Job Recruitment Website - Property management - Overview of Xuzhou Metro Tourism Rail Transit Lines
Overview of Xuzhou Metro Tourism Rail Transit Lines
Xuzhou Metro 1 Line
The total length of the line is 2 1.967km, including 0.57 1km for overhead line, 20.996km for underground line and 0.4km for ground transition section. * * * There are 18 stops. The first phase of 1 line covers the east-west passenger corridor of the city, connecting the old city, Bashan area and high-speed rail business circle.
The second phase line 1 starts from Xuzhou East Station and ends at Qishan Station. The length of the line 14.63km is mainly laid along Xu Hai Road -G206- Huajian Road.
xuzhou metro line 2
The first phase of Line 2 starts from Xintaizi River in the north and ends at the East Station of New District. The first phase of the line is 23.9 kilometers long, all underground, with 19 stations and 5 transfer stations. The first phase of Line 2 (Xintaizihe Station ~ East Station of New District) connects Jiulishan area, old city and new city in series, and mainly passes through China Resources Road, Zhongshan North Road, Pengcheng Road, Jiefang Road, Liyuan Road, South Third Ring Road and Kunlun Avenue. Among them, there are 5 transfer stations: Pengcheng Square Station 1 Line, Huaita East Road Station, Line 3, Hanyuan Avenue Station, Line 4, Normal University Station and Wenboyuan Station, Line 5. It will connect two municipal centers (the center of the old city and the center of Xuzhou New District), two highway passenger hubs (the North Bus Station and the new passenger station), as well as market groups, medical care, sports, exhibition service facilities and the district government. The urban "double-heart" group will form a direct rail connection. The project started in February 20 16 and was completed in September 2020, with a total construction period of 54 months.
The second phase of Line 2 starts from Xincheng East Station and ends at Damiao Station. The line length is 1 1.05km, and it is mainly laid along Kunlun Avenue-Planning Road -X203.
xuzhou metro line 3
The first phase of Line 3 is 18.3km long, with 6 stations/kloc-0, all of which are underground lines and one depot. The first phase of Line 3 starts from Xiadian Station and ends in High-tech Zone. It is a north-south backbone line, roughly along Daqing Road-Fuxing North Road-Fuxing South Road-Huaita East Road-Xiajiefang South Road-Beijing Road-Changjiang Road-Huangshan Road-Yinshan Station-Ankeyuan, passing through Xuzhou Station, Huaihai Memorial Tower, Science and Technology Square, China University of Mining and Technology, Jiangsu Normal University, and Sanpower Square Commercial Center in Tongshan New District, and ending at South Station of High-tech Zone. It connects Jinshan Bridge area and Tongshan New District, two urban functional divisions. By then, the main urban area will form a "large-shaped" skeleton track network, giving full play to the overall benefits of the network; Promote land development along the line, especially guide the development of new areas, promote the transformation of old cities, and give play to the guiding role of rail transit.
The second phase of Line 3 starts from Pantao Village Station at the intersection of Zhenxing Avenue, runs along Tuolanshan Road and Xiadian Road, and ends at Xiadian Station in the first phase. The total length of the line is about 6.9km, all of which are underground. There are 5 stations and a parking lot in Houpantao Village.
xuzhou metro line 4
Line 4 starts from Taishangcun Station on the south side of G30 Lianhuo Expressway, goes north along Planning Road-Xincha Line-Daxue Road-Sanhuan South Road, passes through Zhaishan area and reaches Guo Zhuang Airport area. After that, it will be laid northward along Hanyuan Avenue-Yangshan Road-Pantaoshan Road-Jinshui Road-Jingshan Road-Sanhuan East Road, and the terminal will be located at Liuwan Village Station. The total length of the line is about 33.9km, with 25 stations, including 8 transfer stations, and the average station spacing is 1.4km, all of which are underground lines. Yinshan parking lot and Longzhuang depot will be built.
