Job Recruitment Website - Job seeking and recruitment - Model essay on summary of weak current personal work

Model essay on summary of weak current personal work

Sometimes, only a few people are full of ideas about writing personal work summary, but the articles we can learn from can be completely different. Then, what personal work summary can be used as our reference, and what places need priority? After searching and sorting out, I put forward a summary essay on weak current personal work for your reference only. Let's have a look!

Model essay on personal work in weak current 1 I have joined the platform of Yang Shun for many years 1. In this 1 year, I have experienced a lot, learned a lot, grown a lot, and certainly gained a lot. Before joining the platform in Yang Shun, although I was also engaged in weak current project management, most of them were small and single projects, which were far less dynamic than those provided by Yang Shunping Platform, and the returns from growing up in Yang Shunping Platform were even less. Once again, I sincerely thank Yang Shunping for giving me such an opportunity to gain and grow.

In August, 20xx, I joined Yang Shunping Platform with infinite expectation. After experiencing corporate culture training and professional knowledge training, I officially started my work in the engineering department. Fortunately, soon after I joined Yang Shunping Platform, the company trusted me and put me in charge of this big project in the north of Nanchong. This is a major breakthrough in project management and the project that I have the most contact with the system. No matter the scale of the project or the complexity of the system, I feel great pressure. After taking this project with surprise and anxiety, I consulted many old colleagues and found a lot of information. Under the guidance of General Manager Gao and Manager Chen, during the implementation of this project, from the initial difficulties to the smooth progress in the later period, it played a very important role in my growth. At the beginning, the difficulties of the general contractor and the strict requirements of the owners almost made me retreat. However, under the guidance of Mr. Gao and Manager Chen, and with the close cooperation of sales Zhang Zhu, I gradually got the approval of the general contractor and the owner. Under my careful control of the project, in the face of the quality project made by the workers, the relationship between the parties is getting more and more harmonious. In the later equipment installation and debugging, the owner provided us with considerable convenience, and it is true. Through the successful completion of this project and the acceptance of provincial units, I understand many problems. The first is the importance of the platform. A good platform will give me more room for growth, stimulate my personal potential faster and let me grow up quickly. Secondly, the importance of teamwork. No matter how good my personal ability is, there will always be insurmountable obstacles without the cooperation of colleagues and teams. When I meet this insurmountable hurdle, the strength of my colleagues and team can help me cross this hurdle smoothly and quickly and reach a new height. Third, the importance of communication. No matter how many difficulties there are, proper communication will surely find a solution. Communication can turn doubt into understanding, and communication can turn strangeness into familiarity until it develops into friendliness. The coordination work must be smooth sailing in a friendly state.

Think of the truth understood after the implementation of Nanchong Chengbei project, and put it into the implementation of Mianyang Tongli project again. Although I have done due diligence in this project and used the knowledge I have learned before, many problems have been exposed, including insufficient communication skills, unreasonable project cost control and inadequate project quality control. After these problems were exposed, the company leaders talked to me in time. And gave me a lot of very useful advice. In the following period of time, I made up my mind to solve these problems. Through the project cooperation with my colleagues, I learned the advantages of all my colleagues in the engineering department. At the same time, I also applied for the second-level constructor qualification certificate. Although I didn't pass it completely in the end, I will take another professional course next year. However, through the self-study of the relevant knowledge of the second-level constructor, the ability of cost control and quality control of related projects has been greatly improved, and I deeply realized how important cost control and quality control are as a project leader. Quality control is the life of project management, and cost control is the life extension of project management.

In recent months, I have been managed by more people in the process of cooperation with the technical center and communication with the manager and manager Zheng. People are the core of project implementation. People use it well, and project management will naturally be good. In project management, the allocation of human resources and the coordination of interpersonal relationships are inseparable from people's participation. In the management of people, I personally understand "reason" more than "management". I understand that this is only a preliminary idea, and there will definitely be many problems in the implementation process. As for how to implement it, there must be such an opportunity platform to practice and constantly revise and deepen it in the process of practice. Only in the cycle of constantly discovering and solving problems in practice can management be improved first. At the same time, I also urge the leader to give me such a platform and an opportunity to realize myself again under the guidance of the leader.

