Job Recruitment Website - Job seeking and recruitment - How many high-speed railway station are there in Changzhou?
How many high-speed railway station are there in Changzhou?
Changzhou North Station covers a total area of about 59,300 square meters, with the main building 1 floor and two floors in some areas, with a length of 450 meters. The first-phase start-up area has a built-up building area of 39,600 square meters, including a building area of10.3 million square meters and a supporting building area of 26,600 square meters. Among them, the construction area of taxi parking lot is 7560 square meters; South Square underground social parking garage, divided into upper and lower floors, with a construction area of15000m2; The total length of five roads in South Square is 2.618km; Covering an area of 57,400 square meters, North Square Road 3.
The main building of Changzhou North Station looks like a fish, and the whole steel awning looks like a fish, which embodies the historical and cultural heritage of Changzhou, the land of fish and rice. Changzhou North Station, as the only high-speed railway station with light rail design in Beijing-Shanghai high-speed rail line, is a high-speed railway station with unique shape, low carbon and environmental protection, and distinctive features.
Overall layout of Changzhou high-speed railway station
Changzhou North Station adopts the streamline mode of entering and leaving the station, which has the characteristics of both terrain and bridge station. The entrance is located on the south side of high-speed railway station House. Passengers can enter the waiting and ticketing functional area of high-speed railway station from the South Square.
The exit of the station is located in the west of high-speed railway station House, and there are 6 exit gates, including 4 narrow passages, 4 wide passages 1, 1 manual passage 1 and 1 ticket replacement device 1. After leaving the station, passengers can walk to the west 100 meters to reach the bus hub, or enter the taxi parking lot on the basement of the west side of the station building or the social parking lot underground of high-speed railway station Wu Nan Square through the escalator.
- Previous article:Tuition of Suzhou Health Vocational and Technical College
- Next article:How about working in Hefei Tonglian Finance?
- Related articles
- Where can I find wedding clients?
- Micro-fat recruitment
- Tangxia Xiefa Factory Salary
- Words to pay attention to when attending an English interview
- What matters should workers pay special attention to in the recruitment form provided by the employer?
- Laizhou municipal government hotline
- How about Fuzhou Youchi New Energy Technology Co., Ltd.?
- Do companies have to pay for posting recruitment information?
- How to translate the company name Jinzhou Huiteng Business Co., Ltd.
- Eight years of experience in switching from online optimization to entrepreneurship.