General situation of Xuzhou subway construction

Xuzhou Metro 1 Line

The first phase of Xuzhou Metro 1 Line is 2 1.967km long with 8 stations/KLOC-0. 20 15 The first phase of 1 Line, starting from Luwocun Station in the west and ending at Xuzhou East Station, is a high-speed railway. It mainly passes through Xiao Highway, Huaihai West Road, Huaihai East Road, Huaihai East Road Extension Line and Huaihai East Road. The total length of the line is 2 1.967km, including 0.57 1km for overhead line, 20.996km for underground line and 0.4km for ground transition section. * * * There are 18 stops. The first phase of 1 line covers the east-west passenger corridor of the city, connecting the old city, Bashan area and high-speed rail business circle.

Xuzhou Metro 1 line connects three commercial centers (Pengcheng Square, People's Square and huaihai plaza) and two railway hubs (Xuzhou Station and East High-speed Railway Station) and 1 district center (Bashan District Center) and important areas along the line (medical care, education, etc.). ); The west end of 1 line is equipped with a parking lot, and the east side of 1 line is equipped with a depot, which communicates with the national railway system by using the existing local railway branch line.

The underground municipal engineering of the first phase of Xuzhou Metro 1 Line has a total length of 3,348.676 meters, with two stations and two sections, all of which are laid underground. The underground municipal engineering scale of Xuzhou urban rapid rail transit 1 Line Phase I project is three stations and two sections, namely No.1 Station, Zhenxing Road Station and Xuzhou East Station. The laying methods are all underground lines, and all three stations have the conditions to adopt open excavation and cover excavation construction; 1 Mining method is proposed for the section from the railway station to Zhenxing Road Station, and cut and cover is proposed for the section from Zhenxing Road Station to Xuzhou East Station.

The total length of the test section is 3.3km. The test section starts from Xuzhou East Station in the west and ends at 1 Road (Hanyuan Avenue) in the east, with a total of ***2 stations and 2 sections. The "two stops" are Xuzhou East Station and Zhenxing Road Station, and the "two sections" are 1 Road to Zhenxing Road and Zhenxing Road to Xuzhou East Station.

On 20 1 April 5 14, the two-way tunnel between the experimental section of Xuzhou Metro1Line 1# shaft and No.2 shaft was successfully connected. The last wall of the first vibration section 1 # shaft in Xuzhou rail transit1line test section exploded, and the left and right lines of 1# shaft and No.2 shaft have been successfully connected.

xuzhou metro line 2

The first phase of Xuzhou Metro Line 2 starts from Xintaizi River in the north and ends at the East Station of the new area. The first phase of the line is 23.9 kilometers long, all underground, with 19 stations and 5 transfer stations. The first phase of Line 2 (Xintaizihe Station ~ East Station of New District) connects Jiulishan area, old city and new city in series, and mainly passes through China Resources Road, Zhongshan North Road, Pengcheng Road, Jiefang Road, Liyuan Road, South Third Ring Road and Kunlun Avenue. Among them, there are 5 transfer stations: Pengcheng Square Station 1 Line, Huaita East Road Station, Line 3, Hanyuan Avenue Station, Line 4, Normal University Station and Wenboyuan Station, Line 5. It will connect two municipal centers (the center of the old city and the center of Xuzhou New District), two highway passenger hubs (the North Bus Station and the new passenger station), as well as market groups, medical care, sports, exhibition service facilities and the district government. The urban "double-hearted" group will form a direct railway connection. The project is scheduled to start in June 20 15 and be completed in February 2020, with a total construction period of 5 years.

xuzhou metro line 3

The first phase of Xuzhou Metro Line 3 has a total length of18.3km, and there are 15 stations, all of which are underground lines, and there is a depot. The first phase of Line 3 starts from Daqing Road Station and ends at Ankeyuan. It is a north-south backbone line, roughly along Daqing Road-Fuxing North Road-Fuxing South Road-Huaita East Road-Xiajiefang South Road-Beijing Road-Changjiang Road-Huangshan Road-Yinshan Station-Ankeyuan, passing through Xuzhou Station, Huaihai Memorial Tower, Science and Technology Square, China University of Mining and Technology, Jiangsu Normal University, and Sanpower Square Commercial Center in Tongshan New District, and ending at Yinshan Station. It connects Jinshan Bridge area and Tongshan New District, two urban functional divisions. By then, the main urban area will form a "large-shaped" skeleton track network, giving full play to the overall benefits of the network; Promote land development along the line, especially guide the development of new areas, promote the transformation of old cities, and give play to the guiding role of rail transit. The project is planned to start construction at the beginning of 20 16 and be completed and opened to traffic in 2020. xuzhou metro line 4

Xuzhou Metro Line 4 is an auxiliary line, which runs through the secondary axis of urban development, covers the north-south passenger corridor in the east of the city, connects Jinshanqiao area, Bashan area, Xuzhou New City and Tongshan New District, and guides and promotes the development of Jinshanqiao area, Xuzhou New City and Tongshan New District.

xuzhou metro line 5

The planning starting point of Xuzhou Metro Line 5 is Xuzhou and the end point is Sambo.

Xuzhou Metro Line S 1

Xuzhou Metro Line S 1 (Jiawang Line) is planned to start from Anran and end at Jiangzhuang, jiawang district. The line is 27.3 kilometers long, with stations 10, most of which are located on the ground. Transfer from Anranshan Station to subway 1 line, and follow G206 to the north via Hushan Village, Dazhenwu area, No.25 bus station, intersection of G206 and G3 10, intersection of G206 and Liujia Line, intersection of G206 and Xiaxin Road, intersection of G206 and Hongfu Road, Jiawang bus station, No.28 bus station and Zhaoqiao to Jiangzhuang Station.

Xuzhou Metro S2 Line

The S2 line (airport line) of Xuzhou Metro is planned to start from Xuzhou East Station and end at Xuzhou Guanyin International Airport. The total length of the line is 38.3 kilometers, Xuzhou City is 35.5 kilometers, Suining County is 2.8 kilometers, and there are stations 10, most of which are located on the ground. Xuzhou High-speed Railway East Station transfers to subway 1 line, Olympic Sports Center transfers to modern tram 1 line, Xinyuan Avenue Station transfers to subway line 2, and passes through Xuzhou Institute of Technology, Pantang, Mengzhuang, Zhangji, tongshan district Fangcun Town, Zhangji Town, Suining Bus Station-Guanyin Airport West Station to Xuzhou Guanyin Airport.

Xuzhou Metro S3 Line

The S3 line of Xuzhou Metro (Xiaoxu Intercity) is planned to start from Xingshanzi and end at Longhu Park. Line length 19. 1 km, change from Xingshanzi Industrial Park Station to the subway 1 line, and go to Longhu Park via Mashan Village, Malin, Shenzhuang, Huaibei Duanyuan Bus Station and Xiaoxian Bus Station.

Xuzhou Metro Line 65438 +0: 5: 30 am to 23: 30 pm. Xuzhou Yuan Jing subway network consists of eight lines, including five in the main city, two in the suburbs, and one in the intercity line 1. In the main city line, on the basis of the recent three lines, lines 4 and 5 are added, with a total length of 15 1.9 km and a station165438. In addition, it is planned to build the 1 line from Enron Mountain to jiawang district City Express Line, 1 line from Xuzhou East Station to Xuzhou Guanyin International Airport Airport Line, and 1 line from Xingshanzi to Xiaoxian Longhu Park Intercity Line.