which is characterized by unstable operation, low power and poor power quality.
(2) Low-pressure air intake technology: In view of the low biogas pressure in the anaerobic treatment process, the unit designed by the company has low requirements for biogas pressure, and the use conditions can be met as long as the biogas pressure reaches more than 300mmH2O, and there is no need to increase the pressurization device, thus reducing the investment. Units that do not adopt this technology need booster devices, which increases investment, increases fault points and consumes electricity.
(3) Lean burn technology: By reasonably matching the gas distribution system and adopting the new concept combustion chamber technology and cylinder temperature control technology with independent intellectual property rights, lean burn is realized, the heat load is reduced, the adaptability and thermal efficiency of the unit to gas are improved, and its power and reliability are greatly improved. The unit without this technology is very sensitive to the humidity of gas, which is characterized by difficult ignition or discontinuous ignition.
(4) Combustion control technology: Through this technology, the cylinder humidity of the unit can be controlled below 420C, the heat load is obviously reduced, and the operation reliability of the unit is obviously improved, especially the function of avoiding knocking. For the unit without this technology, the operation state of the unit is generally adjusted by human senses and experience. When the unit is running, the cylinder temperature will exceed 5000C, and the life of its key components will be greatly reduced, especially the life of the cylinder head and other components can not meet the requirements of long-term operation of the unit. If there is no such control, once knocking happens, it may lead to the melting of the piston of the machine and cause a major mechanical accident.
(5) Adopt chemical anti-corrosion technology: improve the wear resistance and high-temperature mechanical properties of cylinder liner, valve seat ring, valve and piston ring, and carry out chemical anti-corrosion treatment on all pipe fittings from gas treatment filter to upper cavity of intercooler. After taking these technical measures, the anti-corrosion ability of the unit has been effectively enhanced, and the service life of the components has been significantly improved.
3 Shexian Bureau of Commerce and Finance Bureau project funds application report:
Shexian county has a long history of planting mulberry and raising silkworms, the geographical climate is suitable for silkworm rearing, and the natural and socio-economic conditions are also very suitable for vigorously developing cocoon and silk industry. Cocoon silk is one of the leading industries of agricultural industrialization in Shexian county, and has initially formed a cocoon silk industrialization pattern such as seed production, mulberry planting and sericulture, cocoon harvesting and cocoon drying, reeling, silk weaving, silk weaving and silk making. There are 23,000 sericulture farmers in 28 townships in the county, with nearly 80,000 silkworm eggs and more than 3,300 tons of fresh cocoons. There are 6 silk reeling enterprises, with the total number of employees 1000, and the annual silk reeling capacity is 500 tons. At present, there are 5 silk-making enterprises with nearly 600 employees, with an annual production capacity of 3.5 million meters. Since the Eleventh Five-Year Plan, Shexian has adhered to the industrialization process of "leading enterprises+professional cooperatives+farmers", supported new and old silk enterprises to carry out technological transformation, and promoted the benign adjustment of cocoon and silk structure. The county's cocoon and silk industry continues to develop, achieving the first cocoon output, the second reeling ability and the first weaving ability in the province. In order to meet the needs of structural adjustment and industrial development of cocoon and silk industry in the county, Huangshan Lantian Fiona Fang Industrial Co., Ltd. decided to carry out a comprehensive electric control technical transformation of the company's existing K274 loom to improve labor production efficiency, product quality and overall competitiveness of the enterprise.
I. Basic information of the project organizer
Huangshan Lantian Fiona Fang Industrial Co., Ltd. is located in Shen Du Town, Shexian County, Huangshan City, with a registered capital of 2.08 million yuan. The company, formerly known as Xin 'an Silk Factory, was invested by East China Hydropower Bureau and Shexian Relocation Committee in 20xx 1000 million yuan, making it the largest silk enterprise in Huangshan City. 20xx65438+February, the state-owned assets were restructured, and Xin 'an Silk Factory became a private enterprise through auction. The company covers an area of more than 20 mu, with a workshop area of 9,000 square meters and a green area of 4,000 square meters. It has more than 0/00 employees/kloc-and more than 80 spinning machines, with an annual output of silk products 1 10,000 meters and tens of thousands of silk quilts, with a total output value of more than 20xx. It is a leading enterprise in the silk industry in Huangshan City.