In the future project management, I will do it under the existing management regulations, and also try to learn from some excellent and reasonable management models. For example, in the management of the construction team, we should, like our current performance appraisal method, convert each index into specific scores according to the number of construction team personnel, the quality structure of personnel, the qualification of the construction team, the payment method of the construction team, and the quotation of the construction team. In this way, we can judge which construction team is more suitable for our company, focus on training this construction team, and even provide necessary technical and technological safety training for their workers, so as to improve work efficiency, improve construction quality and reduce construction costs. The implementation of this plan certainly needs more detailed work and the guidance of superior leaders. In the process of continuous improvement of this scheme, it is believed that more management methods and concepts will emerge, and useful formation materials will be gradually screened out and reported to the leaders.

My name is XXX, and I am a fresh graduate this year. I joined the big family XXX on August 20XX 1. Looking back on my work and life for more than five months, I have learned a lot. At the end of the year, I have learned a lot from five months' work and made arrangements and plans for the next year's work. I have some personal experience. Since I worked, with the help and encouragement of my colleagues in the company, I have gained a lot and learned a lot in my thoughts, studies and work through my own efforts.

I just got out of school. I didn't know anything at first, but I had a lot to learn. I started working in Hangzhou and later came to Jiangsu. So I met many colleagues, and they all gave me a lot of help. Now I know some basic things, and I have gradually adapted to the life of XX. XX is also a mentor to me. No matter what problems you encounter, no matter what problems arise, you need to ask for an open and sincere summary at any time. It is inevitable and necessary for different time periods to have different emphases.

I still have a lot to learn. If you give me a complete set of drawings, how can I design them? How to design the best, simplest and convenient site construction? As designers, we just want to design the best and most satisfactory drawings, which is convenient for the project manager to operate on site. Our industry is upgrading rapidly, and we need to constantly learn and enrich ourselves. In order to work smoothly, our division of labor also needs to have different emphases, but this does not mean that we should work hard. Because of this, we should help each other, check each other, and constantly make satisfactory results. Companies need self-motivated people, but one person's strength is never enough, and colleagues should also help each other. As long as you have the ability, it is obvious to all. You should not only give full play to your strengths, but also do what you should do well.

In short, in the past five months, I have gained a lot, but there are still many shortcomings, and I will continue to work hard to overcome and improve in the future.

I have been in the weak current class for almost a year. With the care and support of the vice president in charge and department leaders, the comprehensive strength of Weak Current Group has been improved. Five comrades work together and pay attention to coordination. Through continuous efforts, new progress has been made in all aspects of work and the project objectives have been gradually completed. We feel extremely proud inside. Only through continuous efforts can a person overcome all kinds of difficulties, constantly surpass himself and achieve the ultimate goal. So is a team. Only by continuous efforts and sincere cooperation can we achieve results and successfully complete the tasks assigned by the leaders. Briefly describe the following aspects:

First of all, lead the implementation of the deployment, installation and debugging progress display results of the engineering objectives.

The weak current project in Huangyuan market is our company's first attempt at the new system, which has attracted the attention and attention of company leaders. The engineering quantity is relatively large, especially after the installation of weak current system, the engineering objectives are linked one by one, and the realization of each objective is very critical to the delivery and use of the whole project. The specific objectives are as follows:

1, cooperate with civil engineering to reserve holes and embed pipelines.

During the construction of civil foundation, the lead hole of grounding project, the through-wall hole of pipeline in the floor, the through-wall protection pipe and inlet pipe of the line should be embedded.

2, cooperate with the civil construction of the bridge

After the civil engineering is basically completed, the installation of cable tray should be synchronized with the installation of other pipelines (air duct, water supply and drainage pipeline), and the reasonable placement and coordination of weak current tray and pipeline in space should be solved.

3. Cooperate with the store decoration project for pipeline construction.

The wiring and threading work was carried out with the decoration workers after the civil engineering was completely completed.

The process is carried out synchronously, and the project progress is completed before the end of the shop decoration project, thus avoiding the difficulty of threading and laying.

4, cooperate with the decoration project for the layout of each control room.

The decoration of each control room is synchronized with the overall decoration project. At the end of the decoration project, start the positioning, installation and terminal connection of weak current system equipment.

There are only five people in the weak current class. How to use effective management resources to complete the work objectives is a headache from beginning to end, so we actively cooperate with the construction unit and try our best to complete all the work. This requires us to work with the most reasonable division of labor, the highest efficiency and positive enthusiasm. To be honest, the pressure of working overtime for several months in a row is a challenge for every employee, but now we can say that almost every team member has withstood the test under this high pressure.

In the construction of key processes and key lines, we follow the principle of keeping a close eye on the site and never relaxing. Learn problem-solving skills from the staff of the construction unit with an open mind, so as to better ensure the normal operation of the weak current system in the future and lay a solid foundation for providing quality services for the market. Although these jobs have brought physical fatigue, my heart is always full these days.

