Question 1: What do builders do? The builder is the first-line manager of the construction site and the most basic manager.

Dealing directly with the construction team, to put it bluntly, is dealing with migrant workers. (without discrimination)

The main responsibility is to guide, supervise, cooperate and coordinate the operation team to complete the construction task.

The work scope of civil construction personnel is mostly: concrete engineering, formwork engineering, steel bar engineering, shelf engineering, foundation engineering, earthwork engineering, etc. That is, to guide, supervise, cooperate and coordinate within these contents.

There are many builders: hydropower builders, road builders, bridge builders and Gong Lin builders.

Don't worry about the experience. Without experience, I will be a construction worker as soon as I graduate. Thousands of people in Qian Qian have already walked this road. Keep a learning heart and you will get used to it soon.

Question 2: What does the builder do? 1, understand the construction drawings.

2, analysis of each type of work, construction sequence arrangement, technical disclosure, finished product maintenance, protection and other measures.

3. Provide positioning axis for each construction team, control the relative elevation horizontal line step by step, and proceed to the construction of the next working procedure after each working procedure is accepted.

4. If any discrepancy between the drawings and the site is found during the construction, it shall be reported in time.

5, the construction log is necessary, daily construction personnel, construction progress, the origin of raw materials, date, batch number, quantity.

Doing the above five things well is basically a qualified builder. The man who answered first above may have worked in the office for a long time. According to him, who are the technicians among the five members? You can't make everyone do the work.

Question 3: What is the main job of the station builder? The main task of the builder is to go deep into the construction site under the leadership of the project manager, assist the construction supervision, review the engineering quantity together with the construction team, provide the specifications, models and delivery dates of the materials needed in the construction site, do a good job in the acceptance visa and management of the materials on site, accept and sign the concealed works in time, assist the project manager in collecting, keeping and archiving the engineering data, and bear important responsibilities for the progress and expenses of the on-site construction.

Question 4: What exactly does a builder do in a project? Hello.

The builder's job is actually very complicated.

Specific responsibilities are as follows:

First, work under the direct leadership of the project manager, implement the policy of safety first and prevention first, do a good job in safety prevention according to regulations, implement safety work, ensure that safety must be emphasized in terms of efficiency and safety must be emphasized in production.

Second, be familiar with the construction drawings carefully, prepare various construction organization design schemes and construction safety, quality and technical schemes, and prepare individual project progress plans, manpower and material resources plans and machinery and equipment plans.

Third, compile and organize employees to hold meetings on schedule, study, make reasonable arrangements and give scientific guidance, and successfully complete all construction tasks of this project.

Four, cooperate with the project manager, earnestly fulfill the terms of the "construction contract", ensure the smooth progress of the construction, and safeguard the reputation and economic interests of the enterprise.

Five, the preparation of civilized construction site implementation plan, according to the reasonable planning and layout of the project construction site general plan, arrange, implement and create a civilized construction site.

Six, the preparation of the total project schedule and monthly schedule and the monthly schedule of each construction team.

Seven, do a good job in the cost accounting of sub-item general contracting in time (according to the single item and sub-item), and inform the management personnel of the contracting department of the accounting results in time, so as to improve the construction plan and scheme in time and strive for higher benefits.

Eight, to each team issued a construction task book and material quota requisition. Cooperate with the project manager.

Nine, supervise and urge the construction materials and equipment to enter the site on time and be in a qualified state to ensure the smooth progress of the project.

Ten, to participate in the project completion center, responsible for the intact protection of the project.

Eleven, reasonable deployment of production factors, strict organization of construction, to ensure the progress and quality of the project.

Twelve, organize concealed engineering acceptance, participate in the quality evaluation of partial projects.

Thirteen, participate in the blue prints.the design and the preparation of the project schedule.

Of course, these are all written things. Specifically, we should do the following things well:

Under the leadership of the project manager, go deep into the construction site, assist the construction supervisor, check the engineering quantity together with the construction team, provide the breakdown, model and delivery date of the materials needed in the construction site, do a good job in the acceptance visa and management of the materials on site, handle the acceptance visa and engineering quantity visa of the concealed works in time, and assist the project manager in collecting, keeping and archiving the engineering data.

That's about it. I hope it helps you.

Question 5: What will the builders do? Being a builder is very tiring, and there are many things to do, such as leveling the defense line, measuring, setting out and super-leveling. The main work includes several aspects: 1, open construction, mainly responsible for setting-out survey. If someone in the labor service team does it, you will be more than half relaxed, just check it at ordinary times. There is also a good technical disclosure. 2. Safe opening, some people may say that it is a matter of security officer. If the safety officer starts the rectification list, hehe, then put it aside first and rectify it according to the contents on the rectification list first. 3. Material requirements, calculate the amount of materials needed in a week, so as to report to the material personnel and suppliers and prepare materials in advance. 4. Accounting requirements, timely, accurate and complete visa, change and technical verification list, etc. After all, that is also the bulk of the cost and profit of the project department. 5. Information requirements. Civilization and clearing the field are essential to declare a civilized construction site, hehe. Hehe, I haven't thought of anything else. Anyway, in a word, the builders on the construction site have great rights and the most responsibilities.

Question 6: What do civil builders usually do? Pay-off, copy elevation, grass-roots management and team coordination.

A, responsible for the construction quality of this project, responsible for the engineering quality and safety work.

Second, be familiar with the construction drawings, understand the general situation of the project, draw the site layout, and make the site layout well. Have a clear understanding and memory of design requirements, quality requirements and specific practices, and carefully organize the team to construct according to the drawings.

