In study, work and life, the frequency of job responsibilities is increasing gradually, and job responsibilities refer to the work content that a post needs to complete and the scope of responsibilities that it should undertake. How should we formulate job responsibilities? The following is the job responsibilities of the builder that I compiled for you (5 general articles), for reference only. Let's take a look.
Job responsibilities of the builder 1
Job responsibilities of the builder
1. Work under the leadership of the project manager, implement the policy of safety first and prevention first, do well the safety precautions according to the regulations, implement the safety work, ensure that safety must be emphasized in terms of efficiency, and pay attention to safety first in production.
second, be familiar with the construction drawings carefully, prepare various construction organization design schemes and construction safety, quality and technical schemes, and prepare the progress plans of individual projects, manpower and material resources plans and plans for machines, tools and equipment.
III. Compile and organize the staff to hold meetings and study on schedule, arrange reasonably, guide scientifically and successfully complete all construction tasks of this project.
iv. prepare the implementation plan of civilized construction site, and arrange, implement and create civilized construction site according to the site plan of the project construction site.
5. Prepare the total project schedule and monthly schedule and the monthly schedule of each construction team.
VI. Urge the construction materials and equipment to enter the site on time and be in a qualified state to ensure the smooth progress of the project.
VII. Organize the acceptance of concealed works and participate in the quality evaluation of partial projects.
Responsibilities of Safety Officer
1. Conscientiously implement the national and superior guidelines, policies and regulations on production safety. Resolutely carry out the construction according to the technical specifications, and take the safety production management as the primary responsibility.
Second, carefully plan the construction organization. In the organization plan, we must seriously consider the construction safety precautions, and use systems and rules to clarify the safety responsibilities, so that the project can be organized as planned.
3. Pay attention to inspection, supervision and technical disclosure during construction, and do not engage in blind and unprepared construction. Find hidden dangers and correct them in time.
4. Pay attention to workers' safety education, and conduct safety study regularly or irregularly.
5. Seriously accept the inspection and guidance of the higher authorities and put forward rectification opinions. Pay attention to safety in everything and always pay attention to safety. Report problems in time and deal with them in time.
six, Responsible for the safety induction training for the operating personnel of this unit
Documentary's job responsibilities
1. Under the leadership of the project manager, be fully responsible for the management of technical data and engineering files of the project engineering department
2. Be responsible for collecting and sorting out the technical data and engineering files of the construction unit in strict accordance with Hefei's construction engineering data management regulations
3. Conduct regular construction engineering data of supervision units, construction units and subcontractors. Irregular inspection and supervision to ensure the truthfulness, integrity, completeness and effectiveness of the construction project files
4. Conduct internal file management within the department according to the company's management norms, and register, collect, sort out, count, archive, keep, inquire and hand over the files
5. Abide by the company's confidentiality system and not cause damage, loss or disclosure of files; Do not provide or copy files without authorization to ensure the confidentiality and safety of files
VI. Strictly regulate the management of drawings to ensure that the receipt, distribution, storage and use of drawings meet the requirements
VII. Complete other tasks assigned by the engineering manager
Responsibilities of materials personnel
I. Bulk materials for the project, such as steel bars, cement, wood, templates, steel pipes and bulk consumables, are supplied by the company.
second, master the master plan, monthly and weekly plans of this project, and prepare the supply plan of engineering materials.
3. Be familiar with the project progress and market conditions, purchase as planned, and meet the quality progress requirements.
fourth, master the performance and quality requirements of materials, and provide the certificate of approval to technicians according to the inspection lot.
5. The materials that need to be rechecked shall be rechecked according to the inspection lot, and the recheck sheet shall be given to the technician.
VI. Grasp the inventory of materials and adjust the material supply plan in time.
7. The purchased materials that do not meet the requirements shall not be used in the project, and shall be settled through negotiation.
VIII. Supervise the use of materials, stop the waste and damage of materials in time, and punish the relevant personnel.
Responsibilities of Budget Officer
1. Under the leadership of the project manager, be fully responsible for the project budget (settlement) of the construction project, handle and complete the budget (settlement) in time and be responsible to the project manager.
2. Attend the blue prints.the design, design disclosure and pre-budget (final) review meeting, and cooperate to solve the problems in pre-budget (final) according to relevant documents.
iii. Earnestly implement the Company's management measures for construction drawing budget (settlement) and bidding and quotation.
iv. timely and accurately grasp the quantities (not included in the budget and not covered by the contract) generated by design changes in the construction process, and provide settlement adjustment data for the project.
