Job Recruitment Website - Property management - Simple version of engineering transformation contract model

Simple version of engineering transformation contract model

Contract is a tool to protect people's legitimate rights and interests, so signing a contract is a very important and necessary process. The following is the Simplified Edition of Project renovation contract Model compiled by me for your reference only. Welcome to reading.

Engineering renovation contract Template Simplified Edition (I) The Contractor (hereinafter referred to as Party A) _ _ _ _ _ _ _ _ _ _ _ _ _

The Contractor (hereinafter referred to as Party B) _ _ _ _ _ _ _

After friendly negotiation, Party A decides to entrust Party B with the house decoration. In order to protect the legitimate rights and interests of both parties, combined with the specific conditions of this project, the two parties reached the following agreement for common compliance.

I. Overview of the Project

1. Decoration construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. House structure: X halls with a building area of xx square meters.

3. Decoration construction content: See Annex 1 Decoration construction content table for details.

4. Contracting method: _ _ _ _ _ _ _ (contracting for work and materials, contracting for work and materials, and partial contracting)

5. Duration: from _ _ _ _ _ _ _ _ _

Second, the project price and settlement agreement

Total project price: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Three. Material supply agreement

_________________________________。

Four. Project quality and acceptance agreement

_________________________________。

Five, safety production and fire prevention agreement

_________________________________。

Other matters of intransitive verbs

_________________________________。

Seven. responsibility for breach of contract

1. If the construction period is delayed or suspended due to Party A's reasons, Party A shall compensate Party B for the losses caused by suspension or slowdown, and Party A shall pay Party B _ _ _ yuan for every _ _ _ days of suspension; If Party A fails to make payment as agreed in the contract, Party A shall pay a penalty of RMB _ _ yuan for every _ _ days overdue.

2. If the completion of the project is delayed due to Party B's reasons, Party B shall pay _ _% of the payment made by Party A as liquidated damages for every _ _ days overdue.

Eight, dispute handling methods

Any dispute arising from the execution of the contract between the two parties shall be settled through friendly negotiation. If negotiation fails, a lawsuit may be brought to the people's court.

Nine. Alteration and termination of the contract

After this contract is signed by both parties, both parties must strictly abide by it.

X. Contract reservation

This Contract is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A: _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _

Date of signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project renovation contract Template Simplified Edition (II) Entrusting Party (Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Organizer (Party B): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for * * * to abide by.

Article 1: Project Overview

1. Project address: _ _ _ _ _ _ _

2. Room specifications: _ _ _ _ _ _ _

Total: the construction area is _ _ _ _ _ square meters.

3. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _

4. Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Total days of the project: _ _ days

Article 2: Project Price

Project price (amount in words) _ _ yuan.

Article 3: Quality Requirements

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.

2. Regarding the acceptance standard of this project, both parties agree to refer to Zhejiang local standard "Acceptance Standard for Residential Decoration".

3. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased costs.

Article 4: Method of Payment

1. After signing the contract, Party A shall pay% of the engineering materials and% of the engineering cost; When the construction period is over half (_ _ _ _ _ _), Party A will pay _ _% of the second project cost. The remaining _ _% shall be settled by Party A after the project is completed and accepted. (Note: Construction costs include labor costs)

Party A pays off the project price, and Party B issues a unified invoice, handles the handover to Party A, and issues a decoration project warranty card.

Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use.

2. If there is any increase or decrease in the project or need to be changed during the project construction, both parties shall sign a supplementary contract, and Party B shall be responsible for issuing the construction change form and notifying the person in charge of the construction site. Increase or decrease the project price and settle on the spot.

3. If Party A fails to prepay the project price within the time limit stipulated in this contract, Party A shall pay _ _% of the unpaid project price to Party B for every _ _ days overdue.

4. If Party A mortgages the house decoration to the bank, it shall hand over the mortgage certificate and relevant documents (copies) to Party B. ..

Article 5: Liability for breach of contract

After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 5% of the total contract amount as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.

Article 6: Modification and Termination of the Contract

1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, pay liquidated damages at% of the total contract price, and go through the termination procedures.

2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in written form. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.

Article 7: Entry into force of the contract

1. This contract shall be sealed by both parties and come into force after being signed.

2. This contract was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A: (signature) _ _ _ _ _ _ Party B: (signature) _ _ _ _ _ _ _

Project renovation contract Template Simplified Edition (III) Party A (residential decoration manager): _ _ _ _ _ _ _ _ _ _ _

Party B (residential decoration contractor): _ _ _ _ _ _ _ _ _ _ _

In order to strengthen the management of residential property decoration and standardize the behavior of property decoration, Party A and Party B, through consultation, have reached the following agreement on the management of residential property decoration in Shanghai, the Notice on Further Strengthening the Management of Residential Property Decoration in Shanghai and the Interim Provisions on the Management of Family Room Decoration in Shanghai.

