Emergency plan for water stoppage accident
In life, work and study, accidents happen from time to time. In order to avoid causing huge losses and harm, people are usually required to make emergency plans in advance. What are the format and requirements of the emergency plan? The following is a sample essay (selected 5 articles) of emergency plan for water cut-off accident, which I collected and sorted out, hoping to help you.
Emergency plan for water cut-off accident 1 This emergency plan is formulated in order to correctly, effectively and quickly deal with water cut-off, minimize the impact and loss caused by water cut-off, and ensure the normal production of the company and the normal dining order of employees.
I. Scope of application:
Water cut-off events caused by water-related equipment damage and natural disasters have a great impact on the normal production and food supply of restaurants, posing a serious threat.
Second, organization.
Team Leader: Restaurant Manager
Members: heads of various systems, cleaning aunts, chefs, supermarket staff, office staff!
Third, the steps
(1) Stop water supply
1, planned to stop water supply.
(1) The company needs to stop water supply due to external maintenance or internal maintenance. After receiving the notice from the water supply company or the company's maintenance department, the restaurant will inform the person in charge of the affected department half a working day in advance, telling the specific water supply time and water supply time, and assisting everyone to make good work arrangements or prepare water in advance.
(2) After receiving the notice of water cut-off, all departments should check the water-using equipment and stop when necessary; The kitchen should prepare enough water in advance after receiving the notice; The team leader shall confirm the water storage capacity of the fire water system to ensure that the fire water system is always in working condition; The cleaning staff should prepare some fresh water for everyone to wash their hands in the commonly used public sink. Cancel after normal water supply.
(3) Turn off the faucet or valve in the department area; Cleaning personnel should turn off faucets or valves in areas such as public hand-washing pools and auxiliary rooms; The person in charge of each area of the restaurant should turn off the faucet or valve in the restaurant area in time.
2. Suddenly stop water supply
(1) In case of emergency water cut-off for unknown reasons, the person in charge of the restaurant should immediately call the factory affairs to find out the reason of water cut-off, ask the human resource manager about the reason of water cut-off and the time to restore water supply, and give timely feedback to the person in charge of each system of the restaurant.
The person in charge of the restaurant will promptly report to the person in charge of each system of the restaurant to do a good job of storing water and preparing meals.
(2)
1. We have a fixed manufacturer of drinking water. Our company can send water directly to the manufacturer.
2, or most of our aunts and cleaning rooms have water towers, and about 80 tons is enough for us to use for 2 days.
Emergency plan for water cut-off accident II. In order to prevent accidents caused by water and power cuts, an emergency plan for water and power cuts is formulated according to the spirit of the relevant documents of the higher authorities and the decision of the school.
Safety leading group
Team leader: Xu xx
Deputy leader: Xiao xx
Members: class teachers and logistics staff of each class.
First, the main responsibilities:
Timely understand the information of water and power outages, master the equipment configuration of the school to prevent sudden water and power outages, and put forward preventive countermeasures and measures according to the actual situation of the school, strengthen the safety education for teachers and students in the school, and enhance the awareness and ability of protection.
Second, the work measures:
1. Strengthen school safety education and publicity, and make full use of publicity positions such as bulletin boards, blackboard newspapers and campus broadcasts. And through theme class meetings, radio stations and other forms, all teachers and students will be publicized, educated and trained on the prevention knowledge of water and power cuts, so that students will not panic when water and power cuts are stopped.
2. Strengthen the maintenance and installation of facilities to prevent water and power outages. The school will invest money to install some related equipment according to the actual situation to prevent sudden water and power outages. For example, emergency lights and exit signs are set on the stairs of dormitory buildings and teaching buildings to ensure smooth stairs and firm guardrails. When water and electricity are cut off, the class teacher and classroom teacher will organize students to evacuate safely.
Three. Reports and responses:
1. If the water supply and power outage are notified in advance, all teachers and students shall be informed to make preparations before the water supply and power outage on the premise of getting in touch with the offices to explain the situation.
2. Temporary water and power cuts without prior notice:
(1) The manager on duty immediately reports the situation to the safety leading group for water and power cuts, and the leading group will arrange related work separately.
(2) The members of the leading group shall immediately notify the important functional departments by telephone, for example, inform the canteen to arrange meals and temporary lighting appliances, and inform the education department to arrange the head teacher and classroom teachers to maintain order in the aisles and stairs of each floor.
(3) The General Affairs Department is responsible for organizing water and electricity maintenance personnel to find out the causes of water and electricity outages, and timely contact and coordinate with the local water and electricity departments to troubleshoot as soon as possible.
3. Water supply and power failure during night self-study:
(1) The school personnel on duty should call the electrician and maintenance personnel on duty in time.
(2) After the water and electricity are cut off, the teachers on duty should immediately go to the designated floor to organize students to enter the classroom to maintain order and evacuate in an organized and planned way.
Emergency plan for water cut-off accident 3 This plan is formulated in combination with the actual situation of our school in order to maintain the normal order of the school, prevent the occurrence of safety accidents, and effectively control and reduce the adverse effects of water cut-off and power failure on teaching, life and normal order of our school.