According to the recent planning (20 18-2024), the construction scale of Xuzhou urban rail transit is 104.8km, with 73 stations, including 6 urban rail lines, including 1, Line 2 and Line 3, Line 3, Line 4, Line 5 and Line 6. According to Yuan Jing's network planning, Xuzhou urban rail transit consists of 7 urban rail lines and 4 urban rail express lines, with a total scale of 323. 1km and 65.438+077 stations. According to the plan, on the basis of the general rail network, our city will strengthen the connection between the city center and the peripheral groups, and timely build the Jiawang direction rail express line.
xuzhou metro line 5
Line 5 starts from Sundian Village Station at the intersection of National Highway 104 and Daba Road, and goes north along Daba Road-Planning Road-Xinyuan Avenue-Emei Road to reach the Central Vitality Zone. After laying northward along Qingfeng Road-Heping Road-Hubei Road-Erhuan West Road-Pingshan Road, it ends at Xukuangcheng Station. The total length of the line is about 33.5km, and there are 23 stations, including 9 transfer stations, all of which are underground lines. A new depot will be built in Sundian Village and a new parking lot will be built in Xukuang City.
Xuzhou Metro Line 6
Line 6 starts from Zhujiang Road Station on the west side of the intersection of University Road and Zhujiang Road, and goes along Zhujiang Road-Huashan North Road-Huanghe West Road-Huanghe East Road to Huimin Community. After that, it will be laid along Huimin Road-Hanfeng Road via the Olympic Sports Center in the north and the Beijing-Shanghai high-speed railway in the east and north, and the terminal will be located at Xuzhou East Station. The total length of the line is about 30.7km, and there are 20 stations, including 6 transfer stations, all of which are underground. Newly-built Wangzhuang Depot and high-speed railway station Parking Lot.
Xuzhou Metro Line 7
Line 7 starts from the northern part of the western new town, runs along Jiulishan West Road-Tianqi North Road-Pentium Avenue, passes through the freight yard of Xuzhou North Station in beijing-shanghai railway, then crosses the mountain to Shuangyong Road via Xugang Road, and reaches Xuzhou East Station in the east. Go south along the Beijing-Shanghai high-speed railway to Peng Zu Avenue in Xincheng, then cross the Beijing-Shanghai high-speed railway to the east, and go east along the planned road from Peng Zu Avenue to Chengdong Business District, ending at Luzhuangcun Station.
Xuzhou Metro Line S 1
The total length of S 1 line is 27.6km, and there are 4 stations 1 station, among which, transfer to the station1station with the general rail line. The line starts from the transfer station of 1 line and Line 2, goes along JOE Expressway-Liujia Line (X303)-G206 (quancheng road)-Hongfu Road, and ends in Feng Minghai.
Xuzhou Metro S2 Line
The total length of S2 line is 3 1.9km, and there are 2 stations1,including 2 interchange stations with the general rail line. The line starts from the subway passenger station of Line 6, goes along G 104 to Xuzhou Guanyin International Airport, then goes southbound via G 104 interchange, and ends at Xuzhou Huaiyan Shuanggou Station.
Xuzhou Metro S3 Line
The total length of S3 line is 35.2km, with a total of 6 stations/kloc-0, including 3 interchange stations with the rail bus. The line starts from Taishan Road Station of Line 4, along Sanhuan South Road-Xingshanzi Avenue-Sanhuan West Road -—S322, and ends in Huangji Town.
Xuzhou Metro S4 Line
S4 line is the extension of Xuzhou Metro 1 line, the second inter-provincial subway in China. It is planned to start at Hanwang Xincheng Station and end at Xiaoxian North Station.
- Previous article:What's the difference between China real estate and foreign real estate?
- Next article:How long does Hua Fei property get paid?
- Related articles
- What is the sales service hotline of Guangzhou Vanke Jinyu Yuefu?
- Why do property managers frequently recruit people?
- Has the parking charge of Nanjing Cuidao Huacheng Property been approved by the Price Bureau?
- Has Aocheng started construction in the Sunac era of Xi 'an?
- Long Mai Hot Spring Resort (Long Mai Hot Spring Garden) is located in Long Mai Hot Spring Garden.
- How about Zhanjiang Ding Yu Real Estate Development Co., Ltd.?
- Brief introduction of Rongchuang
- Which province is Shaoguan?
- When will 2065438+2008 Pujiang Ziyue House open?
- How about Shanxi Yurun Real Estate Development Co., Ltd.?