I want to open a high-frequency transformer processing factory and seek advice from a production expert!

When opening a transformer factory, you need to figure out what you lack? Is it capital or technology?

Find a partner to reduce financial pressure. However, responsibilities must be clearly assigned, and technical shares cannot be too much, otherwise it will be easy for technicians to get stuck. Often partners end up failing because their responsibilities are not clearly defined.

Technical personnel must have experience in both manufacturing and quality control. And it is best to go to a large factory with a more complete system. A new factory does not need many senior technical personnel. Middle and middle-level technical managers need to slowly cultivate themselves and improve internally, so that talents are reliable and costs are reduced.

The equipment depends on the specific order and model: general CNC winding machine (if it is a small model and the order is stable, you can buy a 12-axis precision winding machine). 3259 testing machine (or other testing machines of the same level), multi-channel withstand voltage testing machine (such as 19053, 9919, etc.), tin oven, tunnel oven (the oven is relatively unsafe and prone to explosion), coupling testing machine (depending on customer requirements) ), interlayer testing machines and other equipment (CNC, coating machines, impregnation machines, dispensing machines,

Ovens, tin furnaces, testing instruments,

Some will use the entire

Test instruments include withstand voltage meter (ARC),

500k comprehensive test instrument, and interlayer test instrument.

If you want to make an inductor. Usually it is your future trend),

You need to use a 2M (5M is best) bridge)