What are the construction methods for the integral installation of steel structure grid engineering?
Multi-machine lifting method
This method is used for small and medium-sized grid structures with small height and weight.
Pull-out lifting method
At present, the installation of large-scale spherical joint steel tube space truss in China is mostly carried out by pulling rod method. In this method, the grid is assembled on the ground first, and then the grid is hoisted to the top of the column with multiple single-leg tie rods, displaced in the air and installed in place.
Electric spiral lifting method
The electric spiral lifting method is similar to the flat lifting method, and the assembled steel grid structure on the ground is lifted to the design elevation by using the electric spiral elevator used in the flat lifting engineering construction. The advantage of this method is that it does not need large lifting equipment and the construction is simple. If you encounter problems in the installation or production of grid engineering, you'd better consult an experienced steel structure engineering company, especially a professional company for grid engineering construction. Hunan Yinhe steel structure specialty can provide you with detailed services by doing this kind of steel structure engineering.
- Related articles
- Which is better for teacher recruitment in China or Shanxiang?
- Is there a liar in Lily Net?
- What should a website designer have?
- Hunan Huaihua Vocational College came to our school to recruit seamen, should I go?
- Is Changchun FAW Fu Wei Johnson easy to enter?
- Retirement age of flexible employees in ziyang
- How about Enshi Barenju Hotel Management Co., Ltd.
- How many passenger platforms are there in Dong 'e?
- Urumqi Bayi Middle School and No. 11 Middle School
- How many kilometers is it from England to Suining?