5. Problems found in the pre-calculation (final calculation) related to the construction drawings shall be reported to the technical director in time.
Responsibilities of Project Manager
1. Conscientiously implement the Party's and the State's guidelines, policies and technical standards and specifications on quality, environment, occupational health and safety.
second, organize the formulation of the unit project quality, civilization, environment/occupational health and safety production guarantee measures, and be responsible for organizing the implementation and inspection.
iii. establish and build the quality, civilization, environment/occupational health and safety production guarantee system of this project, and actively carry out quality, environment/occupational health and safety production work.
iv. be responsible for cooperating with relevant departments to conduct on-the-job training for operators of this unit.
5. In case of quality, environment/occupational health and safety accidents in our unit, we should go to the site to organize rescue, analyze the causes of the accidents, report to the Quality and Safety Department in time, and participate in the investigation and handling of the accidents.
VI. Responsible for reporting the technical data of quality, environment/occupational health and safety specified in this project.
VII. Organize technical disclosure and education on quality, civilization, environment/occupational health and level 3 safety of this project, and strengthen inspection.
VIII. Carry out various environmental/occupational health and safety activities to enhance employees' safety awareness and improve their safety technology and enthusiasm; Carry out quality and technical education to improve the construction technology and skills of employees.
IX. Strengthen the inspection and management of quality, civilization, environment/occupational health and safety in production of this unit and project subcontractors.
Job responsibilities of technical director
1. Conduct project design disclosure and blue prints.the design of the unit; Presided over the preparation of construction organization design, construction scheme and operation design, presided over the preparation of the quality plan of this project, and was responsible for technical disclosure to project management personnel.
2. preside over the formulation of safety technical measures, guide project managers to implement construction organization design and various technical measures, and guide the project to carry out QC group activities.
3. Go deep into the construction site, find and solve all kinds of problems existing in the construction in time, and preside over the measurement, test and measurement of the management project.
iv. guide and supervise the technical, quality and safety inspection of each construction team, organize the acceptance of concealed works and partial works, and participate in the evaluation of unit project quality.
5. Be responsible for the technical data and information management of the project, and take charge of sorting out and filing the completed archives.
VI. Handling project design changes, technical verification and on-site visa claims.
VII. Supervise and report the statements of all departments of the company.
job responsibilities of quality inspector
1. Conscientiously implement the national, provincial and municipal quality policies, procedures, standards and relevant regulations and requirements for strengthening quality management.
2. Responsible for the quality supervision, inspection and acceptance of the project.
3. Quality inspection and acceptance shall be carried out for divisions and subdivisional works of each type of work. Deal with problems found in time and strictly control the quality of the project.
iv. supervise and inspect each team to do self-inspection, mutual inspection and handover inspection, and check the quality inspection records and quality analysis meeting records of the construction team at any time.
5. collect the engineering quality inspection data of each team in time as the basis for completion acceptance.
six, timely reflect the construction quality problems, and have the right to stop work and rework illegal operations.
Responsibilities of hydropower builder
1. Responsible for the inspection and acceptance of important parts and concealed works in the process of hydropower construction: ensure that the water circuit is safe and practical, with protective measures and reasonable design; .
second, check the implementation of hydropower construction process: the installation process of water supply and drainage pipelines must meet the requirements of installation quality acceptance. The construction technology of strong and weak current system requires to meet the electrical process flow.
3. report the quality, progress and safety problems found in the construction to the person in charge of the engineering department or the company in time, and do not delay, conceal or deal with them without authorization.
iv. visas for concealed works and design changes should be signed fairly, justly and openly in line with construction specifications, contract requirements, relevant documents and the rights and interests of both parties.
five, responsible for coordinating the convergence of various disciplines and the construction of outsourcing units and supporting departments.
VI. Manage and collect the signatures of water and electricity concealed engineering data, and submit them to the documenter for filing in time. Responsibilities of the builder 2
1. Responsible for coordinating the construction progress, quality and safety of the service layer. Implement the overall construction plan.
2. assess and evaluate the labor service layer.
3. Supervise the construction of the service layer according to the specifications to ensure safe production and civilized construction.
4. Put forward measures to ensure construction, safety and quality and organize their implementation.
5. urge the construction materials and equipment to enter the site on time and be in a qualified state to ensure the smooth progress of the project.
6. Take part in the project completion inspection and be responsible for the intact protection of the project.
7. accurately record the construction log on time.
8. Reasonably allocate production factors and strictly organize construction to ensure the progress and quality of the project.