The company has always adhered to the development of local sericulture and silk industry as the leading factor, explored the establishment of an industrialized business model of "company+base+farmers", tried out the product development model combining Industry-University-Research, fully implemented the plan of "enriching the people with 100,000 people", registered trademark names such as "100,000 people", "Wang Yi" and "Saijinsi", and made a name for itself by relying on the powerful tourism effect of Xin 'anjiang Landscape Gallery.
At present, enterprises have basically formed a one-stop production and management system of mulberry planting and sericulture cooperatives, cocoon harvesting and drying, silk processing, silk weaving, clothing, bedding and so on. The annual sales of the enterprise is nearly 20xx million yuan, which increases the annual per capita income of farmers in silkworm areas by more than 654.38+million yuan.
Second, the main content of the project construction
At present, the company's main equipment is K274 silk loom, which is a traditional loom operated by shuttle loom in 1990s. Although the quality of silk weaving is recognized, it is more difficult to operate than rapier loom. In order to ensure quality, improve efficiency and save cost, the company cooperated with a company in Hangzhou, Zhejiang Province to develop the electronic control technology of K274 silk loom. This technology is now mature. At present, the existing 80 K274 silk looms and 20 newly purchased ones in the power weaving workshop of the company are reformed by electric control technology, so as to ensure the smooth production of silk and cotton crease-resistant fabrics, make the luxury quality affordable and effectively improve the production and social benefits of enterprises.
The electrical control technical transformation project of K274 silk loom does not change the original production process and flow of K274 silk loom, but adds electrical control facilities to the original equipment, which improves the production performance and control level.
Third, the project construction investment budget
The total investment budget of the project is 9.5 million yuan, and the main projects are as follows:
1, 20 newly purchased K274 silk looms, each of which is 60,000 yuan, accounting for 1.2 million yuan.
2. The electric control equipment of 100 looms (80 existing looms and 20 newly purchased looms) has been reformed, each of which costs 42,000 yuan, and the investment in technical transformation is 4.2 million yuan.
3. The existing 6000 square meters old factory building needs 3.5 million yuan for moisturizing and constant temperature transformation.
4. Other expenses are 600,000 yuan.
Four, the amount of funds to apply for subsidies
This technical transformation project can promote the optimization and upgrading of cocoon and silk industry, which is in line with the direction of industrial structure adjustment. Project undertakers can actively fulfill their social responsibilities, strive to cultivate local sericulture bases, actively maintain market order, popularize advanced sericulture technology, and establish a good industrial development mechanism.
We hereby apply for a subsidy of 500,000 yuan for technical transformation projects.
Hereby report
xx
Xxxx,xxxx,xx,xx
4 Changzhi County Finance Bureau project funds application report:
The Yinhe Agricultural Planting Farm in Changzhi County is located in the well head of the township head and Beixianquan Village, with a planned project area of 65,438 0.47 square kilometers. The plantation plans to build a sustainable agricultural industrialization circular economy project, focusing on the integration of urban and rural areas such as green seedling base, high-quality dry and fresh fruit planting demonstration, characteristic breeding demonstration, facility agriculture, agricultural holiday and leisure sightseeing, and comprehensive energy development and utilization. The plan will be completed in three to five years. The construction of the project will be characterized by efficient use of resources and environmental friendliness, with the goal of green, ecological and sustainable development of circular agriculture industry projects. The construction of the project will also connect the first, second and third industrial chains, which will play a good leading role in building a harmonious agricultural ecosystem, promoting the development of regional agricultural industrialization, increasing farmers' income and building a new socialist countryside, and has far-reaching social significance.
In this year's irrigation and water conservancy construction, professional planting farms have transferred 2,200 mu of land in Changjingtou, Beixianquan and Shuiquanzhuang villages by means of land contractual management right transfer, built 2 new reservoirs, laid 4,000 meters of water diversion pipes, built 0/00 solar greenhouses/kloc, and built more than 8,000 meters of supporting pipe networks. The new drilling depth reaches 380 meters. Up to now, the total investment of the project has reached more than 5 million yuan, and the company has raised funds by itself.
Hereby ask for instructions
Applicant:
Date:
5 Municipal Development and Reform Commission project fund application report:
Xx Town, Bai Di Town, jinqiao town Town, Taihetang Town and Huangtupu Town in our county are important towns in the central and western part of Qidong County. There are Chinese and western bands, fishing drum singing teams, waist drum performance teams and flower drum troupe under the jurisdiction of the five township cultural stations. There are many literary and artistic professionals and a good foundation for the development of cultural undertakings. Due to insufficient investment in cultural infrastructure, lack of cultural communication platform and lack of standardized fixed performance venues, it is urgent to build a comprehensive cultural station.