Second, do a good job in basic management to ensure the completion of the weak current system objectives.

"If you don't accumulate steps, you can't go to Wan Li Road. If you don't accumulate small streams, you can't become a river." Any ambitious goal needs solid work to achieve step by step. The installation of weak current system is no exception, and the smooth realization of the goals in the above stages can not be separated from our practical basic work. In the past six months, combined with the characteristics of "complex system, heavy task and tight construction period", we have paid close attention to the following basic work:

1, improve the management system

Organize weak current team members to seriously study the company's rules and regulations and weak current professional knowledge training; At the same time, in view of the construction unit's time delay, material waste and other phenomena, we will further improve the management system, play the role of supervision and inspection, and finally coordinate the project unit to solve it. In terms of work arrangement, the principle of one person and many systems should be implemented, so that everyone can practice various weak current systems and finally improve their professional level.

2. Follow-up of weak current system

According to the professional construction progress of the project unit, our team has made relevant work plans, including the follow-up of the construction progress of 12 weak current system and the supervision of construction quality.

During the construction of security system, it was found that many lines could not display the image of the control center due to human factors, so as to deal with it in time. Notify the construction unit to immediately repair and rectify the problems such as short circuit and wrong connection in the integrated wiring system. The LED system tripped during use, the floor was not connected to the information point due to design defects, and a streaming media access point was installed in the elevator room. Through the full cooperation with the construction unit, it was finally solved. Up to now, 12 weak current system has been completely handed over. Problems in the security system and building automation system that occurred during the completion acceptance have been cleared up, and relevant personnel have been organized to track the construction progress.

Summary of weak current personal work 4 20xx years will soon pass. Looking back on one year's work, the tense and busy work scenes are presented one by one. In the past year, weak current has made great progress under the cordial care and specific guidance of hotel leaders and engineering managers. Weak current work has been recognized by customers. At the same time, there are also many shortcomings in the work, which are worth summing up seriously.

First, do a good job in daily maintenance of equipment and facilities.

Make weekly, monthly, quarterly and semi-annual maintenance plans for equipment and facilities, and arrange daily maintenance tasks in a targeted manner. Make the daily maintenance work planned and reasonable. In particular, the guest room computers have been completely sorted out and the system antivirus has been updated. According to the relevant operating regulations of the hotel, routine inspection of weak current is arranged, and relevant equipment, network room, telephone system, weak current well, TV management system, monitoring system and equipment are effectively maintained to ensure the safe use and operation of equipment and facilities.

Second, develop thinking, brainstorm and solve technical problems.

At first, the hotel's internal and external networks were two different network systems. In order to facilitate office work and save money, hotel leaders insist on using both internal and external networks. This is really a technical problem. I consulted many related technicians, communicated with telecom to replace the router, and finally solved the problem after numerous tests. Since the acceptance of the Chinese restaurant on the second floor, there have been some problems in the weak current system, which have affected its use function. How to restore the use function of the system and give full play to its due use efficiency is not only a technical problem, but also a challenge for weak current workers. For example, it was found that the network system and the China Soft Hotel Management System could not be used uniformly, and after debugging, many problems such as repeated IP address conflicts (previously two different separate systems) were solved. Weak electricity did not flinch in the face of technical problems, but stood in the perspective of hotel interests, pioneering thinking and brainstorming.

Third, develop team spirit and help other departments.

Have their own project characteristics, actively cooperate with various departments to complete various conference receptions, wedding banquets and other audio debugging and network wiring installation. Weak electricity promotes team spirit and works closely with other departments to complete heavy related work.

Four. Experiences and lessons from work and prospects for the coming year

Over the past year, weak current personnel have changed quickly, with great mobility, uneven technical quality, and a gap between execution and learning ability. How to mobilize the enthusiasm of employees, constantly run in at work, and give full play to everyone's work efficiency. In the new year, we will focus on personnel management and skills training. I believe that under the effective management and arrangement of hotel leaders, we will definitely overcome the shortcomings and make persistent efforts. Finally, as a weak current supervisor, I feel responsible for weak current affairs. Hotel leaders give themselves full trust. Trust is the driving force for them to work hard and constantly improve their management level. I will be serious and efficient, set an example, cooperate with the work of the project manager, guard against arrogance and rashness, and create a new working situation.