I. Guiding ideology and basic principles
(A) the guiding ideology
Adhering to the guiding ideology of "building a harmonious society" and "building a safe campus", starting from safeguarding the vital interests of teachers and students and the normal teaching order of the school, we will build an emergency system with "centralized leadership, unified command, clear hierarchy, coordination, complete structure, comprehensive functions, sensitive response and efficient operation" to comprehensively improve the ability of the school and logistics departments to deal with unexpected practical events.
(2) Basic principles
1, adhere to the principle of "people first". Safeguarding the vital interests of teachers and students and maintaining teaching order are the starting point of emergency work, and it is the important duty of school leaders at all levels to actively prevent and minimize the losses caused by accidents to school teaching and life.
2. Adhere to the principle of putting prevention first. Deal with all kinds of accidents in the daily management of pipeline industry, implement the responsibility system of each team leader, strengthen safety education and business training, improve business ability and operation level, enhance early warning analysis, do a good job in pre-plan drills, raise awareness of prevention, organically combine prevention with emergency, and effectively control the crisis.
3. Adhere to the principle of coordination. Under the command of the emergency leading group of the school's pipeline industry, all units actively cooperated and responded quickly, effectively solving various problems brought by water and power outages to school teaching and life, and minimizing adverse effects.
Second, the scope of application
Suitable for power failure and water supply caused by various reasons.
Third, the emergency organization and responsibilities
Set up an emergency team for water and power cuts in Xinglong Mountain, Shanda, to command the school's emergency actions in a unified way. The emergency response team is led by Liu Shaoxia, pipeline manager of Xinglong Mountain, and Yang Lei, engineering manager, is the deputy team leader. The team members are composed of the monitor and foreman of Hongtai Property. Yin Xunliang, manager of the construction department, is the general coordinator.
Fourth, emergency response.
(1) Emergency treatment of power failure
1. If the high-power generator is rented in time, it should be able to start normally after two hours of power failure;
2, do a good job of high and low voltage equipment, transformers, inspection of each line, do a good job of equipment must be in the best working condition every day;
3. The fuel reserve of the generator is above 300 liters, and it can work continuously for 3-4 hours;
4. In case of power failure of school lines, all departments should be informed immediately, and the emergency repair should be completed within 15 minutes. First, ensure the basic living electricity, and immediately organize personnel to the site to organize maintenance.
5. If the power supply bureau informs the whole school of power outage in advance, the logistics department should inform the whole school of power outage in advance, check the generator, make preparations for power supply, and adjust the power supply load according to the time period.
(2) Emergency response to water cut-off
1. In order to ensure the school water supply, the secondary pumping station has installed four domestic pumps, one for standby and one for use. Do a good job in the daily maintenance and repair of standby equipment, and try the machine once every two weeks to ensure that it can be started at any time.
2, do a good job in the maintenance and repair of the school waterway pipe network, if there is any rupture, leakage,
Equipment failure, etc. , immediately repair, need to stop the water can be taken in sections, and immediately notify the relevant units.
Verb (abbreviation for verb) emergency procedure
(a) in any case, any degree of water, electricity, gas, the personnel on duty must report to the pipeline industry leaders at the first time.
(2) The pipeline manager shall immediately arrange relevant personnel to carry out emergency repair, and report to the school leaders according to the time and scope of influence, and the pipeline manager shall notify relevant units to do relevant work as needed.
Sixth, the end of the state of emergency.
After the incident, the emergency leading group shall hold a summary meeting to summarize and review the occurrence and response process of the incident, and all units shall properly solve the problems left over from the incident.
Emergency Plan for Water Cut-off Accidents 4 This emergency plan is formulated in order to correctly, effectively and quickly handle water cut-off and power cut-off accidents, minimize the impact and losses caused by water cut-off and power cut-off, and ensure the normal production and office order of the company.
I. Scope of application:
The water and electricity supply crisis caused by the damage of water and electricity-related equipment and natural disasters has a great impact and serious threat on the normal production and office of the company.
Second, organization.
Team Leader: Assistant General Manager (Administrative System)
Members: responsible persons of each system, responsible persons of each branch, safety team leader, equipment specialist of administrative department and administrative specialist.
Third, the steps
(1) Stop water supply
1, planned to stop water supply.
(1) If the water supply needs to be stopped due to external or internal maintenance of the company, after receiving the notice from the water supply company or the company's maintenance department, the administrative department should inform the person in charge of the affected department half a working day in advance, telling the specific water supply time and water supply time, so as to help everyone make good work arrangements or prepare water in advance.
(2) After receiving the notice of water cut-off, all departments should check the water-using equipment and stop when necessary; The kitchen should prepare enough water in advance after receiving the notice; The safety team leader should deal with the fire water system.
Confirm water storage and ensure that the fire water system is always in working condition; The cleaning staff should prepare some clean water for everyone to wash their hands in the public toilets that are often used. Cancel after normal water supply.