A, the basic scheme of the project construction
(omitted)
Second, the preparation of project construction funds
The total investment of each project is 240,000 yuan, of which 6,543,800 yuan+6,000 yuan is applied for the special fund for the construction of the Central Cultural Station, and 80,000 yuan is raised by various cultural stations and subordinate literary and art groups. Now all the 80 thousand yuan has been put in place and deposited in the local credit cooperative or agricultural bank. As long as the central special funds are in place, the project can be implemented smoothly.
Third, the benefit analysis after the completion of the project
After the completion of the 1. project, the cultural infrastructure has been improved, which can promote the development of local characteristic culture and promote multicultural exchange.
2. Promote the realization of the goal of a well-off society in rural areas, build a harmonious society and meet the growing cultural needs of farmers.
3, is conducive to the management of the cultural market, promote the construction of spiritual civilization, put an end to and prevent the spread of pornography, gambling and drugs.
4. It is conducive to the prosperity of the cultural market and the realization of the purpose of fostering and prospering literature with literature. No, please reply.
Xx county bureau of culture
Xx,xx,XX,XX
6. Jiangxi Provincial Immigration Office Project Fund Application Report:
Tangjia Village Group of Wuxi Village Committee in Dianxia Town, Zhangshu City is located in a remote mountainous area at the junction of Zhangshu City and Xingan County, which is 5 km away from the market town128 with a population of *** 128. In 19xx, due to the construction of the cold reservoir, the villagers of this village group moved from their original residence to their current addresses. Now they live in a hollow land surrounded by mountains on three sides. The mountains are circuitous and the traffic is blocked. The only village road connected with the outside world is pitted and muddy when it rains, which seriously affects the production and life of local people. In order to solve the problem of difficult travel in the whole village, after collective discussion by the villagers' group, it was decided that the villagers would raise funds to build a cement road into the village. However, due to the long highway mileage of 1.5 km, the public's financing is very limited, and the village collective financial resources are also very weak, so it is unable to afford such a large sum of money. Even with the corresponding financial support at the town level, there is still a considerable funding gap. Therefore, the road construction plan was once put on hold. In order to fulfill the long-cherished wish of several generations in the village and completely solve the problem of people's travel difficulties, Dianxia Town People's Government of Zhangshu City hereby applies to the Provincial Immigration Office, and implores the leaders of the Provincial Immigration Office to help solve the problem of hardening the roads into the village with funds of 300,000 yuan. I hope the leaders will approve it!
I hereby report it.
Applicant:
Date of application:
Project fund application report 7 Dear leaders,
Hello!
My name is xx, male, xx, born in February, 1986. Id number: 533xxxxxxxxxx. Who lives in Guancun Farmers' Cooperative, Zhanxi Town, Yingjiang County. The climate in my hometown is very good, with four seasons like spring. Surrounded by mountains, there are large areas of sugar cane and forests, rich in water resources and good vegetation, which is a good place for buffalo breeding. According to the national spirit of encouraging farmers to start businesses, I built a cowshed in March of 20xx, covering an area of more than 300 square meters (asbestos tile roof, steel frame house), and planned to keep 40 buffaloes in captivity. After the site was built, I looked for cows everywhere, and now I have bought 15 buffaloes (including cowshed, spent 15000). I wanted to add more cows, but due to financial problems, one side of the cowshed was still idle.
Recently, the village and relevant leaders came to my house to publicize the spirit of the state supporting farmers' entrepreneurship and carefully explain the economic benefits and prospects of rural breeding. This made me see hope and strengthen my confidence, so I decided to apply for a buffalo breeding project.
Development idea: expand the existing site and dig a small pool next to the site. Using our own 5 acres of contracted land to plant pasture, saving breeding costs and improving economic benefits. The initial capital is about 300,000 yuan. I'm going to mobilize my family to participate in cattle management. Young people are willing to learn, dare to challenge and know how to drive, which provides a guarantee for the technology of raising cattle and the transportation of forage.