Summary of Weak Current Personal Work Model essay 5 The hectic 20xx years have passed quickly. Over the past year, under the correct guidance of the leaders of the group and the company, the company has carried out various services closely around the management indicators issued by the project leaders of the group and the company. Through unremitting efforts and the concerted efforts of Qi Xin, the weak current service has been carried out in an orderly manner, the service quality has been continuously improved, and all indicators have achieved good results. In order to give full play to the advantages, make up for the shortcomings, better complete the work tasks for the next year, create a more comfortable and beautiful office environment for tenants, and provide better and efficient services, the work in 20xx is summarized as follows:

1. In daily work, we strictly abide by the company's rules and regulations, conscientiously implement the company's instructions, and successfully complete the installation of telecommunication network equipment before the relocation of KK 100A tower 1F, 19F, 38F and 56F offices, thus ensuring the normal office environment of all departments of the company.

Second, take seriously the problems and rectification opinions raised in the inspection of the company and the project, and seriously rectify and implement them in combination with various wall hanging systems. With the help of leaders, we carefully checked the equipment, copied all kinds of readings on time, carefully checked the working conditions of the equipment, and carefully filled in various forms and records, which provided effective and accurate basis for future work and data analysis.

Third, under the guidance of the company's quality policy, under the correct guidance of the project leader, and with the close cooperation and unity of departmental colleagues, we will track the construction progress of the weak current system construction unit of KK 100A tower and supervise the construction quality, install, repair and maintain the equipment, conduct a comprehensive inventory and arrangement of the weak current in the building, communicate with the construction unit in time to make rectification, take over the central equipment that has not been handed over and has incomplete information, and actively participate in debugging to ensure that Due to the lack of equipment information, we can only check the equipment and lines one by one on the spot to understand the working process and control methods of the equipment and ensure the normal use of the equipment.

Fourth, the safe operation of all equipment in KK 100A and Block B projects was ensured, and the network rectification and technical assistance of Yujing Dongfang, Tiantaoxuan, Dongfang Yiyuan, KK 100c Tower, Fenghuang, Zhanjiang and other projects were completed.

Five, in terms of technical training, take the initiative to communicate with colleagues in the department, learn from each other, learn from each other's strengths, and constantly improve their business knowledge and technical level. I participated in the technical exchange study of the national professional registered engineer examination during working hours, which greatly improved my level and self-confidence, and further improved my work enthusiasm.

Over the past year, colleagues in the coordination department have done a lot of work for the company with all their heart, both internally and externally, but some work is still insufficient and can not meet the requirements of the company. In the future work, I will seriously make up for the shortcomings, further improve my ideological quality and personal skills, and make the greatest contribution to the development of the company.

engineering department

20XX December 25th

Weak current personal work summary model essay 6 the deceased is like a husband, and he doesn't give up day and night.

With the passage of time, under the trust and cultivation of company leaders and colleagues, I have struggled for more than five months. Looking back, I can still see the past vividly, full of deep feelings, working together, working hard together, sweating together, laughing together after hard work, enjoying lunch and chatting after work together, feeling more integrated into and loving this team, and realizing me and everyone in my family. There is a certain gap in personality height. I will constantly strive for self-improvement, persevere, be strict with myself, constantly improve my overall quality, and do my bit for the better development of the company. In a serious, responsible and positive attitude, I completely obey the orders and arrangements of my superiors, and sincerely and enthusiastically serve my customers. In a cheerful and optimistic atmosphere, I have learned a lot about dealing with people from the leaders and predecessors of the team, which has benefited me a lot and made me aware of my many shortcomings and the lack of knowledge reserves. Thank you very much. I will persevere and never slack off. Under the premise of earnestly completing the tasks assigned by my superiors, I will study hard to learn new knowledge, constantly improve my professional skills and conduct, and strive to make greater efforts for my team and my life.

After completing the tasks of the day consciously and spontaneously every day, arrange time to learn more about computer hardware and network technology, especially the detailed specifications and performance parameters of various components in computer hardware, and have a certain self-awareness ability for mainstream brands of computers commonly seen in the market at present, so as to strengthen the sorting and learning of the system. Let yourself better adapt to the rhythm of the company. When you go out to communicate with customers, everything you say and do represents the image of the company. You should always be strict with yourself, take morality as the standard of behavior, strengthen service awareness, improve cooperation and communication skills, and better provide quality services to customers. What looks like a simple job is actually not. At the beginning, the problems of system installation and printer submission made me deeply realize this. Solid basic theoretical knowledge is the life of technology. Only by deeply understanding and mastering every detail can we overlook the overall situation. "One minute on stage, ten years off stage" is the truth. We must never slack off, grasp the basics, start with the details, expand our working ability and thinking, and handle and complete each task efficiently.