9. Organize the acceptance of concealed works and participate in the quality evaluation of partial projects.
1. Participate in the blue prints.the design and the preparation of the project schedule. Job responsibilities of the builder 3
1. Responsible for hydropower construction management of indoor hardcover projects (with certain operational ability,.
2. Ensure the quality of hydropower project and manage the orderly construction of the project;
3. Control the cost as planned and optimize the construction scheme;
4. Be responsible for the measurement of hydropower projects and the calculation of materials, and be responsible for the calculation results.
5. Be responsible for planning, purchasing and managing materials for building hydropower projects.
6. Be responsible for the tracking of embedded parts of house construction hydropower project, quality management of construction, and partial quality acceptance.
7. Be responsible for the handover inspection of the hydropower project construction and other processes.
8. Fulfill the temporary tasks assigned by the project manager. Responsibilities of the builder 4
1. Under the guidance of the project leader, be responsible for the construction organization and management within the scope of work undertaken.
2. Be familiar with the design drawings, participate in the design technical disclosure and the blue prints.the design, keep records of the disclosure and blue prints.the design, check and urge the construction team to carry out the construction work according to the requirements of technical disclosure at all levels.
3. Participate in writing the construction organization design and the construction scheme of partial projects.
iv. participate in the survey, positioning, setting-out, measurement and technical review of this project, and make relevant records.
5. Strictly implement the construction specifications and acceptance criteria, and guide each professional team to carry out the construction according to the drawing design requirements.
VI. Do a good job in safe production and civilized construction on the construction site, and be responsible for inspection, rectification and implementation of hidden dangers and problems existing on the site.
VII. Be responsible for the engineering technical file, the preparation of various technical data, the visa work, and timely submit the relevant visas and records to the librarians for collection, sorting and summary.
8. Participate in the inspection of partial project acceptance and project completion acceptance, and prepare relevant materials for acceptance.
9. Record the project construction diary carefully, and timely sort out the technical data and completion acceptance data of the project.
1. Participate in the investigation and handling of safety accidents, do a good job in statistics, analysis and reporting of work-related injuries (traffic accidents), put forward measures to prevent accidents together with relevant personnel, and supervise and inspect their implementation. Job responsibilities of the builder 5
1. Be familiar with the construction drawings, carry out construction strictly according to the drawings, and carry out construction technical disclosure and safety technical disclosure before the construction of each working procedure.
2. All kinds of raw materials shall not be used without acceptance, and shall not be used without quality assurance certificate, certificate of approval and test report.
3. Carefully organize and implement the construction plan according to the project node objectives and construction progress plan.
4. Strictly implement the system of quality self-inspection, mutual inspection and handover inspection, and timely carry out project self-inspection and hidden inspection, and urge relevant personnel to do a good job in quality evaluation of partial projects.
5. After each working procedure is completed, it shall be accepted by the team first, and then it shall be reported to the supervisor for acceptance after the re-inspection by the full-time quality engineer, before entering the next working procedure.
6. If quality or safety problems are found during construction, report them to the project manager immediately, and don't make their own decisions.
7. Don't direct operations against regulations during construction.
8. Design and construct in strict accordance with the technical regulations for construction operation and the approved construction organization, and the construction quality meets the inspection and evaluation standards.
9. Strengthen site construction management and do a good job in safe and civilized construction.
1. insist on sorting and summarizing the technical data and acceptance data.
11. Obey other work arranged by the company and the project manager. ;
- Previous article:Which department is in charge of the illegal decoration of shops in Nanchang Xiangjiang Building Materials Market?
- Next article:What is a fire electrician? What is the difference with ordinary electricians? What do they do? What kind of electrician is most needed in today's society?
- Related articles
- How many interns does Chifeng City Hospital need?
- The Food Safety Supervision Office of Public Institutions, the recruitment position category is management, and there is no restriction on majors to apply for. DoesnĄ¯t it mean that there is no need to
- Why does ODA Seiki not recruit people? It is rumored that it may go bankrupt. Is it true?/You don't say.
- Is Guangzhou Huangpu nucleic acid suspended?
- Sino-Japanese Dragon-How about Shenzhen Shajing Sino-Japanese Dragon Electric Appliance Factory?
- What is a non-woven bag?
- It's been two weeks since I submitted my resume. Do I have to wait?
- How about Jingmen Dong Bin Machinery Manufacturing Co., Ltd.?
- How was the teacher recruitment interview in Ji 'an, Jiangxi?
- 20 19 Announcement on Transfer of Institutions Affiliated to Tangshan Health and Wellness Committee of Hebei Province