Job Recruitment Website - Job seeking and recruitment - How many lines are there in Shenzhen subway now?

How many lines are there in Shenzhen subway now?

There are 8 subways in Shenzhen now! !

1. Shenzhen Metro 1 Line (envelope) Luohu (06:30-23:00)- Airport East (06:30-23:00) has 30 stops in total.

2. Shenzhen Metro Line 2 (shekou line) has 29 stops from Chiwan (06: 30-23: 00) to Xinxiu (06:30-23:00).

3. Shenzhen Metro Line 3 (Longgang Line) has 30 stops from Yitian (06: 30-23: 00) to Shuanglong (06:30-23:00).

4. Shenzhen Metro Line 4 (longhua line)? Clear lake (06:30-23:00)- Futian Port (06: 30-23: 00) 15 stop.

5. Shenzhen Metro Line 5 (Ring Central Line)? Huang Beiling (06:30-23:03)- There are 27 stops in front of the Bay (06:30-23:00).

6. Shenzhen Metro Line 7 (Xili Line) has 28 stops from Xili Lake (06: 30-23: 00) to Tai 'an (06:30-23:00).

7. Shenzhen Metro Line 9 (Meilin Line)? There are 22 stops in mangrove bay south (06:30-23:00)- Jinwen (06:30-23:00).

8. Shenzhen Metro 1 1 Line (Airport Line)? Futian (06:30-23:30)- Bitou (06:28-23:34) Station 18.

Shenzhen metro

Shenzhen Metro refers to the urban rail transit serving Shenzhen City, Guangdong Province, China. The first subway line in Shenzhen was officially put into operation on February 28th, 2004, making Shenzhen the fifth city in Chinese mainland with a subway system.

20 1 July official website information shows that there are eight lines in operation in Shenzhen metro, namely1line, line 2, line 3, line 4, line 5, line 7, line 9 and line 1 1, with a total of 6544.

The total length of subway operation lines in the city is 285km, and the total mileage of subway operation ranks fifth in the country, which constitutes an urban rail network covering six municipal administrative regions: Luohu District, Futian District, Nanshan District, Baoan District, Longhua District and Longgang District. ?

20 17 September official website information of Shenzhen Metro shows that Shenzhen Metro is under construction 13 section. Including Line 2 Phase III (East Section), Line 3 Phase III (South Section), Line 3 Phase III (East Section), Line 4 Phase III (North Section), Line 5 Phase II (South Section), Line 6, Line 8 Phase I (Through Line 2), Line 9 Phase II (West Section) and Line 9 Branch (Following 65438)

By 2020, Shenzhen Metro will form a rail transit network with 16 operating lines and a total length of 596.9 kilometers. ?

In 20 16 years, the annual passenger traffic of Shenzhen Metro was 109365438+ 10,000, and the average daily passenger traffic exceeded 2,986,600. In 20 15, the annual passenger traffic was 930.66 million, and the average daily passenger traffic exceeded 2,549,700. In 20 14, the annual passenger traffic was 866.99 million, and the average daily passenger traffic exceeded 2.3753 million.

Shenzhen metro