3. Be fully responsible for the construction site survey, measurement, construction organization and site traffic safety protection settings of this project, arrange the construction of temporary facilities and other engineering tasks, solve relevant problems in construction in time, and report to the higher authorities to ensure the construction progress.

4. Participate in the blue prints.the design, try to solve difficult problems in the drawings, and be responsible for contacting Party A and the design department when encountering major technical problems and properly solving them. Adhere to the construction according to the drawing, and write a written technical disclosure before the sub-project construction.

Five, participate in team technical disclosure, project quality, safety production disclosure, operation method disclosure. Strictly abide by the construction operation procedures, strictly control the quality to ensure safety, be responsible for the pre-job training of new workers, and educate and urge workers not to operate illegally.

Six, the preparation of unit engineering production plan. Fill in the construction log and concealed engineering acceptance record, cooperate with the quality inspector to sort out technical data and construction quality management, and issue the concrete and mortar mixture ratio of each part on time. Responsible for arranging the test of each sub-item.

Seven, responsible for the implementation of the construction plan, according to the total time limit for a project and the total construction progress plan monthly or ten-day construction plan schedule, and organize the corresponding construction team according to the plan, to ensure the project completed on schedule.

Eight, according to the construction plan, make the daily work arrangement of each construction team, make the dynamic table of labor force in advance, arrange the labor resources reasonably and organize the construction reasonably.

Nine, raw materials, equipment, finished or semi-finished products, safety protection supplies, etc. Do a good job in testing and re-examination. If the quality is inferior or does not meet the construction specifications and design requirements, it has the right to prohibit its use in the project.

Ten, in accordance with the provisions of the safety operation procedures and quality acceptance standards, organize teams to carry out quality and safety self-inspection, mutual inspection and handover inspection system, and strive to improve the technical quality and self-protection ability of workers. Safety protection devices, such as traffic safety facilities and mechanical equipment, set on the construction site can only be carried out after the organization has passed the acceptance.

Eleven, conscientiously do a good job of concealed engineering disciplines, division and unit project completion acceptance visa, collect and save the original technical data, and handle the engineering change manual. Responsible for the final report after the completion of the project.

Question 7: What exactly do builders do? Responsibilities of builders in infrastructure sector:

A, according to the operation instructions issued by the infrastructure, set up the site construction management team, set up representatives at the scene, equipped with professional builders. The construction party shall work under the leadership of the site representative, obey the management and mobilization of the infrastructure department, and manage the site in accordance with the construction law, construction project management regulations and national norms. Second, on-site safety management, quality management and progress management are managed by departments, teams and crews at three levels, and a one-vote veto system for safety issues is implemented. Three, the site representative is responsible for the examination and approval of the construction organization design of each project, and finally sign the project data. Four, the professional builder is responsible for the examination and approval of each engineering professional construction scheme, engineering data review and confirmation. Five, the builder is responsible for the professional construction quality, construction progress, responsible for the professional construction safety, patrol the construction site at any time, cooperate with the material tester * * * to be responsible for the professional material quality monitoring, and cooperate with the professional supervision personnel for on-site management. If it is an economic change project, report it to the project site representative, who will handle it together with the budget staff. Six, the project quality lifelong system. Seven, the professional construction personnel from beginning to end is responsible for the signing and certification of technical data in the process of related engineering construction, and is responsible for the scientificity, accuracy and authenticity of the data. After the completion of the project, organize supervisors to countersign and certify technical data and data related to economic issues (such as hidden records and measurements). Eight, before construction, the builder should be familiar with professional drawings, complete professional drawings disclosure, before construction and engineering data sorting, collection and statistics. Nine, the builder should establish a management account, to complete the project data signature, change, project negotiation, economic visa and other detailed records, and the original data for economic data storage. At the same time, in order to speed up the project settlement, supervision and construction units should be urged to complete the single settlement report as soon as possible after each change of the bidding project with list quotation. Ten, after the start, the builder must stick to the scene, in case of construction at night, should follow the homework. If the construction period at night is long, it should be reported to the project site representative in advance to determine whether to take spot checks or other ways to deal with it. Eleven, complete other work assigned by the director of infrastructure.

Question 8: What do hydropower builders usually do? Site management! Write a construction diary! Running two classes is no problem! Check whether the workers are right or wrong! Solve the problems raised by the monitor! The blue prints.the design must be clear, and inform the hydropower duty leader! Material plan! Material budget! The monthly report must be counted!

Question 9: What should a builder do? What should he do? Construction workers spend 70-80% of their time working on outdoor construction sites. Daily work includes: marking ink lines with Mo Dou, setting out lines with a ruler, drawing elevation lines, looking at drawings, supervising management progress and checking quality.

To learn from the builder, you must be prepared for the following:

Get up early, because I go to work at 6 o'clock in summer and at or before 7 o'clock in winter at the latest;

Living conditions are worse than at home, because most people live in mobile homes, or one and a half people or two and a half people;

Sunbathing in summer and blowing in winter, you can't have any thoughts of deliberately protecting your skin, such as sun protection;

You can't wear good clothes at work, because your clothes will not only be stained with a lot of ink and cement slurry, but also be scratched by steel wires from time to time.

To learn builders well, we must be responsible and proactive; Be diligent and prepare in advance.

On the construction site, the most promising apprentice is to learn from the construction workers. If the builder does a good job, he will be promoted to the site builder, technical director, deputy project manager and so on step by step.