Job Recruitment Website - Property management - Excuse me, 130- 140 square meters, how much is the budget for the renovation of four rooms, one living room and a half package?
Excuse me, 130- 140 square meters, how much is the budget for the renovation of four rooms, one living room and a half package?
First, the mason decoration budget.
1, floor tile (special-shaped pavement shall be counted separately) 122m2* (auxiliary material 15/m2+ artificial 20/m2)=4270 yuan 2, the skirting line shall be marked with invisible skirting line 6 yuan /m, and the skirting line shall be attached with 5 yuan /m, 105m*. The exposed baseboard of balcony is 0m* (auxiliary material 4 yuan /m+ artificial 5 yuan /m)=0 yuan 3. Tile the kitchen and bathroom wall: 82 square * (auxiliary material 15/m2+ labor 20/m2) = 2,870 yuan 4. Balcony cover plate (tile 25 yuan/m, ceramic tile 15 yuan/.
5. Brush the balcony wall and cover for 0m2* labor 10 yuan /m2=0 yuan 6. Packaging agent 10 yuan/bag * 15 yuan/bag = 150 yuan 7. Paving 9 pieces of threshold marble * (2 pieces/piece of fittings+labor 15 pieces/piece)
8. The stone paving of window sill is 0m * (auxiliary material 5 yuan /m+ labor cost 10/m)= 9 yuan. Bay window marble pavement is 3 * (50 accessories+80 labor costs) =390 yuan.
10. Waterproof treatment: a. Waterproof the floor brush for three times. Brush the wall twice. B. The kitchen wall is 0.3m high, the bathroom wall is 1.5m high, and C. Oriental Yuhong JSA-10/waterproof.
Second, the wall paint construction budget 1. The ceiling and wall of living room and bedroom are repaired with putty, and putty powder is used for two or three times, 404m2* (auxiliary material 5 yuan /m2+ artificial 5 yuan /m2)= 4040 yuan.
2. Primer and topcoat for ceiling of living room and bedroom, primer once and topcoat twice, 404m2* (auxiliary material 7 yuan /m2+ artificial 7 yuan /m2)=5656 Yuan 7 1m2* (auxiliary material 35 yuan /m2+ artificial 10 yuan/m2) = 3/kloc.
Three, carpentry ceiling modeling and background wall decoration budget
1. aluminum gusset ceiling 1 1m2* labor 15 yuan /m2= 165 yuan 2. Ceiling of living room and bedroom: first-class ceiling: 0 square *80 yuan /m2=0 yuan; Secondary suspended ceiling: 0 m2 * 1 10 yuan /m2=0 yuan.
Light strip: 0 square *80 yuan/m =0 yuan.
Background wall: quote according to the design drawings. 3. Due to the difficulty in painting the wall and laying wires caused by the modeling ceiling, the increased labor and accessories costs are counted as a 0 yuan.
IV. Budget for hydropower construction (choose the second charging method) 1. Waterway reconstruction and sanitary ware installation A. Hot and cold water pipes are transformed into aluminum-plastic pipes. 70M* (auxiliary material 45 yuan/m+labor cost 10 yuan/m) = 3,850 yuan b, plastic PVC pipe combined with sewer and drain pipe reconstruction 13m * (auxiliary material 20 yuan/m+labor cost 10 yuan/m) =390 yuan c, valves and supporting elbows have no d and water meter. The conduit cost is 800M* (auxiliary material 4 yuan/m+artificial 2 yuan/m) = 4,800 yuan B, 4 square wires and Wenchang 68 line, and the conduit cost is 350M* (auxiliary material 5 yuan/m+artificial 2 yuan/m) = 2,450 yuan.
Verb (abbreviation of verb) other miscellaneous expenses
1, smash the wall 0 square * (smash 15 yuan /m2+ carry 10 yuan /m2)=0 yuan.
2. Don't repair after hitting the wall. 3. Wall building includes handling and double-sided swinging, with 0 square *95 yuan /m2=0 yuan lightweight brick wall, 12 wall 95 yuan /m2, 18 wall 120 yuan/m2; Red brick wall: 12 wall 95 yuan /m2, 18 wall, 120 yuan /m24. After masonry, the connection and reinforcement of steel mesh between the new wall and the old wall will be charged at twice the masonry area; 0 square *7 yuan/m2 =0 yuan.
5. Mend the door opening (after the door is installed, grout is poured into the joint of the door frame) 0 * (auxiliary material 50 yuan/piece+artificial 80 yuan/piece) = Yuan.
