Job Recruitment Website - Immigration policy - Traffic in Chenggu County

Traffic in Chenggu County

Yang' an Railway starts from Ningqiang Yangpingguan Station in the west and ends at Ankang East Station in the east, connecting Bao (Ji), Cheng (Du) and Xiang (Fan), Chongqing, with a total length of 357 kilometers. It runs through Hanzhong and Ankang nine counties and cities. The route from 65438 to 0969 was set by the First Survey and Design Institute of the Ministry of Railways, constructed by the First Engineering Bureau of the Ministry of Railways, and undertaken by the militia divisions of Hanzhong and Ankang counties. /kloc-0 was fully completed in September, 1976 and handed over to Ankang Branch of Zhengzhou Railway Bureau for management and operation. It is the second electrified railway in China. The county boundary section is 26 kilometers, with three stations: Zhijiang, Chenggu and Wudamen.

Zhiyang Railway is a special line of China Shaanxi Aircraft Manufacturing Company. The total length is 2 1km, connecting Yang 'an Line to Zhijiang Station in the south, and passing through the ancient city, Wu Qu Temple, Chen Jiaying, Wen Chuan Town, Zhujiakan and other villages and towns. 197065438+February197365438+1October, with an investment of 8.86 million yuan, which was managed and maintained by Shaanxi Aircraft.

Chenggu North Station is the station of Xicheng High-speed Railway in Chenggu County, Hanzhong City. It was officially started on 20 121October 27th. The station is located in Huangjia Village, Wulangmiao Township, Chenggu County, about 5 kilometers away from the county seat. After two years of hard work, the Chenggu county government finally let Xicheng high-speed railway set up a station in Chenggu, which was really hard-won. The establishment of Chenggu North Station will promote the integration of Chenggu into Chengdu-Chongqing-An economic circle. After completion, the time from Chenggu to Xi and Chengdu by train will be shortened to 1 hour and 2 hours respectively. According to the practice of high-speed railway station construction, the station will start construction one year before the opening of Xicheng high-speed railway. Therefore, it is estimated that the construction of Chenggu North Station will start at the end of 20 16, and it will be put into use simultaneously with Xicheng High-speed Railway 20 1 1 in 2007. Chenggu Airport, located in Liulin Town, is a civil airport. It was officially opened to traffic on August 14, 2004. It is designed to reach the goal of 300,000 passengers and cargo and mail throughput 1300 tons in 2020. The runway is 2500 meters long and 45 meters wide, and the flight area is 4C, which can take off and land Boeing 737, Airbus A320 and other aircraft. Execute Hanzhong -Xi 'an, Hanzhong-Beijing (via Xi 'an-Xianyang International Airport), Hanzhong-Shenzhen, Hanzhong-Shanghai and other flights.

Flight schedule of Hanzhong Chenggu airport

1. Hanzhong -Xi 'an Airlines flight number and model take off and arrive at China Eastern Airlines Hanzhong -Xi 'Mu An 2218a320/kloc-0: 23456707: 2008: 00 China Eastern Airlines Xi 'an-Hanzhong MU2217a32012008. The flight number and model of the airline take off on time and arrive at China Eastern Airlines Hanzhong-Beijing MU2218A320123456707: 2010: 55 China Eastern Airlines Beijing-Hanzhong MU2217A3201234567/KLOC. Take off and arrive at China Southern Airlines Hanzhong-Shenzhen cz3676A3202 3202,4,720: 2022: 45 China Southern Airlines Shenzhen-Hanzhong CZ 3675A 3202,4,717: 2519: 254. Hanzhong-Shanghai Pudong flight number model takes off and arrives at Jixiang Airlines Hanzhong-Shanghai Pudong HO. 720: 5022: 55 Jixiang Airlines Shanghai Pudong-Hanzhong HO102/KLOC-0, 47 17:2020: 10.