(3) Each department turns off faucets or valves in their respective areas; Security personnel close faucets or valves in public toilets, supporting rooms and other areas; The person in charge of the restaurant turns off the faucet or valve in the restaurant area in time.
2. Suddenly stop water supply
(1) In case of emergency water stoppage for unknown reasons, the administrative department shall immediately notify the property to investigate the reasons for water stoppage, ask the water supply company about the reasons for water stoppage and the time to restore water supply, and give timely feedback to the heads of various systems and branches.
(2) Power failure
1, planned power outage
(1) After collecting or receiving external or internal power outage information, the Administration Department shall promptly call the heads of various systems, branches and departments to inform them of the specific power outage information, working time adjustment scheme, etc. In case of power failure during working hours, the Administration Department shall confirm with the heads of various systems, branches and departments 10 minutes before the power failure, and save the computer information in advance or shut down related equipment; The kitchen should prepare meals in advance.
(2) 10- 20 minutes before the power supply is restored, the administrative department calls the heads of various systems, branches and departments to confirm that the electrical appliances and equipment in each position are in a power-off state to avoid burning out the equipment due to unstable voltage.
2. Sudden power failure
(1) In case of sudden power failure, the administrative department shall immediately notify the property to investigate the power failure reason, and the security team leader and the equipment specialist of the administrative department will ask the power supply station about the power failure reason and when to restore power supply.
Sometimes, after the reason of power failure is clear, the person in charge of the administrative system determines the temporary working time adjustment plan, and the administrative Commissioner gives timely feedback to the person in charge of each system, branch, department and shuttle bus driver; And inform the kitchen to prepare meals.
(2) In case of sudden power failure on holidays or at night, the security team should contact the power supply station to confirm the power failure reason, and notify the administrative commissioner, who will feed back the information to the heads of all departments.
(3) When there is a power outage at night, the security team should strengthen the inspection of the factory, and if necessary, the day shift personnel can be deployed to strengthen security until the power supply is restored.
Four, the emergency plan from the date of promulgation.
Emergency Plan 5 for Water Shutdown Accident (1) Understand the situation.
1, ready to stop water after receiving the notice of water stop. Tell the project department personnel to save water during the water cut; Inform the staff to store water in advance.
2. In case of sudden water cut-off, contact the water supply office in time to learn about the water cut-off, including the length of water cut-off, the reasons for water cut-off, and when to resume water supply.
(2) Emergency procedures
1, emergency procedures for planned water stoppage
(1) When the logistics department receives a call from the water supply company to notify the water to stop, or other forms of water stop notice, it must ask about the time, length and reason of water stop, and make records.
(2) The Logistics Department shall notify the project leader (the person on duty at night), the owner and the supervisor. , and explain the reason, specific time and duration of water cut, and make preparations for temporary water supply.
(3) If the time is urgent, after receiving the notice from the water supply company, immediately notify all departments (notify the personnel on duty at night), explain the situation, send a notice to all departments, specify the time for stopping water supply, and make a plan for stopping water supply.
(4) Open temporary reservoirs to ensure basic water and construction water, and strive to minimize the negative impact of temporary water cut-off on construction.
2, temporary water emergency procedures
(1) In case of temporary water stoppage, you should immediately call the water supply company to find out the reason and duration of water stoppage.
(2) Notify all departments and owner personnel to explain the situation.
(3) If the water cut-off time is short (12 hours), notify all departments and construction personnel to explain the reasons and do a good job in explaining the temporary water cut-off.
(4) If the water is cut off for a long time, the emergency plan should be started immediately and the emergency procedures for planned water supply should be implemented.
(5) When the water supply is stopped due to the reason of the construction site, it is necessary to find out the reason of the water supply, repair it in time, troubleshoot it in the shortest time and restore the water supply.
(3) Emergency support
1, the telephone of the project department personnel ensures smooth communication at any time.
2. Check the water supply pipes and valves every day, and handle the problems in time when found.
3. If the water is cut off for more than the specified time (8 hours in winter and 4 hours in summer, depending on other seasons), mineral water shall be purchased as drinking water for personnel.
4. If the water supply is stopped for more than 48 hours, you can contact foreign aid to deliver water, such as fire officers and soldiers.
5, emergency water, enable the project department temporary reservoir, ensure the basic water and construction water.
;
- Related articles
- What about Xi Datang Boren Human Resources Co., Ltd.?
- Model essay on job responsibilities and job details of property customer service
- What are the most worthwhile school districts in Hangzhou? What factors should be considered when buying a school district house?
- Zheng Shang suo Tian Yuan garden wifi password
- Jirui Logistics, Heilongjiang Road, Licang District recruits on-board attendants online, and pays the insurance premium first. Are you a liar?
- Which bus should I take from Liangjiaxiang to No.68 Shaoling Street?
- What are the basic requirements for recruitment in Qingdao institutions?
- How about Pingyin taoranju?
- Detail drawing of residential area of Xijiao Building
- What are the specific requirements for building a national civilized city?