How to charge for the project investment risk assessment report

The charging standards for the project investment risk assessment report are as follows:

1. Benchmark charging standard for compiling social stability risk assessment report of construction project

Note: The compilation cost of each document is calculated step by step, and the formula is: compilation cost = minimum compilation cost of this document+(engineering investment-minimum engineering investment of this document) * rate.

2. The benchmark charging standard for the social stability risk assessment report of construction projects.

Note: The compilation cost of each document is calculated step by step, and the formula is: compilation cost = minimum compilation cost of this document+(engineering investment-minimum engineering investment of this document) * rate.

3. Adjustment coefficient of ladder charges

(1) industry adjustment coefficient

On the basis of the above-mentioned benchmark charging standards, according to the division of key construction projects in the Notice on Deepening the Social Stability Risk Assessment of Wharf Construction Projects (Shanghai Development and Reform Investment [201]169), the specific division standards in the following table are multiplied by the corresponding adjustment factors for adjustment:

(2) Adjustment coefficient of social stability risk sensitivity

On the basis of the above charging standards, according to the sensitivity of the social stability risk assessment of the project, the specific division standards in the following table are multiplied by the corresponding adjustment factors for adjustment:

(3) adjustment coefficient of regional scope

On the basis of the above charging standards, according to the geographical location of the project area and whether it is divided into built-up areas, the specific division standards in the following table are multiplied by the corresponding adjustment factors for adjustment:

Note: Built-up area refers to the area that has been actually developed and constructed, and municipal public facilities and public facilities are basically available.

According to the above adjustment coefficient (1)-(3), after adjusting the consulting service fee for social stability risk assessment of construction projects, if the preparation fee for social stability risk assessment report of construction projects is less than 60,000 yuan, it will be calculated as 60,000 yuan, and if it is higher than 500,000 yuan, it will be calculated as 500,000 yuan; If the assessment fee of the social stability risk assessment report of the construction project is less than 40,000 yuan, it shall be calculated as 40,000 yuan, and if it is higher than 250,000 yuan, it shall be calculated as 250,000 yuan.