Preparation before subgrade excavation construction?
1 survey lofting
Construction restoration alignment survey and construction lofting are the main technical work in the construction preparation stage. The contractor shall carry out retest according to the design drawings, coordinates of traverse points and elevation of leveling points provided by the supervision engineer in writing, and submit the retest data to the supervision engineer for review after closing. The contractor shall pay off the construction according to the pay-off data approved by the supervision engineer. According to the specification, before subgrade construction, the center line piles, boundary piles for subgrade land, cutting slopes, side ditches, borrow pits, berms, spoil piles, etc. Should be in accordance with the design drawings, construction technology and the relevant provisions of the recovery. The straight-line part of the road centerline pile is set every 20m, and the permanent fixed pile is set every 100m. The starting point, ending point, circular slow point and circular slow point of the curve are set with fixed piles. After measuring the centerline pile, measure the cross section, and then set out the side pile according to the subgrade cross section and the measured elevation. At the top of the slope in the excavation section, the side piles in the excavation section are generally set at a certain distance from the side piles to prevent the side piles from being lost and recovered in time.
2 Review and test before construction
Before subgrade construction, the constructors should make a detailed investigation on the geological and hydrological conditions of the subgrade engineering scope, determine its nature and scope through sampling tests, and understand the treatment methods of special soil by existing buildings nearby. We should master the degree of weathering and cracking, bedding, joints and schistosity of rock strata in rock areas, and pay special attention to faults and geological changes in areas prone to collapse.
Geotechnical test sampling should generally be based on the data provided by design documents, and each soil type should be sampled in not less than three groups; There are also geotechnical engineering routines or tests based on pile number sampling. According to Technical Specification for Highway Subgrade Construction (JTJ033-95), the test method of soil used as filler in excavation and borrow yard should be handled according to Standard for Highway Geotechnical Test (JTJ05 1-93).
3. Excavation of drainage facilities in front of the cutting
Because water is the main cause of cutting diseases, no matter what kind of excavation method is adopted, effective drainage should be ensured during excavation and after completion.
(1) Do a good job of intercepting ditch before cutting excavation, and build temporary drainage ditch when excavating in layers.
(2) Temporary drainage facilities should be combined with permanent drainage facilities, and running water should not be discharged into farmland and cultivated land, polluting natural water sources or causing siltation and erosion.
(3) During cutting construction, attention should be paid to maintaining drainage channels frequently to ensure smooth running water. Drainage ditches in permeable soil or rapids should be reinforced to prevent leakage and erosion. In areas with poor hydrogeological conditions, drainage at the top of cutting must be strictly done.
(4) Take away all the surface water and groundwater that may affect the slope stability, and keep a certain longitudinal slope (one-way or two-way) along the cutting line to facilitate drainage.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:How about the class outside the county of Yu Ming High School in Jinzhou?
- Next article:How about Longyan Huaxia Eye Hospital Co., Ltd.?
- Related articles
- Why do adult dolls sell at such a high price? What is it made of?
- What about Xi Anrunhua Technology Co., Ltd.?
- 2007 Teachers' Job Fair
- How many Da Vinci robots are there in Jiangxi Province?
- How to test the flight attendants of Xi 'an subway?
- Why is Hangzhou Yuan Tiao more expensive than Huafeng?
- 202 1 Announcement on the post of Dean of Medical Community Branch of Jiangshan People's Hospital in Quzhou City, Zhejiang Province
- Where can I change down jackets in Nanchang?
- Changqing latest recruitment information network
- Is the drawing process management calculation or drawing calculation?