6. It takes 65438 yuan +000 yuan/block to make angle steel or cement steel formwork, and the cost of more than 90CM in length shall be counted separately. 0 pieces * 100 Yuan/piece =0 yuan.
7, air conditioning, exhaust fan, smoke exhaust hole drilling 0 *30 yuan/a = 8 yuan. Floor leveling of kitchen and bathroom balcony: 23.52 square * * (auxiliary material 10 yuan /m2+ artificial 5 yuan /m2)=352 yuan.
9. The toilet is backfilled with lightweight brick as the skeleton and filled with ceramsite, with a price of 10.03m2* 120 yuan /m2= 1204 yuan.
10. The installation of bathroom faucet and hardware (excluding furniture installation and other installation fees unrelated to this quotation) is charged according to the interior area 140.5m2*4 yuan /m2=562 yuan. 1 1. Three aluminum alloy doors are installed in the bathroom and kitchen *80 yuan/fan =240 yuan 12, and the floor is carpeted for protection. It is charged according to the indoor area 140.5m2* artificial 4 yuan /m2=562 yuan.
13. The handling fee for decoration materials is calculated according to the interior area of the suite. All decoration materials are transported to the construction site. If there is no elevator, the second floor and above will be charged separately, excluding the wall building materials handling fee, 8 yuan per square meter. 140.5m2* artificial 8 yuan /m2= 1 124 yuan.
14. The cleaning and sanitation fee for decoration garbage includes cleaning and transportation of decoration garbage except wall smashing and skirting, which will be transported to the designated place of the property by the construction site. After the renovation is completed, the professional cleaning company will do the final cleaning. 5.5 yuan /m2=773 yuan, made by a professional termite control company, and the calculated indoor area is 140.
Other auxiliary expenses of intransitive verbs
1. When measuring houses, if the thickness of cement sand layer of floor tiles exceeds the standard thickness of 5cm, the cost of 1-5 yuan/square shall be increased as appropriate in the budget; However, if the cost of cement sand is not indicated in the budget after measuring the house, this cost shall not be increased during the decoration process. 2. Calculation method of footstone length: the door width less than 0.9m is included in the calculation length.
3. Calculation and billing method of kitchen and bathroom wall tile area: the sliding door area is not included in the billing area; Other door and window areas are included in the charging area (referring to labor costs, auxiliary materials costs, and the main materials costs are subject to the actual number of pieces used); When the kitchen and bathroom wall brick budget is not measured in front of the house, it will be charged at a height of 2.4 meters, and the measurement after the house will be charged at the actual height; Aluminum alloy edge banding is used at the edges and corners of doors and windows, and it is not necessary to grind 45-degree angle tiles. The charge for artificial auxiliary materials is reduced by 4 yuan/square meter, and the owner of aluminum alloy strip will buy it himself. 4. Calculation method of indoor wall painting area: the area of doors and windows larger than 2.5 square meters is not included in the charging area; The areas of the sides and top surfaces of beams, doors and windows (including bay windows) are not included in the total area; The area of wall paint increased due to the shape of secondary ceiling and lamp strip is not included in the charging area of wall paint; The calculation formula of wall painting area is: indoor footstone length * floor height+top surface area, and the standard room is charged at 2.8 meters high. 5. If the toilet is backfilled with decoration garbage, only the labor cost will be 100 yuan/room.
You need to budget according to family planning and style, and everyone will use different materials and prices. Then the decoration style will naturally be different. Like our side, a set is renovated for 40-50.
About 10 thousand, it's relatively high-grade, because house decoration is a major event in life, and no one wants to spend so much effort. If things are not used well, they often have to be reworked. Materials must be of good quality and not easy to deteriorate. So that the service life is longer.
- Related articles
- What is the surrounding environment of the capital city? Is life convenient?
- What about Tianjin Shengyou Technology Co., Ltd.?
- How far is Changchun Shanghai from Shanghai Greenland Group Company?
- Where is the Shanghai garbage dump? How many garbage dumps are there in Shanghai?
- Can the rented house in jimo city Mingyuan go to Xianshan Middle School?
- New China Life Insurance Wenzhou Branch Address Inquiry
- Changchun Shangertang Visual Ear Shoe Address
- Can you help me figure out how to write this notice? The community is closed in the afternoon 12, please come back early!
- Unauthorized demolition of property and greening of residential areas, who can argue with whom?
- What problems should be paid attention to in garden road pavement?