Construction technology of spherical grid structure in steel structure building?
A, pay-off, line inspection
1. Column top setting-out and line inspection: mark the axis and elevation, check the column top displacement, and re-verify the provided position, size and elevation before the grid installation unit can formally install the grid support point.
2. The ground installation environment of the grid should be laid flat, and each fulcrum of the grid ball should be paid off, indicating the position and the number of balls.
3. Brick piers are each fulcrum of the grid ball. The pier material can be a steel pipe support point, or a brick pier with a small circular tube as a grid bottom chord ball bearing.
4. Mark the elevation of each fulcrum. If the grid has bulging requirements, it should be reflected in each support point, and the bulging requirements of the grid should be completed with supporting steel pipes with different heights.
Second, the steel grid plane installation
1. ball release: put the qualified solder balls into the installation node according to the specifications and quantity, and adjust the stress direction and position of the solder balls. Generally, the circumferential weld of the horizontal center line of the ball is placed in the equatorial direction. The rib is in the upper half of the lower chord ball.
2. Laying rebar: Before arranging the prepared rebar according to the specified specifications, check the specifications and dimensions of rebar and the gap between the groove and the weld. Put the stick between the two balls, adjust the gap and fix it.
3. The plane grid should be assembled from the center line and gradually spread around. First, a closed square grid should be formed. After controlling the size, we should constantly assemble and expand the surrounding grids. Attention should be paid to controlling the cumulative error, and the general grid should have negative tolerance.
4. Plane grid welding. Before welding, the welding process and network connection sequence should be compiled to prevent the plane grid from deforming.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:What is the best major?
- Next article:How to file a complaint against a real estate agency in Tonglu
- Related articles
- What if the sofa is broken? How to fix it if it is broken?
- In Nanyang, where is a good place to learn from chefs?
- Why is it called International Da Puning?
- What is the enrollment rate of Jiujiang Bilingual Experimental School?
- Which province and city is Meishan village located in?
- Is Ji 'an Economic Development Zone Private Financing Registration Service Center Co., Ltd. reliable?
- Excuse me, are the special post teachers and civil servants in Jilin Province allowed junior students to apply for the exam? Teacher qualification certificate and Putonghua certificate have not been i
- /kloc-how much is the subsidy of 0/0 billion?
- What communities are there within the jurisdiction of Beichen Road Office in Zhangbei County, Zhangjiakou City?
- Gonggong recruitment