Job Recruitment Website - Immigration policy - Want to know: Where is the Liujiaping Hydropower Station in Huaihua City?

Want to know: Where is the Liujiaping Hydropower Station in Huaihua City?

Liujiaping Hydropower Station is located in Baiping Village, Gezhuping Township, Longtan District, Xupu County. It is the leading power station in the cascade development of the Jinma River Basin. It has a total designed installed capacity of 16,500 kilowatts and an average annual power generation of 54 million kilowatt hours. Liujiaping Hydropower Station broke ground in September 1984, and three 5,500-kilowatt main units were put into operation on December 26, 1987, January 15, 1988, and October 5, 1989. The project has completed 629,000 cubic meters of earth and stone, with a total investment of 31 million yuan. 410 households were resettled, and the submerged area was 3,747 acres. Liujiaping Hydropower Station is a frequency-regulated power station with a reservoir located at the junction of Longzhuangwan Township, Longtan District, Xupu County and Longping Township, Longhui County. The main dam is a masonry gravity dam with a dam crest width of 5.5 meters, a dam bottom width of 33 meters, a dam height of 41.5 meters, and a dam crest axis length of 175 meters. The total water storage capacity is 33.28 million cubic meters, and the effective power generation storage capacity is 32.44 million cubic meters. The auxiliary dam is an earth-rock dam with a top width of 4 meters, a bottom width of 107.7 meters, an axial length of 223.5 meters at the top, and a maximum dam height of 19 meters. The total length of the aqueduct is 2,360 meters (including 4 tunnels with a total length of 477.5 meters and 5 aqueducts with a total length of 214 meters), a maximum water head of 507 meters, and a maximum working pressure of 61.533 KG/cm2.