I hope that through my own efforts, I can make some contributions to the local economy, to the development of rural areas, and to make a difference in rural aquaculture. However, the road of farmers' entrepreneurship is very difficult, and entrepreneurship is our common wish. However, due to my poverty and financial difficulties, some of my previous investments were borrowed from friends, which really limited my tolerance. It is heartbreaking that this project is difficult to be put into practice due to lack of funds. Therefore, I specially applied to leaders at all levels and government departments: I hope to get technical and financial approval and help, and give economic support of 60,000 to 80,000 yuan. I sincerely hope that the leaders can set up a project to solve it. Thank you very much Hereby apply!
so far
Applicant: xxx
Xx,xx,XX,XX
8 xx Municipal Water Conservancy Bureau Project Fund Application Report:
Our village, xx Town, xx City, is located in Taiyuan District in the north of the city, with an existing population of xx people and an area of xx mu. There are xx villagers' groups and xx households. The main cash crops are cotton, wheat, corn and asparagus. The main source of villagers' income is crop income.
For many years, due to poor water conservancy conditions, it is difficult to irrigate wells normally, which leads to the stagnation of agricultural production and the low income of villagers. Although our xx village is the seat of xx town, the village collective economy is still very poor, and the villagers' income is very small. The existing mechanical wells in the village are far from meeting the irrigation needs of crops. Coupled with frequent local droughts, the situation of water conservancy irrigation is even worse, which brings huge losses to villagers and serious waste of water resources. The majority of villagers strongly hope to completely change this situation as soon as possible, change production and living conditions, fundamentally get rid of poverty, embark on a well-off road as soon as possible, and solve the difficulties of agricultural irrigation as soon as possible. In order to fundamentally change this situation, increase farmers' income and solidly promote the construction of new countryside. According to the suggestion of relevant experts, we plan to build a water-saving park in our village to effectively improve the irrigation conditions of agricultural production in our village.
The water-saving park project we implemented covers an area of xxx mu. According to the accounting of relevant technical personnel, it needs xxx yuan per mu, and the total amount of funds required is more than xx yuan. At present, it is difficult for some villagers to raise funds, and there are still vacancies of more than xx yuan. Therefore, please ask the superior leaders to understand and give appropriate support. Thank you again for your great concern and support for our xx village. Please indicate whether to approve the employment.
I am here to convey
Salute!
Applicant: xxx
Xx,xx,XX,XX
Project fund application report 9 Fund application report is a kind of report issued by project investors to obtain special government fund support. Government financial support includes investment subsidies, incentives, lending and loan interest subsidies, and the government only examines and approves fund application reports. It is generally necessary to entrust a unit with engineering consulting qualification to write a fund application report.
Government financial support includes investment subsidies, incentives, loans and loan interest subsidies. The government only examines and approves the fund application report and decides whether to give financial support. Specific approval authority and usage are as follows:
(1) application report for government-funded projects
(a) industrialization projects that can promote scientific and technological progress and industrialization of high and new technologies and have an important driving and guiding role in economic restructuring;
(b) Comprehensive agricultural development projects to finance agricultural development;
(c) Technology-based venture capital projects;
(d) Government-supported venture capital projects for SMEs;
(e) Venture capital projects encouraged by the government;
(f) Scientific research and development projects of an operational nature;
(seven) energy transportation, agriculture, forestry, water conservancy, municipal engineering and other public welfare and public infrastructure investment projects encouraged by the state;
(h) Investment projects to protect and improve the ecological environment;
(a) investment projects to promote economic and social development in underdeveloped areas;
Other projects that meet the relevant provisions of the state.
(2) application report for discount interest fund projects
Financial discount funds are mainly used in economic and social fields where the market cannot effectively allocate resources and needs government support, mainly including:
(a) public welfare and public infrastructure investment projects;
(b) Investment projects to protect and improve the ecological environment;
(c) Investment projects to promote economic and social development in underdeveloped areas;
(d) Investment projects to promote scientific and technological progress and high-tech industrialization;
(five) other projects that meet the relevant provisions of the state.
;
- Previous article:Introduction to matters needing attention in studying in Singapore
- Next article:When is the best travel time in Jiayuguan?
- Related articles
- Where is high-speed railway station near Lu Guan Reservoir?
- Is environmental engineering an immigration major in Australia?
- How to judge tax residents and non-tax residents after immigrating to Canada
- Overseas Chinese immigrant fraud
- The interstellar robot told several lies.
- From May 1, Dongguan can apply for passports from different places.
- What advantages do European and American countries have in China?
- Do you need a medical examination to study in Australia? What are the good majors in Australia?
- Does anyone know this Korean drama?
- What do you think of Musk's immigration to Mars?