The first section of the basic situation of residential decoration

1. Residential building area: _ _ _ _ m2; Structure type: _ _ _ _ _ _.

2. The renovation period is _ _ days, which is expected to last from _ _ _ to _ _ _ _ _.

Article 2 Party A shall conduct daily inspection and management of Party B's house decoration according to relevant laws and regulations and the previous property management contract or property management service contract, so as to ensure the safety of the house and safeguard the normal use of public facilities and the legitimate rights and interests of neighboring owners.

1. Inform Party B of the laws and regulations related to decoration, prohibited decoration behaviors, parts forbidden to be chiseled, matters needing attention and matters needing attention in residential decoration, etc. To publicize matters needing attention in residential decoration to Party B's personnel who enter the residential area, handle temporary residence permits for decoration workers, and designate centralized dumping sites for construction waste.

2. Check the pass for Party B's personnel to enter the residential area at any time. If it is found that the certificate has expired, it shall be renewed in time, and the unlicensed decoration construction personnel shall be refused to enter the residential area to engage in construction activities.

3. According to Party B's renovation progress, concealed works involving water, electricity, gas and structure shall be inspected at least _ _ times a day. Other renovation projects shall be inspected at least _ _ _ times a day. Measures such as dissuasion, warning and written rectification notice should be taken in time when violations are found.

Involving the safety of housing structure, it shall promptly notify the owners' committee and report to the district and county real estate management departments for investigation and punishment according to law.

4. If Party B fails to rectify in time, in order to protect the interests of neighboring owners from infringement, corresponding measures should be taken, such as taking back the temporary residence permit, and instructing relevant construction personnel to quit the residence until Party B corrects and goes through the confirmation procedures. If the public parts or equipment and facilities are damaged due to improper construction, the responsible person shall be urged to make timely compensation.

If the prevention fails, a civil lawsuit can be brought directly to the people according to the agreement.

Article 3 Party B shall strictly abide by the relevant laws and regulations of this Municipality and the instructions for residential decoration, accept the publicity organized by Party A, sign a residential decoration management agreement with Party A, and handle the temporary residence permit and residential decoration construction notice board before the construction starts.

1. Party B has the right to know the basic information of the structure, equipment and public facilities of the renovated house from Party A.. Party B may reject the unreasonable requirements put forward by Party A that are beyond the policies and regulations and this Agreement.

2, construction personnel into the community, consciously wear a pass, personnel changes, should take the initiative to change procedures. Construction personnel shall conduct civilized and standardized construction, obey the management of Party A's personnel, and shall not affect the normal use of adjacent owners or users.

3. Keep the uniform appearance of the house. Do not arbitrarily close the balcony, install external hangers, awnings, flower stands and install air-conditioning outdoor units. Security fence, etc. Shall not violate the prohibition stipulated in the Regulations. If the adjacent owners' houses or public parts are damaged due to improper decoration, they shall be liable for maintenance and compensation.

4. Effective measures should be taken during the construction period to reduce or avoid the influence of the construction process on the daily life of adjacent owners or users. During _ _ _ _ _ night to _ _ _ _ morning and holidays, it is forbidden to engage in construction that produces serious noise, such as knocking, chiseling, sawing and drilling.

5. During the construction period, individual doors should be closed, and building materials should not be piled up on public walkways. Construction waste. We should consciously maintain the public order in the community, do not scribble, scribble or scribble in public areas, and keep the environment clean and tidy. Construction waste should be bagged, transported at the specified time and piled up at the designated place. After transporting materials or garbage, it should be cleaned up in time to keep public parts clean.

6, construction personnel must stay, should ensure that the adjacent owners or users unimpeded, and in accordance with the provisions, to the local police station for temporary residence permits.

7. During the construction period, the construction must be listed, supervised by neighboring owners, owners' committees and Party A, and necessary protective measures shall be taken for public areas (including lobby, elevator hall, elevators, stairs and corridors, etc.). ).

8. After the completion of the construction, Party A shall provide Party A with information such as the layout of residential decoration pipelines and return the temporary residence permit.

Article 4 Liability for breach of contract

1. If Party A fails to handle relevant renovation procedures for Party B as agreed in this agreement, it shall be responsible for delaying working hours.

Party A's failure to perform management duties and deliberately making things difficult for Party B are caused.

The loss should be compensated.

2. If Party B arbitrarily changes the decoration and construction personnel and fails to apply for a temporary pass for the community, Party A may refuse them to enter the community to engage in construction work, and the losses caused thereby shall be borne by Party B. ..

Article 5 In case of any dispute during the performance of this Agreement, all parties shall settle it through consultation. If negotiation fails, the people can bring a civil lawsuit.

Article 6 Term of this Agreement: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Article 7 This Agreement shall come into force after being signed and sealed by both parties. This agreement is made in duplicate, with each party holding one copy.

Party A (seal): _ _ _ _ _ _ _ _ _ _ _

Legal representative or authorized agent (signature): _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (seal): _ _ _ _ _ _ _ _ _ _ _

Legal representative or authorized agent (signature): _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _