Can I install charging piles on the fourth floor?

Charging piles can be installed on the fourth floor.

You have to apply to the property first. The property requires a good photo and a driving license before applying. Mainly need to seal up the property. It takes about 7 days to stamp. On the seventh day, the property itself called to say that the application was passed and stamped, and then the property was stamped and sent to the power supply bureau.

F power supply bureau requires to fill in an application form for personal electricity consumption, and there are more signatures than buying a house. I have no way or time to watch it. People can sign anywhere, download a power company app after signing, and make an appointment to apply for an electric meter online. After the end, wait for the personnel from the power supply bureau to come to the site to see if there are conditions for installation and charging, that is, the power supplier.

The next day, someone from the power supply bureau called and walked around the parking space. The parking lot is powered by the property company itself, and the voltage is stable. Moreover, the property agreed to connect electricity, so the parking lot was connected with electricity, and finally the meter box in the power supply company building was found. The power supply bureau will only be responsible for the wiring before the meter, and the wiring from the meter to the parking space is its own responsibility, and it is still very professional. Only qualified electricians can pass the audit. Finally, the power supply bureau will send someone to confirm that the wiring is qualified before giving it.