The attitude towards life will determine the height and quality of a person's life. The same is true at work, so the present job is a kind of exercise, an opportunity, no matter what kind of work, you can do it seriously and accept it, and then, inspired by your dreams, with gratitude and indomitable spirit, such as an emperor cow, Dai Yue of Starlight Glimmer, stepping on every inch of land with down-to-earth and passion. For dreams, but also for responsibility!

Correcting one's position and learning to put oneself in the other's shoes can always abandon selfishness and take care of the overall situation, just like everything experienced in the construction of Lantian County Library Project and Lueyang Library, how to deal with everything in an orderly way when multiple emergencies occur at the same time or cascade nodes. How to nip in the bud, can we put aside our prejudices and self, and work with the team and even the customers to accelerate the healthy development of the project more effectively?

What goes around comes around, and what goes around comes around. If you pay, you will get something. If you want something, you must work hard and seriously. You must use your own mark to create real value for the company and the team. We should innovate and break through on the basis of perseverance, constantly consolidate our professional knowledge, constantly break through the imprisonment of our own world, stand on tiptoe, and strive to see further and do more. With the pace of time entering the severe winter, getting up every morning is becoming a difficult thing because of the cold. The last month of XX was the sprint stage of the company, but I was tortured by getting up. Why don't you learn to turn the heavy pressure of life and work into a thick coat to keep out the cold, overcome the cold, overcome yourself, blend into the atmosphere in full swing as soon as possible, and bloom with the company in the cold wind like plum blossoms.

"Tian Xingjian, the gentleman strives for self-improvement, the terrain is Kun, and the gentleman is kind.

This is my life motto, and I am looking forward to it. The new year is a year of self-challenge. I will always keep in mind my motto and belief in my life and work, constantly push myself forward, strive to be a serious, honest and kind person, and contribute my strength to the team's swagger in 20XX.

Summary of weak current personal work in 7-20xx years, under the guidance of leaders at all levels of the company, I have made some achievements in my work and gained some new understanding of weak current equipment and airport equipment. In short, do your job well. Ensure the normal operation of the airport's main systems, and carry out daily maintenance on the weak current parts of various departments and units. The specific personal work is summarized as follows:

A, weak current repairman at ordinary times in troubleshooting for various departments and units at the same time, but also for equipment inspection and maintenance. Make the daily maintenance work planned and reasonable. Maintain computers, networks and printers of all departments in time to minimize the inconvenience caused by equipment failure to all departments. If it cannot be solved in time, report the consultation work to the leaders as soon as possible.

The second is the application and maintenance of the airport integrated system. Use and maintenance of OMMS, ORMS, FMS and other software used by local security departments, maintenance departments and fire departments. Rushed to the scene at the first time when the system broke down to eliminate the fault and restore the operation of the system, thus indirectly ensuring the normal operation of the flight.

Third, update the NOD32-bit antivirus software of the server in time, and update the antivirus software regularly to avoid information leakage caused by virus self-replication and mutual spread within the company. Ensure the smooth flow of company information.

4. Check and maintain the surveillance cameras and lines in the airport. Replace the damaged camera in time and adjust the displaced camera in time to ensure the normal operation of the monitoring system. Solve the problem that the telephone cannot be connected in time, so that the work of various departments can be carried out normally.

5. There are some problems in the strong and weak current system of the terminal building, such as UPS. This year, our weak current maintenance team has received professional training, and we know how to deal with emergencies. For example, there is also a monitoring panel expansion project at the end of the year. Dahua technicians give us simple training and can use and maintain simple problems.

20xx work plan:

1, strengthen self-study. In weak current construction, I learned that engineering construction is a process from design drawings to physical objects. Therefore, if you want to learn weak current integrated wiring well, you need to know something about engineering construction drawings, so it is urgent to learn CAD drawing.

2. Be dedicated. Weak current maintenance team is everyone's common post. As long as everyone loves this position, we can achieve unity of thinking. Only by doing a lot of things can we cooperate with each other and finish it smoothly on schedule, avoiding many unnecessary prevarications, arguments and rework. Keep a clear head and treat your work with diligence and pragmatism.

The year 20xx has come to a successful end. For 20xx years, I have been strict with myself, insisting on doing my job well in my post, not bringing emotions into my work, urging myself to learn from colleagues and leaders for problems I don't understand, and striving to become a generalist and better serve the company. In the future work, we should continue to learn to make up for our own shortcomings. I will constantly improve the motivation of management level, cooperate with the work of superior leaders, make 20xx better and contribute to the development of the company.